Business Plan Works Different Sites In The Area Of Edsd Iii Bhola Under Edd Iii Meerut- Cartage Of Following Material From Store Center Meerut To Je Store Including Loading & Unloading At Both Ends Maximum Distance Up To 40 Km. :- 2 St Pole 11 Mtr. Long
Tender Overview
Project Description
Business Plan Works Different Sites In The Area Of Edsd Iii Bhola Under Edd Iii Meerut- Cartage Of Following Material From Store Center Meerut To Je Store Including Loading & Unloading At Both Ends Maximum Distance Up To 40 Km. :- 2 St Pole 11 Mtr. Long. / Pcc Pole 8.5 Mtr Long 3 Line Material Such As 11 Kv Cross Arms 11 Kv Pin, 11 Kv Pin Insulator, 11 Kv Disc, Stay Rod, Stay Wire Acsr Weasel Conductor, Gi Wire, Ms Angle Iron & Ms Channel, Tpmo, Fuse Set Etc. 4 Acsr Weasel Conductor 5 Lt Pvc Cable All Sizes 6 250 Kva Transformer 7 25 Kva To 100 Kva Transformer 8 Cartage Of Following Material From Je, Store To Site Of Work Including Loading & Unloading At Both Ends Maximum Distance Up To 15 Km. :- 9 St Pole 11 Mtr. Long. / Pcc Pole 8.5 Mtr Long 10 Line Material Such As 11 Kv Cross Arms 11 Kv Pin, 11 Kv Pin Insulator, 11 Kv Disc, Stay Rod, Stay Wire Acsr Weasel Conductor, Gi Wire, Ms Angle Iron & Ms Channel, Tpmo, Fuse Set Etc. 11 Acsr Weasel Conductor 12 Lt Pvc Cable All Sizes 13 250 Kva Transformer 14 25 Kva To 100 Kva Transformer 15 Erection Of Stp Pole 11 Mtr Long After Digging A Pit Of Size 1.20 X 0.60 X 1.6 Mtr In All Type Of Soil Including Back Filling Of The Pole With Proper Ramming After Completion Of Work. 16 Fabrication And Fixing Of All 11 Kv Ht Line Accessories. 17 Erection Of Double Pole On Stp11 Mtr After Digging A Pitt Of Size 1.20 X 0.60 X 1.6 Mtr In All Type Of Soil For Each Pole Including Back Filling Of The Pole With Proper Ramming After Completion Of Work. 18 Fixing Of 11 Kv Tpmo With On Existing On Double Pole 19 Fixing Of 11 Kv Fuse Set With On Existing On Double Pole 20 Fabrication And Fixing Of Ms Angle And Ms Channel, Fixing All 11 Kv Accessories Tpmo, Fuse Set 11 Kv Pin Insulators. 21 Opening And Binding St Jumper 100 Kva And 25 Kva And 63 Kva T / F After Dismental 22 Mounting Of 25 To 100 Kva T / F With Proper Jumping Of Ht Side And Fixing Of Cable On Lt Side Of T / F. 23 Earthingh Of Each 11 Kv Line Pople & T / F Properly After Drive Of Electrodes If Size 20Mm X 250 Mm And Connection The Earthing Point With Gl Wire. 24 Mounting Of Plinth 250 Kva Transformer Grouting Of Stp Pole With Bb Concreeting In Block Of Size 0.45X0.45X1.6 Mtr In Reso Of 1:4:8 Of Cement Send And Brick Ballast 25 Construction Of 250 Kva Transformer Foundation Of Plinth. 26 Frp Fencing For 250 Kva Transformer And Grouting Plinth And Fencing Etc. Work. 27 Water Level Earthing With Gi Pipe 32 Mm Dia And Ms Flat Of Size 45X5mm 28 Making A Section Pole To Exist Pole After Fabrication & Fixing Of T Channel Fixing Of All 11 Kv Accessories. 29 Erection Of Stay Rod Complete After Digging A Pit Of Size 1.20 X0.60 X 1.6 Mtr And Grouting The Same In Block Of Size 0.60 X 0.60 X 0.30 Mtr And Nuzzling At The Both Ends And Filling The Pit With Excavated Earth Soil With Proper Ramming. 30 Cutting & Chopping Tree Branches Near Side Of Line For Making The Clearance Between Line And Tree. 31 Fixing And Lifting Of Lt Distribution Box 3 Ph. Single Phase Lt Line 32 Pvc Lead And Joint The Connection Of Lt Distribution Box 33 Providing And Fixing Stay Clamps. 34 Providing And Fixing Holding Clamps. 35 Providing And Fixing F Clamps. 36 Providing And Fixing Bolt And Nuts. 37 Dissmentling Of 25 Kva To 100 Kva Transformer Old And Use ( Scrap ) In Je, Store
BOQ
| Sl. No. | Item Description |
| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :- |
| 2 | ST Pole 11 Mtr. Long./PCC Pole 8.5 Mtr Long |
| 3 | Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set etc. |
| 4 | ACSR Weasel Conductor |
| 5 | LT PVC Cable all sizes |
| 6 | 250 KVA Transformer |
| 7 | 25 KVA to 100 KVA Transformer |
| 8 | Cartage of following material from JE, Store to site of work including loading & unloading at both ends maximum distance up to 15 Km. :- |
| 9 | ST Pole 11 Mtr. Long./PCC Pole 8.5 Mtr Long |
| 10 | Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set etc. |
| 11 | ACSR Weasel Conductor |
| 12 | LT PVC Cable all sizes |
| 13 | 250 KVA Transformer |
| 14 | 25 KVA to 100 KVA Transformer |
| 15 | Erection of STP Pole 11 mtr long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 16 | Fabrication and fixing of all 11 KV HT line accessories. |
| 17 | Erection of Double pole on STP11 Mtr after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work. |
| 18 | Fixing of 11 KV TPMO with on existing on double pole |
| 19 | Fixing of 11 KV fuse set with on existing on double pole |
| 20 | Fabrication and fixing of MS angle and MS channel, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators. |
| 21 | Opening and binding ST jumper 100 KVA and 25 KVA and 63 KVA T/F after dismental |
| 22 | Mounting of 25 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT side of T/F. |
| 23 | Earthingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GL wire. |
| 24 | Mounting of Plinth 250 KVA Transformer Grouting of STP Pole with BB Concreeting in block of size 0.45x0.45x1.6 mtr in reso of 1:4:8 of cement send and brick ballast |
| 25 | Construction of 250 KVA Transformer foundation of Plinth. |
| 26 | FRP Fencing for 250 KVA Transformer and grouting plinth and fencing etc. work. |
| 27 | Water level earthing with GI Pipe 32 mm Dia and MS Flat of size 45x5mm |
| 28 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. |
| 29 | Erection of stay rod complete after digging a pit of size 1.20 x0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 30 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. |
| 31 | Fixing and lifting of LT Distribution Box 3 ph. Single Phase LT Line |
| 32 | PVC Lead and joint the connection of LT Distribution Box |
| 33 | providing and fixing stay clamps. |
| 34 | Providing and fixing Holding clamps. |
| 35 | Providing and fixing F clamps. |
| 36 | Providing and fixing Bolt and Nuts. |
| 37 | Dissmentling of 25 KVA to 100 KVA Transformer Old and use(Scrap) in JE, Store |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender