| 1 | Work |
| 2 | Earth work in excavation in foundation in ordinary soil including lead up to 30m.and lift up to 1.50m. Including filling watering and ramming of excavated earth in to the space between building and site of foundation trenches e.t.c As per S.I.No251 |
| 3 | Cement concretewith 4.00cm gauge brick ballast sand of 1.25 F.M and cement in the proportion of 12:6:1 in including supply of all materials labour and tools and plants e.t.c required for proper completion of the work.As per S.I No273 ForSide Walland Road 273 |
| 4 | Construction of granular Sub-base by providing well graded materials,sprading in uniform layers with motor grader/tractor mounted appropriate equipement on perpared surface mixing by mix in place mathod with rotavator at OMC,And compacting with smooth wheel roller to achived the desired density,compleate as per Techinical Specification Clause 401 |
| 5 | Supply and laying of 125micron polythene sheet over sub base to act sepration between sub base and concrete slab including spply of all materials and labour T&P e.t.c. required for proper completion of the work As per S.I No730-4 |
| 6 | M-150sub class A Bricks work in 1:4 with cement and approved coarse sand mortar in foundation and plinth including supply of all materials and labour T&P e.t.c As per S.I No305 |
| 7 | Laying C.C.Road slab 10cm (4\") thick consisting of 1:2:4 cement ,course sand and approved 2cm gauge stone grite over prepared sub grade e.t.c As per S.I.No-773 |
| 8 | Making and filling expansion and construction joints with bitumin 40%Asbestos 5%and coarse sand 55%including all in C.C road e.t.c( N.S) |
| 9 | Earth work in embankment in ordinary soil including 30m lead and 1.50m lift e.t.c As per S.I.No-253 |
| 10 | U-Drain |
| 11 | E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Ias per S.I. No. 251 |
| 12 | Brick work in 1:4 ( one cement and Three corse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305(b) |
| 13 | Providing and laying Cement concrete 1:4:8( l cement : 4 coarse sand : 8 graded brick ballast 40 mm. nominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 275 |
| 14 | Plastering with cement mortar (1:4), 12mm thick on brickwork in substructure as per technical specification as per SI No 584 |
| 15 | Providing and laying Cement concrete 1:2:4 ( l cement : 2 coarse sand : 4 graded stone ballastnominal size ) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per Si No 279 |
| 16 | 600 H.P CULVERT |
| 17 | E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/Ias per S.I. No. 251 |
| 18 | Providing and laying Cement concrete 1:4:8 ( l cement : 4 coarse sand : 8 graded stone ballast 40 mm. nominal size ) in foundation including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation as per SI No 275 |
| 19 | Brick work in 1:4 ( one cement and four coarse sand mortar ) including supply of all materials, labour & tool & plants etc. required for proper completion of work. As per SI No 305 |
| 20 | Stuck Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 as per PWD SI No 574 |
| 21 | Supply of N P -3 Hume Pipe |
| 22 | Laying of Hume Pipe |
| 23 | GST @ 12% |