Water Supply Scheme At Srimantapur Under Arwsp ( Sub-Mission ) / Design, Supply And Construction Of 0.55Mgd ( 2.50Mld ) Sixteen Hours Pumping Capacity Water Treatment Plant In / C. Civil, Mechanical, Electrical Works, Supply Of Al-Tripura

Public Works Department-PWD has published Water Supply Scheme At Srimantapur Under Arwsp ( Sub-Mission ) / Design, Supply And Construction Of 0.55Mgd ( 2.50Mld ) Sixteen Hours Pumping Capacity Water Treatment Plant In / C. Civil, Mechanical, Electrical Works, Supply Of Al. Submission Date for this Tender is 24-01-2022. Earth Moving Machinery Tenders in Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

30537557
Water Supply Scheme At Srimantapur Under Arwsp ( Sub-Mission ) / Design, Supply And Construction Of 0.55Mgd ( 2.50Mld ) Sixteen Hours Pumping Capacity Water Treatment Plant In / C. Civil, Mechanical, Electrical Works, Supply Of Al
Open Tender
Indian
Tripura
24-01-2022

Tender Details

Water Supply Scheme At Srimantapur Under Arwsp ( Sub-Mission ) / Design, Supply And Construction Of 0.55Mgd ( 2.50Mld ) Sixteen Hours Pumping Capacity Water Treatment Plant In / C. Civil, Mechanical, Electrical Works, Supply Of All Necessary Equipments, Te- 1 Boundeary Wall 2 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Meansover Areas ( Exceeding 30Cm In Dept 1.5M In Width As Well As 10 Sqm On Plan ) Including Disposal Of Excavated Earth, Lead Up To 50M And Lift Up To 1.5M, Disposed Earth To Be Levelled And Neatly Dressed. 3 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means In Foundation Trenches Or Drains ( Not Exceeding 1.5 M In Width Or 10 Sqm On Plan ) Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M. -All Kinds Of Soil 4 Filling Available Excavated Earth ( Excluding Rock ) In Trenches, Plinth, Sides Of Foundations Etc. In Layers Not Exceeding 20Cm In Depth, Consolidating Each Deposited Layer By Ramming And Watering, Lead Up To 50 M And Lift Upto 1.5 M. -All Kinds Of Soil - 5 Supplying And Filling In Plinth, Under Floor, Foundations Etc. With Sand ( Fine ) From Local Quarry With All Lifts Including Spreading In Horizontal Layers, Watering, Grading To Required Slope, Ramming, Consolidating And Compacting Each Layer By Using Plate Compactor Or By Any Suitable Method Complete. 6 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring And Shuttering - -All Work Upto Plinth Level:I ) . 1:3:6 ( 1 Cement: 3 Fine Sand : 6 Graded Well Burnt Brick Aggregate 20 Mm Nominal Size ) 7 Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete Excluding The Cost Of Centring, Shuttering, Finishing And Reinforcement- -All Work Upto Plinth Level: I ) .1:1.5:3 ( 1 Cement: 1.5 Fine Sand : 3 Graded Well Burnt Brick Aggregate 20 Mm Nominal Size 8 Reinforced Cement Concrete Work In Walls ( Any Thickness ) , Including Attached Pilasters, Buttresses, Plinth And Skirting Courses, Fillets, Columns, Pillars, Piers, Abutments, Posts And Struts Etc. Upto Floor Five Level Excluding Cost Of Centring, Shuttering, Finishing And Reinforcement- I ) .1:1.5:3 ( 1 Cement: 1.5 Fine Sand : 3 Graded Well Burnt Brick Aggregate 20 Mm Nominal Size 9 Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Floor Five Level.Thermo-Mechanically Treated Bars / Cold Twisted Deformed Steel Bars 10 First Class Brick Work In Foundation And Plinth Including Cost Of All Materials As Required Complete:- I ) In Cement Mortar 1:4 ( 1 Cement : 4 Fine Sand ) 11 Half Brick Masonry Work With First Class Bricks In Superstructure Upto Floor Five Level Including Cost Of All Materials As Required Complete:-I ) .In Cement Mortar 1:4 ( 1 Cement : 4 Fine Sand ) 12 Centering Shuttering Including Strutting, Propping Etc. And Removal Of Form Work For ( A ) . Foundations, Footing, Bases For Columns Etc. For Mass Concrete With Timeber Plank. 13 ( B ) . Column, Pillar, Piers, Abutment, Posts And Struts With Wooden Plank 14 12 Mm Cement Plaster Of Mix I ) .In Cement Mortar 1 : 4 ( 1 Cement : 4 Fine Sand ) 15 Neat Cement Punning. 16 Finishing Walls With Water Proofing Cement Paint Of Required Shade Of Approved Brand And Manufacture ( Payment Shall Be Made After Submission Of Test Certificate Issued By The Manufacturer . New Work ( Two Or More Coats Applied @3.84Kg / 10Sqm. ) 17 Painting With Synthetic Enamel Paint Of Approved Brand And Manufactureto Give An Even Shade. [ Payment Shall Be Made After Submission Of Test Certificate Issued By The Manufacturer ] Two Or More Coats On New Works 18 Providing Structural Steel Workin Single Section Fixed With Or Without Connecting Plateincluding Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete As Required. 19 Steel Work In Built Up T Section / Framed Work Including Cutting, Hoisting, Fixing In Position Andapplying A Priming Coat Of Approved Steel Primer Using Steel Etc. Complete As Required. In Grating, Frames, Guard Bar, Railing Brackets, Gates And Similar Works All Complete 20 Providing And Fixing Hard Drawn Steel Wire Fabric 75X25mm Mesh Of Weight / Not Less Than 7.75 Kg. Per Sqm In Fencing Work

Key Value

Document Fees
INR 1000 /-
EMD
INR 31832.0 /-
Tender Value
INR 31.83 Lakhs /-

BOQ Items

Name of Work:- Water Supply scheme at Srimantapur under ARWSP( Sub-Mission) /Design, supply and construction of 0.55MGD(2.50MLD) sixteen hours pumping capacity water treatment plant in/c. civil, mechanical, electrical works, supply of all necessary equipments, testing and successful commissioning of the plant etc. complete in all respect at Srimantapur under Kathalia R.D. Block of West Tripura district. /SH:- Construction of bounary wall around 0.55 MGD SWTP at Srimantapur under Kathalia RD Block during the year 2020-21 under JJM Scheme (2nd Call)
Sl. No. Item Description
1Boundeary wall
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual meansover areas (exceeding 30cm in dept 1.5m in width as well as 10 sqm on plan ) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed.
3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil -
5Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
6Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level:i). 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
7Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: i).1:1.5:3 ( 1 Cement: 1.5 fine sand : 3 graded well burnt brick aggregate 20 mm nominal size
8Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- i).1:1.5:3 ( 1 Cement: 1.5 fine sand : 3 graded well burnt brick aggregate 20 mm nominal size
9Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars
10First class brick work in foundation and plinth including cost of all materials as required complete:- i) In cement mortar 1:4 ( 1 cement : 4 fine sand )
11Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-i).In Cement mortar 1:4 ( 1 cement : 4 fine sand )
12Centering shuttering including strutting, propping etc. and removal of form work for (a). Foundations, footing, bases for columns etc. for mass concrete with timeber plank.
13(b). Column, pillar, piers, abutment, posts and struts with wooden plank
1412 mm cement plaster of mix i).In cement mortar 1 : 4 ( 1 cement : 4 fine sand )
15Neat cement punning.
16Finishing walls with water proofing cement paint of required shade of approved brand and manufacture (Payment shall be made after submission of Test Certificate issued by the Manufacturer . New work (two or more coats applied @3.84kg/10sqm.)
17Painting with synthetic enamel paint of approved brand and manufactureto give an even shade. [Payment shall be made after submission of Test Certificate issued by the Manufacturer] two or more coats on new works
18Providing structural steel workin single section fixed with or without connecting plateincluding cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as required.
19Steel work in built up t section/ framed work including cutting,hoisting, fixing in position andapplying a priming coat of approved steel primer using steel etc. complete as required. In grating, frames, guard bar, railing brackets, gates and similar works all complete
20Providing and fixing hard drawn steel wire fabric 75X25mm mesh of weight/ not less than 7.75 Kg. per sqm in fencing work
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail