| 1 | BILL NO.1 : ROAD MAINTENANCE |
| 2 | Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawingsas per MORTH specification clause 3003 |
| 3 | Trimmingofgrass,shurbsandweedsfromthe shoulders /bermsanddisposingoffthesametosuitable locations etc. Complete |
| 4 | Supplying unskilled labourers for work at road site as per instruction of engineerin charge. |
| 5 | BILL NO 2 : ROAD PROPERTY MAINTENANCE |
| 6 | The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains etc. Complete |
| 7 | Maintenance of Hume pipe Culvert by way ofClearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing etc. Complete |
| 8 | Hiring hydraulic Excavator (Wheeled) for removing material/tree/debris etc. from road site as per instructions of Engineer in Charge. |
| 9 | Hiring Tractor with trolly for conveying material/tree/debris etc. from road site as per instruction of engineer in charge. |
| 10 | BILL NO 3 : PAVEMENT REPAIRS |
| 11 | White washing two coats on parapet walls and white washing and geru lime painting to tree trunks including preparation of surface by cleaning scrapingetc. complete |
| 12 | Providing andlaying bituminous macadam usingcrushed aggregates of Grading1,premixed with bituminous binder ,transported to site with VTS ,laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80/100 mm compacted thickness with 3.3% using specified grade of Bitumen.--USING Batch mix type hot mix plant with SCADA, Sensor Paver, vibratory roller.(VG-30 bulk bitumen rates are considered to arrive at rates.Including tack coat 2.5kg/10m2) |
| 13 | Providing and laying bituminous concrete using crushed aggregate of grading1, premixed with bituminous binder @5.40% by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface, finished to the required grade, level,alignment,and rolling to achieve the desired density for 50mm compacted thickness with batch mix plant with SCADA, Sensor paver and Vibratory roller excluding prime/ Tack coat etc.complete--Bitumen of specified grade with stone dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) |
| 14 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. I No 2.29a & Including Spreading hard murum/ soft murrum/ gravel or kankar for side width complete. I No 2.30 & Including Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. |
| 15 | GST 18% |
| 16 | Add 0.50% Labour Inshurance |