| 1 | Entire Manhole covers and rubber packing inclode all door and all air vent& all hatchs/tanks damaged rubber,nuts ,bolts & studes same to be checked, repaired/ renewed by good quality of rubber & ss fittngs including labour and materials. |
| 2 | Routine maintenance of both the Main engine (Make:- CUMMINS, Model- 855, BHP- 270) to be done includingservicing of pannel board with all electronic system and safety systems i.e. temperature meter, gauge,andrenewal of all perished/damaged and shaft bearing & power bearing same to be arrested rubber hoses emergancy stop in pannel board in wheel house is broken same to be repaired/replacedas per direction of IRS Surveyor/EIC. |
| 3 | Labour charges |
| 4 | Cost of spare/material actual + 10% basis |
| 5 | Top Overhauling ofgenerator engine-II make Simpson,(42BHP) is to be done including servicing/repair of switch board with all electronic system and safety system i.e. Temperature meter, gauges,andemergency stop switch, sensor and ammeter & phase indicators lightrenewal of all perished/damaged rubber hoses as as per direction of EIC. |
| 6 | Labour charges |
| 7 | Cost of spare/material actual + 10% basis |
| 8 | Routine maintenance ofgenerator engine-I make Kirloshkeris to be done including servicing/repaired of switch board with all electronic system and safety system i.e. Temperature meter, gauges, sensors, emergency stop switch,andammeter & phase indicators lightrenewal of all perished/damaged rubber hoses as as per direction of EIC. |
| 9 | Labour charges |
| 10 | Cost of spare/material actual + 10% basis |
| 11 | Sea water pump fresher water pump and G.S. Pump of both main engine and both generator are not working properly, same to be servicing and rectify the all defects (gauges indicatorsdischarge pressure gauges) as per direction of IRS Surveyor/EIC. |
| 12 | Labour charges |
| 13 | Cost of spare/material actual + 10% basis |
| 14 | All electrical/ Electronics line AC/DC, navigation light,helozen light,search light, fan,tube light, emergency bell, horn, all panel board, sensor of engine, exhaust fan in kitchen,toilet etc. is to be checked and repaired andif required is renewed. And replace of 07 nos. tube light in engine room and repair of 01 no. fan. 06 nos. fans to be repair/replace if required |
| 15 | Labour charges |
| 16 | Cost of spare/material actual + 10% basis |
| 17 | Plumbing (tap,wash basin, toilet commode, drain pipes etc.) repaired/ replaced , if required as direction of EIC. |
| 18 | All wooden work: repair/replace of port side and stbd side door of control/wheel house , door of crew cabin, door of master cabine,door of gallery and door of store as per direction of EIC. |
| 19 | Labour charges |
| 20 | Cost of spare/material actual + 10% basis |
| 21 | Painting of water level to deck, main deck, upper deck, all toilet, kitchen, railing, engine room, etc are to be done byonecoats of primenr and two coats by anti corrosive marine paint( Shalimar marine paint) after the chipping and brushing as per direction EIC. |
| 22 | Servicing of Blower of engine room. |
| 23 | Labour charges |
| 24 | Cost of spare/material actual + 10% basis |
| 25 | Anchor winch leakage, arrest the all leakage and winch break strip is broken samem to be replaced including labour cherge & materials as per direction of EIC |
| 26 | Semi rotary hand pumps handle broken and jammed same to be replaced and same pumps to be serviced as per direction by IRS Surveyor/EIC |
| 27 | Labour charges |
| 28 | Cost of spare/material actual + 10% basis |
| 29 | Life bouys are damaged same to be replaced as per direction of IRS Surveyor/EIC |
| 30 | All bilge to be cleaned properly |
| 31 | Servicing of Honda emergency fire pump. as per direction of IRS Surveyor/EIC |
| 32 | Labour charges |
| 33 | Cost of spare/material actual + 10% basis |
| 34 | VHF set are not working same to be made operational as per direction of IRS Surveyor/EIC |
| 35 | All tank air vent are rusted same to be repaired/replaced(if required) as per direction of IRS Surveyor/EIC |