Construction Of Retaining Wall Through R.C.C In Kuberpur Situated Waste Energy Plant., agra-Uttar Pradesh

Agra Municipal Corporation has published Construction Of Retaining Wall Through R.C.C In Kuberpur Situated Waste Energy Plant.. Submission Date for this Tender is 04-01-2022. Wall construction Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

30493177
Construction Of Retaining Wall Through R.C.C In Kuberpur Situated Waste Energy Plant.
Open Tender
Indian
Uttar Pradesh
agra
04-01-2022

Tender Details

Construction Of Retaining Wall Through R.C.C In Kuberpur Situated Waste Energy Plant.

Key Value

Document Fees
INR 95000 /-
EMD
INR 5200000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:
Sl. No. Item Description
1Clearing jungles including up-rooting of trunk vegetation grass bushes, wood trees and sapling of girth up to 30 cm. measured at a height of 1 meter above ground level and removal of rabbis up to distance of 50 meters out side the periphery of area cleared. (Chapter No. 4, S.I. No. 259)
2Providing, Driving with Hydraulic pilling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all all complete. (Length of pile for payment shall be messured from top of shoe to the bottem of pile cap).
3Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10)
4Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3)
5R.C.C. work with cement approved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 for wall work excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials labor and tools and plants etc. required for proper completion of the work. Strength of the concrete shall not be less than M-150.{SI No. 284(a)}
6Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
7Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1)
812mm thick cement plaster in single coat of fair side of single of half brick wall forinterior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii))
9Providing and fixingPVC pipes conforming to IS make working pressure 6Kg/Sq Cm including testing labour T&P andall complete fittings.140 mm diameter
10Mild Steel or iron in Heavy Size such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
11Providing barbed iron wire fenceing in three rows including fixing it to post after stretching it including labor and tools & plants etc. required for proper completion of the work also excluding supply of wire and excluding supply of posts.
12Sub Total (A)
13Add for Cost of Soil testing, Design & Drawing, Structural consultancy @ 2% for Estimated Cost
14Sub Total (B)
15Add 12% G.S.T. of Sub Total (C)
16Sub Total (B)
17Add/Deduction Rs. 21.58 For Estimate Figure Amount Match
18Grand Total
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail