| 1 | Supplying Labour, Materials and T&P for Laying of pipe lines,constructionvalve chabers,stand post,recharge pit,bore well platform, Compound wall, 50KL RCC ESR with 12Mtr. Staging, pumping unit installation,Providing 100% functional house tape connections etc. With 5 years operation & maintenancein connection withto PWS toBaiganabadiunder KukudakhandiBlock. |
| 2 | Supplying all materials labour T&Pfor construction of Compound wall.Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etcalong with required fittings & specials and construction ofvalve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as perdetail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN andin ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7mwithout any likage in the entire PWS system as per direction of Engineer-in-charge. |
| 3 | Construction of 50,000 LTR OHR WITH 12MSTAGINGSupplying of alllabour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrscapacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of80 mm medium grade GI pipe Tata/Jindal/Sailmake confirming to IS specification of requiredlength from production well to ESR & ESR to rising main includingin-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampurat his own cost) |
| 4 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned. |
| 5 | Supplying Labour, Materials and T&P for Laying of pipe lines,constructionvalve chabers,stand post,recharge pit,bore well platform, Compound wall, 75 KL RCC ESR with 12Mtr. Staging, pumping unit installation,Providing 100% functional house tape connections etc. With 5 years operation & maintenancein connection withto PWS tovillage of Banthapalli under KukudakhandiBlock. |
| 6 | Supplying all materials labour T&Pforconstruction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etcalong with required fittings & specials and construction ofvalve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as perdetail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN andin ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7mwithout any likage in the entire PWS system as per direction of Engineer-in-charge. |
| 7 | Construction of 75,000 LTR OHR WITH 12 MSTAGINGSupplying of alllabour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 75,000 ltrscapacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of100 mm medium grade GI pipe Tata/Jindal/Sailmake confirming to IS specification of requiredlength from production well to ESR & ESR to rising main includingin-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampurat his own cost) |
| 8 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned . |
| 9 | Supplying Labour, Materials and T&P for Laying of pipe lines,constructionvalve chabers,stand post,recharge pit,bore well platform,pump house, Compound wall, 100 KL RCC ESR with 12Mtr. Staging, 20 KL RCC ESR with 10Mtr. Staging, pumping unit installation,Providing 100% functional house tape connections etc. With 5 years operation & maintenancein connection withtoPWS tovillage of Dengapadarunder KukudakhandiBlock. |
| 10 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etcalong with required fittings & specials and construction ofvalve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as perdetail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN andin ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7mwithout any likage in the entire PWS system as per direction of Engineer-in-charge. |
| 11 | Construction of 100,000 LTR OHR WITH 12 MSTAGINGSupplying of alllabour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 100,000 ltrscapacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of100 mm medium grade GI pipe Tata/Jindal/Sailmake confirming to IS specification of requiredlength from production well to ESR & ESR to rising main includingin-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampurat his own cost) |
| 12 | Construction of 20,000 LTR OHR WITH 10MSTAGINGSupplying of alllabour,T&P,material including taxes for soil testing ,supply of design, drawing , construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 20000 ltrscapacity with necessary staging height of 10 mtr consisting of minimum4 nos RCC columns and squaredome with full raft using CC M-25 with sand and pcc layer below foundation, as per approved drawing,supplying, fitting & fixing of65mm medium grade GI pipe Tata/Jindal/Sailmake confirming to IS specification of requiredlength from production well to ESR & ESR to rising main includingin-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga/CET,BBSR/VSSUT,Burla/NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) |
| 13 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned . |