Bids Are Invited For Laundry Equipment (M/S Stefab) - La 5150Overhaul 02 In No Drying Tumbler Motor 415V, 3Phase, 50Hz, 25.5Kw, (Make- Stefab). Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor, Renewal Of De/Nde Ball Bearing (6204 C3), Spray Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up For 10 Hour. Renewal Of All Consumable, Recording Of Insulation, Starting/Runningcurrentandprovingofmotorforsatisfactoryoperationon Completion Ofoverhauling.(Maintenance Schedule No. Lp-59 & 60).Gsl Remarks:Do In Conjunction With La-5152. , Laundry Equipment (M/S Stefab) 1 - La 5151Overhaul Drying Tumbler Control Panel. Overhauling Includes Cleaning/Renewal Of Magnetic Contactors (Ce 15G), 40 A,Qty- 01 No,(Ce Bch 15 F), 32 A, Qty- 03 No, Control Transformer, 415/230 V, 250 Va, Qty- 01 No, Drying Timer (Selec Xt 56, Qty-01 No, Cool Down Timer, (Selec Xt 56),Qty-01 No, Digital Temperature Control,(Select C 513),Qty-01 No, Calibration Of Over Load Relays ( Tdr),Range 18A–25A,Qty-02No,Singlephaseprotector(Vspd-1),Qty-01No, Thermostat(30? C–110? C).Renewelemaxconnectorsanddefective Components. Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor. Calibration Certificate With Limits To Be Handed Over To Ship Staff. (Maintenance Schedule No. Lp-59 & 60). Gsl Remarks:Dospares – Cg Supply. Material – Firm Supply.All In Way Jobs Included.Calibration Certificate To Be Provided By Firm , Laundry Equipment (M/S Stefab) 2 - La 5152Overhaul Washer Extractor Motor, 415V, 3Ph, 21.75 Kw. Overhauling Includes Record Of Insulation Prior Dismantling Of Motor And Withdrawal Of Rotor And Drum, Renewal Of De/Nde Ball Bearing (Skf- 6306-Zz & 6208-Zz), Spray Painting Of Heat Resistive Paint On External/Internal Part Of Yoke, Apply Of Varnish And Baking Up10hours,Adjustmentofelectromagneticclutchsgapnotmore0.5Mm. Renewalofv-Beltallconsumable.Recordingofinsulation,Starting/Running Current And Proving Of Motor For Satisfactory Operation On Completion Of Overhauling.Gsl Remarks:Do Through Oemspares – Cg Supply. Material – Firm Supply. All In Way Jobs Included. , Laundry Equipment (M/S Stefab) 3 - La 5153Washer Extractor Of Laundry Control Panel To Be Overhauled, The Control Panel Consist Ofcontrol Transformer (415/230 V, 100 Va, Qty- 01 No), Magnetic Contactor (32 A, Bch Ce 15 F, Qty- 01 No),Digital Temperature Control (Dtc 503,Qty-01 No), Control Relay (My 4N, Digital Temperature Control (Selec Tc513,Qty-06 Nos),Thermostat (30? C – 110? C),Vfd (Lg 15 S 8724, Three Phase), Reversing Timer (Mr 800), 0-30 Sec,Qty-01 No, Bdr, 240 V Ac/ 24 V Dc, Qty- 01 No,Elemax Connectors And Other Defective Spares. Starter To Be Proved For Satisfactory Operation On Completion Of Overhauling With Motor. Calibration Certificate With Limits To Be Handed Over To Ship. (Maintenanceschedule No. Lp-59 & 60).Gsl Remarks:Do Through Oemspares – Cg Supply. Material – Firm Supply. All In Way Jobs Included. , Laundry Equipment (M/S Stefab) 4 - Ha 1164Laundry Washing Machine And Dryer To Be Overhauled. Both Machinery Foundation To Be Inspected And Endorsed By Irs. Job Includes Servicing Of Driving Unit, Plummer Block, Thrust Bearings And Alignment. Washer Make- Stefab, Model – Nxe 30 ,Dryer, Make- Stefab, Model – Dre- 30.Spare/Mat- Firm Supplygsl Remarks:Do. Class Inspection - Yard Scope. Machines To Be Proved For Smooth Operation. Material– Firm Supplyspares Against Firm Indent – Cg Supplyall Inway Jobs Included. Total Quantity : 1