}

Bids Are Invited For Echo Sounder (M/S Norinco) - La 5007Inspect Both Transducer Fitment Along With Surface Ring And Clean Sea Weed From The Surface Of Transducer And Necessary Preventive Measure To Be Taken Till Ship In Dry Dock. (Maintenance Schedule Sl-Goa

Department of Defence Production has published Bids Are Invited For Echo Sounder (M/S Norinco) - La 5007Inspect Both Transducer Fitment Along With Surface Ring And Clean Sea Weed From The Surface Of Transducer And Necessary Preventive Measure To Be Taken Till Ship In Dry Dock. (Maintenance Schedule Sl. Submission Date for this Tender is 07-01-2022. Dry Cell Batteries Tenders in Goa. Bidders can get complete Tender details and download the document.




Tender Notice

30474657
Bids Are Invited For Echo Sounder (M/S Norinco) - La 5007Inspect Both Transducer Fitment Along With Surface Ring And Clean Sea Weed From The Surface Of Transducer And Necessary Preventive Measure To Be Taken Till Ship In Dry Dock. (Maintenance Schedule Sl
Indian
Goa
07-01-2022

Tender Details

Bids Are Invited For Echo Sounder (M/S Norinco) - La 5007Inspect Both Transducer Fitment Along With Surface Ring And Clean Sea Weed From The Surface Of Transducer And Necessary Preventive Measure To Be Taken Till Ship In Dry Dock. (Maintenance Schedule Sl. Lr-14)Gsl Remarks:Do Through Pac Firm. Spares – Cg Supply Material – Firm Supplyall In Way Jobs Included. Firm To Submit Calibration Certificate.Pac Firm - M/S Norinco Pvt. Ltd. , Echo Sounder (M/S Norinco) 1 - La 5008Overhaul Master Control And Display Unit For Optimum Performance And Renew Cmos Battery Prior Align Of Digital Repeaters, Interface With Other Equipment And Printer. Gsl Remarks:Do Through Pac Firm. Spares – Cg Supply Material – Firm Supplyall In Way Jobs Included. Firm To Submit Calibration Certificate.Pac Firm - M/S Norinco Pvt. Ltd. , Echo Sounder (M/S Norinco) 2 - La 5009Master Control & Display Unit To Be Tested/Calibrated By Using Of Echo Simulator(Dsts4a)Foroptimumperformanceandcalibrationdata Certificate To Be Handed Over To Ship Staff.(Maintenance Schedule No. Lr-14)Gsl Remarks:Do Through Pac Firm. Spares – Cg Supply Material – Firm Supplyall In Way Jobs Included. Firm To Submit Calibration Certificate.Pac Firm - M/S Norinco Pvt. Ltd. Total Quantity : 1

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Sl. No. Item TitleItem Description
1ECHO SOUNDER (M/s Norinco)LA 5007 Inspect both Transducer fitment along with surface ring and clean sea weed from the surface of transducer and necessary preventive measure to be taken till ship in dry dock. (Maintenance Schedule Sl. LR-14) GSL Remarks: DO through PAC firm. Spares – CG supply Material – firm supply All in way jobs included. firm to submit calibration certificate. PAC firm - M/s Norinco Pvt. Ltd.
2ECHO SOUNDER (M/s Norinco) 1LA 5008 Overhaul Master control and Display unit for optimum performance and renew CMOS battery prior align of digital repeaters, interface with other equipment and printer. GSL Remarks: DO through PAC firm. Spares – CG supply Material – firm supply All in way jobs included. firm to submit calibration certificate. PAC firm - M/s Norinco Pvt. Ltd.
3ECHO SOUNDER (M/s Norinco) 2LA 5009 Master Control & display unit to be tested/calibrated by using of Echo simulator(DSTS4A)foroptimumperformanceandcalibrationdata certificate to be handed over to ship staff.(Maintenance Schedule No. LR-14) GSL Remarks: DO through PAC firm. Spares – CG supply Material – firm supply All in way jobs included. firm to submit calibration certificate. PAC firm - M/s Norinco Pvt. Ltd.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail