Bids Are Invited For Furnace Control Panel - Design, Engineering, Fabrication, Supply, Erection, Testing And Commissioning Of Furnace Control Panel Complete With All Ecessary Switches, Auxillary And Power Contactors, Measuring Instruments, Etc. ,
Tender Overview
Project Description
Bids Are Invited For Furnace Control Panel - Design, Engineering, Fabrication, Supply, Erection, Testing And Commissioning Of Furnace Control Panel Complete With All Ecessary Switches, Auxillary And Power Contactors, Measuring Instruments, Etc. , Fresh Air Injection - Supply, Installation, Testing And Commissioning Of Fresh Air Injection System With Buffer Compressed Air Tank. , Thermocouple - Supply & Fixing The Thermocouple , Element - Heating Element , Structural Work - Design, Fabrication, Supply And Installation And Testing Commissioning Of Complete Structural Work For Furnace. , Door Manually Operated - Furnace Charge Door Manually Operated Withcounter Weight. ( Osspl Model ) L X W X H , Pollution Control Unit - Supply And Installation Testing Commissioning Of Door Guider And Slide Rails Set And Mild Stee Duct For Flue Exhaust Path From Furnace Bottom To The Pollution Control Unit , Trolley - Supply And Installation Testing Commissioning Of Position Cantilever Type Spring Loaded Body Charging Trolley With Handle. , Bricks Work - Supply, Instaliation, Testing And Commissioning Of Complete Set Of Refractory Shaped Bricks ( Osspl Model ) With Refactory Work Of Furnace In Both Primary And Secondary Combustion Chambers ( A ) Complete Lining & Assembling Of Entire Cremation Chamber According To Standard Size With Proper Arrangement Of Accommodation Of Heating Element, Resting Of Dead Body With Sufficient Opening For Falling Of Ashes To The Ash Chamber And Sufficient Ventilation For Fresh Air Spraying ( B ) Complete Lining And Assembling Of Entire Cremation Chamber According To Standard Size With Provision Of Drawing Out Ashes From The Rear Side And Sufficient Ventilation For Fresh Air Injection ( C ) Complete Lining And Assembling Of Entire Cremation Chamber According To The Standard Size With Provision Of Air Inlet Supplying By Fresh Air Blower And Arrangement Of Multi Ventilation Path For Fresh Air Injection To The Ash Chamber And Cremation Chamber. , Ceramic Board - There Should Be Ceramic Board Insulation On Outer Surface Furnace To Minimise The Heat Loss Through Radiation. ( 35Pcs ) , Venturi Work - Design, Engineering, Fabrication, Supply, Installation Testing And Commissioning Of Venturi With Packed Wet Scrubber And Accessories Complete Including Piping As Required , Impleller Work - Design, Engineering, Supply, Installation, Testing And Commissioning Of Induced Draft Fan Impleller Made Of Alloy To Withstand Temperature Rise In Continuous Duty In Surrounding Ambience. , Testing And Commissioning - Design, Engineering, Supply, Delivery At Site, Installation, Testing And Commissioning Of Ms Self Supported Chimney. Ms Ladder, Inspection Door. Operating Platfrom 1 Nos, Aviation Lamp, Lightning Conductor. , Water Pump Moter - Design, Engineering, Supply, Installation , Testing And Commissioning Of Re-Circulation Water Pump Motor Alongwith Necessary Pipeline And Accessories. Total Quantity : 1
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Jan-2022 | 10-Jan-2022 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Furnace control panel | Design, engineering, fabrication, supply, erection, testing and commissioning of furnace control panel complete with all ecessary switches, auxillary and power contactors,measuring instruments, etc. |
| 2 | Fresh Air injection | Supply, installation, testing and commissioning of Fresh Air injection system with buffer compressed air tank. |
| 3 | Thermocouple | Supply & fixing the Thermocouple |
| 4 | ELEMENT | HEATING ELEMENT |
| 5 | Structural work | Design, fabrication, supply and Installation and testing commissioning of complete structural work for furnace. |
| 6 | Door manually operated | Furnace Charge Door manually operated withcounter weight.(osspl model)L X W X H |
| 7 | Pollution control unit | Supply and installation testing commissioning of door guider and slide rails set and Mild Stee duct for flue exhaust path from furnace bottom to the pollution control unit |
| 8 | Trolley | Supply and installation testing commissioning of position cantilever type spring loaded body Charging trolley with handle. |
| 9 | Bricks Work | Supply, instaliation, testing and commissioning of complete set of refractory shaped bricks (osspl model) with Refactory work of furnace in both primary and secondary combustion chambers (a) Complete lining & assembling of entire cremation chamber according to standard size with proper arrangement of accommodation of heating element, resting of dead body with sufficient opening for falling of ashes to the ash chamber and sufficient ventilation for fresh air spraying (b) Complete lining and assembling of entire cremation chamber according to standard size with provision of drawing out ashes from the rear side and sufficient ventilation for fresh air injection (c) Complete lining and assembling of entire cremation chamber according to the standard size with provision of air inlet supplying by fresh air blower and arrangement of multi ventilation path for fresh air injection to the ash chamber and cremation chamber. |
| 10 | Ceramic board | There should be ceramic board insulation on outer surface furnace to minimise the heat loss through radiation. (35PCS) |
| 11 | Venturi Work | Design, engineering, fabrication, supply, installation testing and commissioning of Venturi with packed wet scrubber and accessories complete including piping as required |
| 12 | Impleller Work | Design, engineering, Supply, installation, testing and commissioning of induced draft fan impleller made of alloy to withstand temperature rise in continuous duty in surrounding ambience. |
| 13 | Testing and commissioning | Design, engineering, supply, delivery at site, installation, testing and commissioning of MS self supported chimney. MS ladder, inspection door. Operating platfrom 1 nos, aviation lamp, lightning conductor. |
| 14 | Water pump Moter | Design, engineering, supply, installation ,testing and commissioning of re-circulation water pump motor alongwith necessary pipeline and accessories. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed