| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :- |
| 2 | PCC Pole 8.5 Mtr Long/ST Pole 11 Mtr. Long. |
| 3 | Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set etc. |
| 4 | 25 KV to 100 KV T/F including complete related material required for transformer. |
| 5 | XLPE 11 KV Cable 3x70 to 185 mm |
| 6 | LT ABC Cable all size |
| 7 | CT PT Unit Complete |
| 8 | Meter Cubical |
| 9 | 11 KV Outgoing VCB |
| 10 | Cartage of following material from JE, Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :- |
| 11 | PCC Pole 8.5 Mtr Long/ST Pole 11 Mtr. Long. |
| 12 | Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set etc. |
| 13 | 25 KV to 100 KV T/F including complete related material required for transformer. |
| 14 | XLPE 11 KV Cable 3x70 to 185 mm. |
| 15 | LT ABC Cable all size |
| 16 | CT PT Unit Complete |
| 17 | Meter Cubical |
| 18 | 11 KV Outgoing VCB |
| 19 | Erection of PCC pole 8.5 Mtr long/STP Pole 11 mtr long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 20 | Fabrication and fixing of all 11 KV HT/LT line accessories. |
| 21 | Erection of Double pole on PCC pole 8.5 mtr after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work. |
| 22 | Fabrication and fixing of MS angle and MS channel, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators. |
| 23 | Mounting of 25 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT side of T/F. |
| 24 | Erection of stay rod complete after digging a pit of size 1.20 x0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 25 | Laying lifting stringing of proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly. |
| 26 | Laying lifting & sagging of LT line with ACSR weasel Conductor including proper binding & jumpring. |
| 27 | Dismantel of CT/PT unit |
| 28 | Dismantel of Meeter Cubical |
| 29 | Earthingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GL wire. |
| 30 | Guarding of line with G.I. wire having 2 no. horizontal wire & 3 Mtr distance odf laces of ten SWG G.I. wire after fabrication of guard cross arms of & fixing the same in supports. |
| 31 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. |
| 32 | providing and fixing stay clamps. |
| 33 | Providing and fixing Holding clamps. |
| 34 | Providing and fixing LT clamps. |
| 35 | Providing and fixing LT Insulator clamps. |
| 36 | Providing and fixing Bolt and Nuts. |
| 37 | Providing and fixing of G.I. Pipe |
| 38 | Providing and fixing of PRC Clamp |
| 39 | Providing and fixing of J-Hook |
| 40 | Providing and fixing of Dead end Clamp with Suspension Clamp |
| 41 | Laying of 11 KV XLPE cable in cable tranch after digging of tranch. Then filling the cable tranch with excavated earth soil bricks over the cable. |
| 42 | Fixing the cable jointing kit with the end of XLPE cable including mounting the same on pole with proper binding. |
| 43 | Fixing of Distributon box on suport after providing and fixing of fixing clamp including connection of LT ABC Cable |
| 44 | Fixing of meter cubical including grouting the bolt and Nut and connection of cable |
| 45 | Laying lifting and sagging including mounting of LT ABC cable of size 1x25 to 3x95 including fixing of all required its accessorise |
| 46 | Water level earthing with GI Pipe 32 mm Dia and MS Flat of size 45x5mm |