| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 30 Km. :- |
| 2 | PCC Pole 8.5 Mtr Long/STP Pole 11 Mtr. Long. |
| 3 | Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set, 11 KV XLPE Cable etc. |
| 4 | 25 KVA to 63 KVA T/F and 11 KV CT/PT Unit and Metering Cubical |
| 5 | Cartage of following material from JE, Store to site of work including loading & unloading at both ends maximum distance up to 30 Km. :- |
| 6 | PCC Pole 8.5 Mtr Long/STP Pole 11 Mtr. Long. |
| 7 | Line material such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire ACSR weasel conductor, GI Wire, MS angle iron & MS Channel, TPMO, Fuse set, 11 KV XLPE Cable etc. |
| 8 | 25 KVA to 63 KVA T/F and 11 KV CT/PT Unit and Metering Cubical |
| 9 | Erection of PCC pole 8.5 Mtr long/STP Pole 11 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including back filling of the pole with proper ramming after completion of work. |
| 10 | Fabrication and fixing of all 11 KV HT/LT line accessories. |
| 11 | Erection of Double pole on STP pole 11 mtr after digging a pit of size1.6 mtr deep in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work. |
| 12 | Fabrication and fixing of MS angle and MS channel, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators on D/P Pole. |
| 13 | Mounting of 25 to 63 KVA T/F with proper jumpering of HT side and fixing of cable on LT side of T/F and 11 KV CT/PT Unit |
| 14 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. |
| 15 | Erection of stay rod complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 16 | Laying lifting stringing & proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly. |
| 17 | Earthing of each 11 KV line pole & T/F properly after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GL wire. |
| 18 | Providing and fixing of Holding Clamp for STP pole |
| 19 | Providing and fixing of MS Nut & Bolts off size |
| 20 | Providing and fixing of Stay clamp for STP pole |
| 21 | Grouting of Metering Cubical |
| 22 | Filling of Cable Jointing Kit |
| 23 | Water Level earthing |
| 24 | Laying of 11 KV XLPE Cable 3x120 and 3x70 sq.mm |
| 25 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. |