| 1 | Shifting, dismantling & erection of 3 Ph, 440V Overhead line for coal stock lighting & power supply for submersible pump set for water spraying at coal stock yard at Barkuhi OCP, Pench Area, WCL |
| 2 | Labour charge for Dismantling the existing m.s. pipe pole above 6 m height with brackets ,clamps,insulators from the cement concrete foundation and making the site clear by reffilling the pits with excavatede materials and bringing it to the ground level. |
| 3 | Dismantling the existing overhead line including G.I. wire of all sizes without demaging & making the coils in suitable size. |
| 4 | Labour charge for erecting Rolled steel Joist (Girder) pole 100x116 mm (23kg/m) and 12 m. long with provided base plate in provided foundation as per specification No. OH-PL/RSJ |
| 5 | Supplying and erecting G.I. stay set for poles, including loop insulators at inaccessible height complete with anchor plate 300X300X6 mm. straining screws. G.I. stay wire 7/8 SWG. G.I. stay rod 20 mm X1.8 mm. length and pole clamps duly erected in provided cement concrete foundation. |
| 6 | Making cement concrete foundation in 1:3:6 cement concrete (20 to 25) mm. stone metal duly plastered with necessary curing for complete. (pole muffing or any other purpose) |
| 7 | Labour charge for erecting LED STREETlight fitting 100W including lamp with PF > 0.95, class IP 65 and above housing of pressure die cast aluminium alloy and heat sink extruded aluminium complete as per specification no. FG-ODF/FIS-2. |
| 8 | Making cement concrete foundation including excavation (60 X 60 x150 ) cm X deepin1:3:6 cement concrete 20 to 25 mm. Stone metal with necessary curing and finishing complete.(for stay) |
| 9 | Supply and erecting pole bracket, fabricated from ISMC channel 75x40x6.8mm Channel. 550 mm long for two insulators and welded with extension channel pieces of same size 300 mm. in length complete as per specification No. OH-PL/BKT. |
| 10 | Supplying and erecting porcelain shackle type LT mediuminsulator 75x115 mm dia with G.I. nute and bolt complete. |
| 11 | Supplying and erecting pin type LT mediuminsulator 100x62 mm dia with suitable G.I. spindle, nut and bolts complete erecded. |
| 12 | Supplying & erecting MS pole bracket, for LT OH conductor fabricated from 65x65x6 mm section 550mm long for nessessary nos. of provided insulator and erecting on pole with 50x6 mm. clampas per approved method of construction and complete as perspecification No. OH-PL/BKT |
| 13 | Supplying and erecting 100X50 mm with 4.7 mm thick web and 7.5 mm thick flange channel iron cross arm for 2.4 mtr. DP. Complete as per specification No. OH-PL/BKT |
| 14 | Labour charges for Erecting 3x70 sq mm 11kv,XLPE(E) armourd cable on wall/celling or laid in provided trench / pipe in an approved mannar as per specification No. CB*HT |
| 15 | Labour charges for Erecting of ACSR conductor of size 6/1-4.72 mm (Dog) complete (394.00 Kg/Km) as per specification No. OH-CON/ACSR (Departmental) |
| 16 | Labour charges for Transporting of poles from road to erecting place with initial lead of 500 mtr. |
| 17 | GST as applicable should be quoated in percentage, it will be calculated on total amount of Sl. No. 1.01 to1.15 |