| 1 | Extension of 3.3kV overhead line from Token office to main sump at Barkuhi OCP, Pench Area, WCL |
| 2 | Labour charge for erecting Rolled steel Joist (Girder) pole 100x116 mm (23kg/m) and 12 m. long with provided base plate in provided foundation as per specification No. OH-PL/RSJ |
| 3 | Making cement concrete foundation in 1:3:6 cement concrete (20 to 25) mm. stone metal duly plastered with necessary curing for complete. (pole muffing or any other purpose) |
| 4 | Supplying and erecting G.I. stay set for poles, including loop insulators at inaccessible height complete with anchor plate 300X300X6 mm. straining screws. G.I. stay wire 7/8 SWG. G.I. stay rod 20 mm X1.8 mm. length and pole clamps duly erected in provided cement concrete foundation. |
| 5 | Making cement concrete foundation including excavation (60 X 60 x150 ) cm X deepin1:3:6 cement concrete 20 to 25 mm. Stone metal with necessary curing and finishing complete.(for stay) |
| 6 | Supplying and erecting porcelain pin type insulator suitable for 11 KV line complete as per specification No. OH-INS/PN |
| 7 | Supplying and erecting porcelain disc type insulator suitable for 11 KV line complete as per specification No. OH-INS/DI |
| 8 | Supply and erecting pole bracket, fabricated from ISMC channel 75x40x6.8mm Channel. 550 mm long for two insulators and welded with extension channel pieces of same size 300 mm. in length complete as per specification No. OH-PL/BKT. |
| 9 | Supplying and erecting Vee cross arm with ISM channel of 75x40x6mm for 11KV HTOH line with arrangementto fix insulator at 45 mm from the end & horizontal distance between insulators 1220mm bent at angle of 60 degree keeping base 305mm and the total vertical height of V cross arm as 460 mm and fixed on pole with MS clamp of 80x10 mm, nut bolts, wahers complete as per specification no. OH-PL/VCA. |
| 10 | Supplying and erecting 75x40x6mm with 4.4 mm thick web and 7.3 mm thick flange channel (Top pin) with clamp of suitable lengthso as to maintainvertical clearanceof1065 mm for 11KV, 1320 mm for 22 KV between insulators for erection of top pin insulators complete as per specification no. OH-PL/VCA. |
| 11 | Erecting of ACSR conductor of size 6/1-4.72 mm (Dog) complete (394.00 Kg/Km) as per specification No. OH-CON/ACSR (Departmental) |
| 12 | Supplying and erecting pole clamp made from 50 x 10 mm MS flat for pole or pipe, post complete with 15 mm bolts and nuts, |
| 13 | Labour charges for Erecting 3x70 sq mm 11kv,XLPE(E) armourd cable on wall/celling or laid in provided trench / pipe in an approved mannar as per specification No. CB*HT |
| 14 | Supplying and erecting 100X50 mm with 4.7 mm thick web and 7.5 mm thick flange channel iron cross arm for 2.4 mtr. DP. Complete as per specification No. OH-PL/BKT |
| 15 | Labour charges for Transporting of poles from road to erecting place with initial lead of 500 mtr. |
| 16 | GST as applicable should be quoated in percentage, it will be calculated on total amount of Sl. No. 1.01 to1.14 |