Survey, Design And Construction Ofkwilakhal-Saundagroup Of Village Pumping W / S Scheme Consisting Of Infiltration Well Or Dry Intake Well, Wtp ( With Rgsf ) , Supply Mains, Rising Mains, Distributionsystem, Clear Water Sumps / Reservoirs, Pump Ho, Kwilakhal Saunda Distt Rudraprayag-Uttarakhand

Drinking Water And Sanitation Department has published Survey, Design And Construction Ofkwilakhal-Saundagroup Of Village Pumping W / S Scheme Consisting Of Infiltration Well Or Dry Intake Well, Wtp ( With Rgsf ) , Supply Mains, Rising Mains, Distributionsystem, Clear Water Sumps / Reservoirs, Pump Ho. Submission Date for this Tender is 05-01-2022. Reservoir Tenders in Kwilakhal Saunda Distt Rudraprayag Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

30432695
Corrigendum : Survey, Design And Construction Ofkwilakhal-Saundagroup Of Village Pumping W / S Scheme Consisting Of Infiltration Well Or Dry Intake Well, Wtp ( With Rgsf ) , Supply Mains, Rising Mains, Distributionsystem, Clear Water Sumps / Reservoirs, Pump Ho
Open Tender
Indian
Uttarakhand
Kwilakhal Saunda Distt Rudraprayag
05-01-2022

Tender Details

Survey, Design And Construction Ofkwilakhal-Saundagroup Of Village Pumping W / S Scheme Consisting Of Infiltration Well Or Dry Intake Well, Wtp ( With Rgsf ) , Supply Mains, Rising Mains, Distributionsystem, Clear Water Sumps / Reservoirs, Pump Houses, Staff Quarters, Supply & Installation Of Pumping Plants ( Pumps, Motors, Control Panel Andtransformers Etc ) And Other Appurtenant Works Including Supply & Cartage Of All Materials, Labor And T&P Etc. Complete For Proper Completion Of Works. It Is Also Including Testing, Commissioning With 6 Months Trail & Run And Handing Over To Ujs For Its Maintenance

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 29-Dec-2021 Regarding Prebid Other 05-01-2022
2 29-Dec-2021 Corrigendum Other 05-01-2022
3 01-Jan-2022 Corrigendum regarding Clause Other 05-01-2022

Key Value

Document Fees
INR 5900 /-
EMD
INR 4000000.0 /-
Tender Value
INR 20 Crore /-

BOQ Items

Name of Work: Survey, Design and Construction ofKwilakhal-Saundagroup of village pumping w/s scheme consisting of Infiltration well or dry intake well, WTP(with RGSF), supply mains, rising mains, distributionsystem, clear water sumps /reservoirs, pump houses, staff quarters, supply & installation of pumping plants(Pumps, motors, control panel andtransformers etc) and other appurtenant works including supply & cartage of all materials, labor and T&P etc. complete for proper completion of works. It is also including testing, commissioning with 6 months trail & run and handing over to UJS for its maintenance
Sl. No. Item Description
1PART- A ( CIVIL WORKS ):- Survey investigation for possibilites of making Infiltration well from authorised agency and Design,testing bearing capacity of soiI and construction of R.C.C. Infiltartion well cum Pump House having 6.00 m internal Diameter and 19.00 m height (15.00 m height of steening of Intake well and 4.00m height of pump house) with R.C.C. approach bridge of 15.00 m length and 2.50 m width, also fitted with steel Trussed Ladder of 1.00 m width and15.0 m height inside the well. The well should have 1.20 m wide balcony and projected roof all around at outer face with 1.20 m high G.I. pipe railing in 04 rows at @ 0.40 m c/c. The well should have proper arrangement of beam/girder to rest on floor and wall of pump house for lifting of pumps from well complete including diversion of river. The well should have all provision for Pumps Installation of required capacity in the bank of Mandakini River near by Tilwara nagar panchayat including supply and cartage of all materials, labour, T&P etc. complete excluding protection works but Including internal & external electrification, water level indicator, earthing work, complete painting work with Apex on both inner and outer sides of well etc. complete.(For any increase/decrease in these heights/lengths, rates are shouted below.)
2Rate for variation in height of Infiltration well
3for increase in height
4For decrease in heigh
5Rate for variation in length of approach bridge of Infiltration well
6for increase in length
7For decrease in length
8Survey investigation for possibilites of making Infiltration well from authorised agency and if construction of Infiltration well is not possible than design, drawing, testing of bearing capacity, hydrological, geological survey and construction of water tight circular R.C.C. Dry Intake well cum pump house at the bank of river Mandakini near Tilwara nagar Panchayat with R.C.C. approach bridge of approximate 15 m length and 2.5 m width to withstand safely the river current (last 30 year)/ discharge, seismic/wind or all other natural effects and suitable for taking approximate 2.50 MLD raw water discharge(in 16 hours), including supply of all material, labour, T&P etc. required for proper completion of work. Inner diameter of well shall be 6.0 metre. Height of well is approximately 15.0 metre (from lean water level to 2.0 M above H.F.L. of Mandakini river Near Tilwara nagar Panchayat) and depth of foundation below G. L. is assumed 8.0 M, which is liable to change according to geo-investigation, structural design and site conditions and HFL of river in last 30 year. Height of pump house will be 4.00 m (including space required for Motors, HT Pannels etc.). Atleast six inlets (on different levels/heights) with a common header should be installed at/above intake floor with stainer to tap river water, pipe arrangement for drazzing pump, M. S. girder 350 mm , sluice valves as required, 1.20 metre wide balcony all arround the well shaft above HFL, doors and windows, pump foundations, internal and external electrification work, painting, distempering and snowsem all inside and outside of well, four layer M. S. railing should be on aproach bridge/balcony with hand realing and there should be 1.0 metre wide spiral stair with hand rail from pump house floor to bottom of intake. The rates should be inclusive of river diversion, all excavation required for well and bridge and dewatering etc. The overall height of intake well is taken approximately 19.00 metre from top of raft foundation to pump house roof top, which will change according to conditions mentioned above. (For any increase/decrease in these heights/lengths, rates are shouted below.) The well shoud have all provisions for pumps installation of requaired capacityincluding all labour materialT&P or as directed by Engineer in Charge.
9Rate for variation in height of Intak well
10for increase in height
11For decrease in heigh
12Rate for variation in length of approach bridge of Intak well
13for increase in length
14For decrease in length
15If construction of Infiltration well is not possible than Survey, hydraullic/structural design, drawing, testing of soil bearing capacity,sitedevelopment,boundry wall (with fencing at top) around MPS and construction of water tight R.C.C.2.50 MLDCapcity (Raw water in 16 hours) rapid gravity filter treatment plant the design of filter plant has to be done on the CPHEEO manual for water supply and treatment. The filter plant consists of raw water inlet chamber with flow measuring device, pre PST, pre sedimentation tank (tube settler) (capable to remove all suspended monsoon impurities of river muddy water for removing maximum turbidity up to 1000 NTU), mixing unit, floculation unit, scondary settling tank, chemical house, laboratory wtih office room, hopper bottom settling tanks ( tube settler), rapid sand filter of four equal units with alum doser, bleaching or chlorine mixing doser & back wash arrangements,operation platform, clear water chamber, approved filter media, 0.60 M wide appron and 15 cm PC drain all around all units, gate/sluice valves and their chambers, discharge measurement at inlet and outlet unit,and all other appurtinent works. Including supply and fixing pipefor proper drainage arrangement upto out side the WTP campus, MSERWpipes for connecting the units, electrification and lighting arrangement inside and outside of operating plateform and filter, tiles flooring, double doors and windows in operating room, painting, distempering and snowsem all inside and outside of WTP, three layer M. S. railing should be on stairs, filter all as required or as directed by Engineer in Charge. The work also include inter connecting RCC inspection path way with hand railing to all unit as per site requirment, MS Jaal to protect water from wild animals and debrish, testing of all supplied maiterials. Including supply of all material, labour, T&P etc. required for proper completion and functioning of WTP. The rates shall be including of running and maintenance for one year including training of Peyjal Nigam staff during running and maintenance period of treatment works including all performance test of clarifier, settler, filters and quality of filtered water as per water supply manual.
16Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means in hill side cutting or in foundation, including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (For all building works works including Site Development, except pipe line trenches)
17Confirmatorysurvey , design, Supply, Carting laying and jointing with welding process with proper grade of electrodes suitable for jointing of water supply pipe line (ador, L&T for equivalent quality of electrodes) by cutting of pipes and making required bends by welding, making necssary conection for pumps and sump cum CWR at MPS & all IPS, fixing of air valve, sluice valve, reflux valve at suitable points including making scouring arrangement by fixing tee and gate valve etc with all appurtenat works with testing of supplied maiterials and completion of work with testing of pipe line etc completed following sizes API 5L Grade- X-56 and X-65pipe at site of work. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of rising main/supply main & distribution main for checking of thickness of pipebefore ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
18150mm dia and 3.2 mm thick (API 5L X-56)
19150mm dia and 4.8 mm thick (API 5L X-56)
20150mm dia and 6.4 mm thick(API 5L X-56)
21150 mm dia and 7.9 mm thick (API 5L X-65)
22125 mm dia and 4.8 mm thick(API 5L X-56)
2340 mm dia 4.00mm thick (API 5 L X-65)
2450 mm dia 4.8 mm thick (API 5 LX-65)
25Supply and fixing of the following fitting including cartage of materials labour T&P etc. complete.
26125 mm dia CS Sluice Valve (P.N. 1.6).
27150 mm dia CS Sluice Valve (P.N. 1.6).
28100 mm dia CS Sluice Valve NRV (P.N. 1.0)
29125 mm dia CS Sluice Valve NRV (P.N. 1.0)
30CI air valve Double acting.80mm dia
31CI air valve (Screwed) 25 mm dia
32Constructing masonry Chamber 120x120x100 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) for Reflux/sluice/air valve, with C.I. surface box 100 mm. as per standard design. with locking arrangement.
33Painting of following sizes API Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer)supply and cartage of all material, Labour and T&P etc,complete
34125 mm dia
35150 mm dia
36Supply of all materials, labours, T&P etc and construct of 2.0 M wide briddle path along the alignment of rising main for cartage of rising main and later on for effective maintenance including R. R. Dry masonry in Retaining or brest wall (as and where required, as per site requirement) .
37Construction of Anchor Blockas per requirement of site) in R.C.C. with necessary reinforcement along the alignment of Raw water and Clear Water Rising Main including supply of all materials, labour, T&P etc. complete including cartage of materials
38Subsoil Investigation, drawing, design and construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation,0.60 M wide appron with 15 cm PC drain,required sluice valve chamber, fixing water level indicator, lighening arrester, fixing 03 rowse railing at top dome (20 Kl & above), MS ladder (inside and outside of CWR), MS manhole with locking arrangement, ventilator with mosquito net,two coat snowcem/distemper/painting, including wall writing as per instructions given by E"ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc,complete. (Cap. in KL)
39480.00 KL
40450.00 KL
41300.00 KL
427.50 KL
4310.00 KL
4412.50 KL
4515.00 KL
4617.50 KL
4720.00 KL
4825.00 KL
4935.00 KL
5050.00 KL
5180.00 KL
52ACTARIS Bulk Water Meters model Woltex Class B magnetically coupled pre equipped for remote reading including supply, fixing, carting of material, labour T & P etc. Complete.
53125 mm dia
54150 mm dia
55Constructing masonry Chamber 120x120x100 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) for Bulk water meter with C.I. surface box 100 mm. as per standard design. with locking arrangement.
56Supply & fixing of MS Bucket type chlorinator of 25 liter Capacity including cartage of material, labour T & P etc complete
57Confirmatorysurvey, design, supply carting , laying true to aligment and gradient, jointing and fixing of following pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connecting existing house hold Connections with control plate devices etc completeand properfunctioning ,confirming to IS:1239 at site of works. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of rising main/supply main & distribution main for checking of thickness of pipebefore ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
58G I PIPE(Medium)
5920mm dia
6025mm dia
6132mm dia
6240mm dia
6350mm dia
6465mm dia
6580mm dia
66100 mm dia
67125 mm dia
68Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work.
6920mm dia
7025mm dia
7132mm dia
7240mm dia
7350mm dia
74Earth work in excavation by mechanical means (Hydraulic Excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. For pipe line in following strata including supply of labour, T&P. etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and rest 25% will be in medium rock.
75Soil mixed with boulder and bajri
76Medium rock
77Supply and fixing of the following fittings including cartage of materials, labours, T&P etc complete gate/Wheel valves (Class-I) as per I S 788/1997
7820mm dia
7925mm dia
8032mm dia
8140mm dia
8250mm dia
8365mm dia
8480mm dia
85Constructing masonry Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse sand) for sluice/air valve, with C.I. surface box 100mm. as per standard design. with locking arrangement.
86Constructing masonry Chamber 60x60x60 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse sand) for sluice/air valve, with C.I. surface box 100mm. as per standard design. with locking arrangement.
87Supply of all materials, labour, T&P etc and construct of BPT as per type a design & drawing including fixing of pipe of fitting including cartage of materials etc. complete
88Supply of all materials, labour, T&P etc and construct earthquake/vibration resistant,Pump house at having size 7.00 x 5.00 x 4.50 M. Including drawing, design, testing of soil bearing capacity, pump foundation et complete. Also including excavation for foundation, supply & fixing 01 rolling shutters, glazed windows, ventilator, 0.60 M wide sunshades, arrangement to support girders,girders, CC flooring, cable trench, electrification works, 0.60 M wide appron with drain, 0.60 M wide slab projection and two coat .snowcem/distemper/painting and proper drainage system.or as directed by Engineer in Charge. At MPS, IPS-I,
89Design, testing bearing capacity of soil for construction of Staff Quarter of following type made up of Brick masonry with R.C.C. flat roof at each pumping station i.e. MPS, IPS andother appurtenant works as per approved design & drawing including proper arrangements of electrification work at inner and outer side, complete sanitory works as per requirements & supply of all materials,labour, T&P etc. complete.
90Type I (Plinth Area – 43.00 Sqm)
91Provision of 1.5 m high Boundary Wall in brick masonry including supply of all materials, labour, T&P etc. complete at MPS, IPS-I, & Top CWR
92Provision of Barbed Wire Fencing through angle iron posts around the water works siteincluding supply of all materials, labour, T&P etc. completeat MPS, IPS-I,& Top CWR
93Provision of 3.6 m wide Iron Gate with construction Pillars at MPS, IPS-I & Top CWR
94Provision of Drainage System consisting of following works -
95Main hole Chamber
96Supply & laying of drainage 250 mm dia. RCC NP2 pipe
97Supply of all materials and construct 150 mm S.C. drain including supply of all labour T&P etc complete
98MS iron work in reinforcement
99Providing and laying in position of reinforced cement concrete (R.C.C.) 1:1.5:3 in cement, sand & 20mm gauge stone ballast including cost of design etc if required but excluding cost of reinforcement .
100R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
101R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
102Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
103Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
104PART B: ELECTRICAL & MECHANICAL WORKS
105SITC of pump[ing plant
106Split case centrifugal Raw water pump
107LT motor for Raw water pump
108Automatic starter for Raw water
109Control panel for Raw water
110Multistage clear water pumps for MPS
111HT motors for MPS
112HT control panel with all accessories
113LT control panel for MPS
114Multistage clear water pumps for IPS
115LT motors for IPS
116Automatic starter for IPS
117LT control panel for IPS
118Main piping valves & specials for Raw water
119Main piping valves & specials for MPS
120Main piping valves and specials for IPS
12135 sq mmx 3.5 core Al. LT cable
12216 sqmm x 3 core Cu. Submersible cable
123240 sq mm x 3.5 core Al. LT cable
12470 sq mm x 3 core Cu. Submersible cable
125Jointing material
126GI earthing for pumping plant
127Gauges for Raw water
128Gauges forMPS
129Gauges forIPS
130Tools for Raw water
131Tools for MPS
132Tools for IPS
133Rubber resistance sheet
134Chainpulley block with travelling trollyfor Raw water
135H.O.T crane for MPS and IPS
136Testing of pumping plant at works
137Testing of pumping plant at site
138Painting of pumping plant
139Transformers 63 KVA for MPS
140Transformers 315 KVA for IPS
141Testing of transformers at works
14250 sq mm x 3 core Al. HT cable
14335 sq mm x 3 core Al. HT cable
144HT cable jointing kits
145Earthing of transformers
146Fecncing of transformers at MPS
147Fecncing of transformers at IPS
148Outdoor HT panel
149AUTOMATION WORKS
150SITC of MCS/LCS with all accessories as per site requirement
151GSM based remote terminal unit
152GSM based wireless communication hardware for RTU"s
153Electromagnetic insertion type flow meter 150 mm
154Energy meter
155Valve actuators 150 mm
156Actuator panel
157Hard wire timer circuit
158Pressure transmitter
159Isolation transformer
160Over voltage & under voltage trip protection
161Level transmitter
1622 core x 1.5 sq mm PVC coated Cu. Cable
1634 core x 2.5 sq mm PVC coated Cu. Cable
1644 core x 1.5 sq mm PVC coated Cu. Cable
16510 core x 1.5 sq mm PVC coated Cu. Cable
166Conduit pipe PVC 1"
167Conduit pipe PVC 1.5"
168Accessories
169Customization & Integration of software
170ELECTRIFICATION OF PUMP HOUSES
171Wiring point for light, fan etc
172Submain 2x2.5 sq mm + 1 x 2.5 sq mm
173Submain 2x4.0 sq mm + 1 x 4.0 sq mm
174Supply & Fixing of metal box
175Supply & Fixing of SPN DB
176Supply & Fixing of MCB
177Supply & Fixing of D.P isolator
178Supply & Fixing of LED tubelight
179Supply & Fixing of LED external lightening
180Operation & Maintenance
181O&M of pumping stations in auto mode for 6 months
182O&M of pumping stations in auto mode for 6 months
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail