Water Resources and Irrigation Local Bodies Closing in 0 days TDR #30415985

Annual Maintenance Contract Rwss To Nedumkunnam Kangazha And Vellavoor Panchayath Leak Rectification Works In Various Pipelines For One Year Annual Maintenance Contract Rwss To Nedumkunnam Kangazha And Vellavoor Panchayath Leak Rectification Works In Vari

Issued by Local Bodies · NEDUMKUNNAM, Kerala
Tender Value
10.56 Lakhs
Estimated cost
Bid Submission
28 Dec 2021
0 days left
EMD
15900
Bank guarantee accepted
Document Fee
2200
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
NEDUMKUNNAM → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Maintenance Contract Rwss To Nedumkunnam Kangazha And Vellavoor Panchayath Leak Rectification Works In Various Pipelines For One Year Annual Maintenance Contract Rwss To Nedumkunnam Kangazha And Vellavoor Panchayath Leak Rectification Works In Various Pipelines For One Year

BOQ

Work Name:Annual maintenance of 2022-leak rectification of various pipe lines inNedumkunnam, Kangazha and Vellavoor panchayath
Sl. No. Item Description
1App. A Working charge
2Leak rectification work in 50 mmPVC (Class 2 to 6) pipe line including detectingand locating leak,earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
3Leak rectification work in 63 mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
4Leak rectification work in 75 mmPVC (Class 2 to 6) pipe line including detectingand locating leak,earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
5Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
6Leak rectification work in 90mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
7Leak rectification work in 90mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
8Leak rectification work in 110mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
9Leak rectification work in 110mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
10Leak rectification work in 160mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
11Leak rectification work in 160mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
12Leak rectification work in 200mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
13Repairing leakage/breakage of 80 mm ACpipe line by cutting and dismantling the damaged pipe portion (up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valvesif any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints.
14Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints.
15Repairing leakage/breakage of 150 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints.
16Repairing leakage/breakage of 200 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints.
17Rectification of leakages of 32 mm, 40mm & 50mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete.
18Rectification of leakages of 50 mm GI Pipes in exposed portions by replacing lengths up to 1.0mby cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythree run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete.
19Rectification of leakages of 65 mm GI Pipes in exposed portions by replacing lengths up to 1.0mby cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythree run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete.
20Rectification of leakages of 80 mm GI Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc. complete.
21Rectification of leakages of 100 mm GI Pipes in exposed portions by replacing lengths up to 1.0mby cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythree run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete.
22Rectification of leakages of 150 mm GI Pipes in exposed portions by replacing lengths up to 1.0mby cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythree run welding to make a water tight joint, painting the welded portion, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete.
23Supplying andfixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for toolsand as per the direction of the department officers etc complete.
24Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
25Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
26Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting,cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost ofpipe and specials and as per the direction of departmental officers etc. complete.
27App.B - tankwashing
28Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns,disposing the the slurry / waste materilas away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the exististing strucutre and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.
29appendix-cost of materials
30Supply of uPVC Pipe, IS 4985:2000 , 8kg/cm2, 90mm Dia.
31Supply of uPVC Pipe, IS 4985:2000 , 8kg/cm2, 110mm Dia.
32Supply of uPVC Pipe, IS 4985:2000 , 8kg/cm2, 160mm Dia.
33Supply ofuPVC Pipe, IS 4985:2000 , 8kg/cm2, 200mm Dia.
34supply of 65MM GI PIPE
35Supplying 100mm GI Pipe
36COST OF 80MM GI
37supply of 50mm GI pipe

AI Tender Summary

OUR REF NO 30415985
AUTHORITY Local Bodies
TENDER VALUE 10.56 Lakhs
LAST DATE 28-12-2021
Authority
Authority Name Kerala Water Authority
Work Description Annual Maintenance Contract Rwss To Nedumkunnam Kangazha And Vellavoor Panchayath Leak Rectification Works In Various Pipelines For One Year Annual Maintenance Contract Rwss To Nedumkunnam Kangazha And Vellavoor Panchayath Leak Rectification Works In Various Pipelines For One Year
Basic Detail
Tender No 1/AEE/PHSD/2021-22
Bidding Type Tender
Location
City NEDUMKUNNAM
State Kerala
Key Dates
Publish Date 23 Dec 2021
Submission Date 28 Dec 2021
Open Date 30 Dec 2021
Finance
Tender Value 10.56 Lakhs
Tender Fee 2200
EMD 15900
Exemption Not Available
Document List
f5cf04c0-48aa-451b-af4f-e1e7ad8d4364.html
BOQ_662050.xls
KWAGeneralConditionsforeT.pdf
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 23, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 28, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 30, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

f5cf04c0-48aa-451b-af4f-e1e7ad8d4364.html

xls

BOQ_662050.xls

pdf

KWAGeneralConditionsforeT.pdf

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders