| 1 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed, glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by the Engineer In Charge including cost of all labours, tools, materials, transportation charges and all other charges etc. complete. |
| 2 | Dismantling tile work in floors laid in cement mortar including stacking material within 50 metres lead including cost of all labours charges, tools, materials, transportation etc. complete as directed by the Engineer In Charge. |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, complete as directed by the Engineer In Charge excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)including cost of all labours, tools, materials, transportation charges, materials and all other charges etc. complete. |
| 4 | Providing centering and Shuttering for RCC work, suspended floors, roofs, landing, balconies and access platform including supply of all labours, tools, materials, etc. complete as directed by the Engineer In Charge. |
| 5 | Providing Steel reinforcement (Thermo-Mechanically Treated bars) of Fe 500 grade for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level as directed by the Engineer In Charge including supply of all labours, tools, materials, etc. complete reinforcement.t |
| 6 | 12 mm thick Cement Plaster finised with a floating coat of neat cement of mix : 1:4 ( 1 cement: 4 fine sand )in single coat on rough side for interior plastering up to floor two level, including arises, internal rounded angles chamfers and/ or rounded angles as directed by the Engineer In Chargeincluding cost of all labours, tools, materials and all other charges etc. complete. |