| 1 | Excavation for foundation in earth soil of all types,sand,gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed, dewatering preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and struttingBd.A.1 Page No.259 SSR OF 2020-21 ITEM NO.21.02 & PAGE NO.131 BASIC RATE |
| 2 | Providing and laying in situ cement concrete of M10 proportion with trap/ granite / quartzite / gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with natural sand) CD-3 Page No.160SSR OF 2021-22 ITEM NO.11.02 & PAGE NO.62RATE ANALYSIS |
| 3 | Providing and laying Cast in situ/Ready Mixcement concrete M-20 of trap I granite /quartzite/ gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, plywood/ steel formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic,tarpaulin etc. (Wooden centering will not be allowed.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Bd. E.4 Page No.289 and B-7, Page No.38SSR OF 2021-22 ITEM NO.24.1 & PAGE NO.131 RATE ANALYSIS |
| 4 | Providing and fixing in position TMT - FE - 500bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs,beams columns, canopies, staircase, newels,chajjas, lintels pardis, copings, fins, archesetc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.Bd. F.17, Page No.306 SSR OF 2021-22 ITEM NO.26.33 & PAGE NO.139 RATE ANALYSIS |
| 5 | Providing and laying Rough Shahabad Stone Flooring 25 mm to 30 mm thick and of required width in plain / diamond pattern on a bed of 1:6 C.M. including cement float, striking joints, pointing in cement mortar 1:3 curing and cleaning etc. complete.Bd. M.1 Page No.379SSR OF 2021-22 ITEM NO.33.01 & PAGE NO.156RATE ANALYSIS |
| 6 | ROYALTY CHARGES :- Supply of Rubble,Murum, Soil, 60mm./40mm. metal (Handbroken). rovaltv charnes nrf\" not Included in thf\"E DSR ITEM NO .... & PAGE NO ....ROYALTY CHARGES FOR SAND |
| 7 | Laboratory testing charges are not considered inthe Rate Abstracts. Where ever required separateitem shall be taken in the estimate for materialCONCRETECompressive strength of CC.Cube (Set of 3 cubes) |
| 8 | ADD 12% FOR GOODS AND SERVICES TAX |
| 9 | ADD 1% FOR LABOUR INSURANCE |