| 1 | Cost of materials & Working Charges |
| 2 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) |
| 3 | Removing white or colour wash by scrapping and sand papering and preparingthe surface smooth including necessary repairs to scratches etc. complete |
| 4 | Engaging Coolie |
| 5 | Wall painting with plastic emulsion paint of approved brand and manufactureto give an even shade:One or more coats on old work |
| 6 | Finishing walls with water proofing cement paint of required shade :Old work (one or more coats @ 2.20 kg/10 sqm) complete. |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture ofrequired colour to give an even shade :One or more coats on old work |
| 8 | Painting (one or more coats) with black Japan paint of approved brand andmanufacture to give an even shade. |
| 9 | Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacityat all heights with coconut brushes, duster etc., removal of silt, rubbish from the tankand cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gmper litre capacity of tank including marking the date of cleaning on the side of tank bodywith the help of stencil and paint and disposing of malba all complete as per directionof Engineer-in-Charge. (The old date already written on tank should be removed withpaint remover or black paint and if date is not written with the stencil or old date is notremoved deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittingsor ball cock is damaged that is to be repaired by contractor at his own cost and nothingextra will be paid on this account) |
| 10 | Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete. |
| 11 | 12 mm cement plaster of mix: |
| 12 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 13 | Providing and laying factory made chamfered edge Cement Concrete paver blocksin footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,thickness & size/ shape, made by table vibratory method using PU mould, laid inrequired colour & pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sand bedding layerthrough vibratory compaction by using plate vibrator, filling the joints with sand andcutting of paver blocks as per required size and pattern, finishing and sweepingextra sand. complete all as per direction of Engineer-in-Charge.60mm thick cement concrete paver block of M-35 grade with approved colour, design& pattern. |
| 14 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete. |
| 15 | Providing MS Gate |
| 16 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. |
| 17 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil |
| 18 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 19 | Fixing MS Gate both sides of MS Pillar using Hinges and proving Locking arrangements including the cost of necessary materials and working charges etc complete |
| 20 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |