}

Detailed Engineering Survey And Associated Works For:Group-A: Laying 49 Km Natural Gas Spurline From Asanur Towards Salem In Tamilnadu Under Etbpnmtpl Project, Tamilnadu-Tamil Nadu

Indian Oil Corporation Limited-IOCL has published Detailed Engineering Survey And Associated Works For:Group-A: Laying 49 Km Natural Gas Spurline From Asanur Towards Salem In Tamilnadu Under Etbpnmtpl Project. Submission Date for this Tender is 10-01-2022. Survey Works Tenders in Tamilnadu Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

30376856
Detailed Engineering Survey And Associated Works For:Group-A: Laying 49 Km Natural Gas Spurline From Asanur Towards Salem In Tamilnadu Under Etbpnmtpl Project
Limitted
Indian
Tamil Nadu
Tamilnadu
10-01-2022

Tender Details

Detailed Engineering Survey And Associated Works For:Group-A: Laying 49 Km Natural Gas Spurline From Asanur Towards Salem In Tamilnadu Under Etbpnmtpl Project

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: DETAILED ENGINEERING SURVEY AND ASSOCIATED WORKS FOR: Group-A: LAYING 49 KM NATURAL GAS SPURLINE FROM ASANUR TOWARDS SALEM IN TAMILNADU UNDER ETBPNMTPL PROJECT
Sl. No. Item Description
1ML Survey for Asunur Salem NG PL
2Carrying out Population Density Index survey along the pipeline route as per specifications and directions of Site Engineer/Engineer -in-Charge.
3Carrying out detailed engineering survey of the pipeline route for laying cross country pipeline as per the detailed scope of work e numerated in Special Conditions of Contract and specifications of the tender document and direction of Site Engineer/Engineer-in-Cha rge including all labour, material, etc., complete in all respect.
4b) Along existing pipeline route
5Carrying out soil resistivity surveys as per detailed scope enumerated in Special Conditions of Contract and tender specifications c omplete in all respect as follows
6Conducting soil resistivity survey at intervals of 125 metres along the pipeline route, as per the detailed scope of work specified in special conditions of contract and specifications of the tender document and direction of Site Engineer/ Engineer in charge.
7Conducting soil resistivity survey at station locations as per specifications & instructions of Site Engineer/ Engineer in charge co mplete in all respect.(1 set of reading per grid size of 75 feet x 75 feet)
8Conducting soil chemical analysis survey for determination of PH value, chemical analysis for Cations i.e. Calcium, Magnesium, Sodiu m, Potassium and Anions i.e Chloride, Sulphate, Sulphide, Carbonate, Bicarbonate, Nitrate, Phosphate,etc. as per specifications and direction of Site Engineer/ Engineer-in-Charge & providing data in tabular form complete in all respect as per the following:-
9Along the pipeline route at an interval of 1km as per specification.
10At station locations, as per specification (1set of reading per grid of size 75feet x 75feet).
11"Soil Stratification Survey Conducting Soil Stratification Survey for determining stratification of soil/rockas detailed in tender specifications and as per d irection of Site Engineer/ Engineer-in-Charge including providing the data in tabular form complete in all respect as per the follow ing: "
12Along the pipeline route excluding river crossing by boring 100 mm dia. using auger type equipmentsup to a depth of 2.5 m from gro und level or till rock is encountered, whichever is less at an interval of 250 m and providing the result in tabular form as per spe cification.
13Across the dry river by boring 100mm dia using auger type equipments up to a depth of 5 m from the river bed or till rock is encount ered, whichever is less at an interval of 50 m over the width of river as per the specification and providing the result in tabular form.
14"At both the banks of flowing river by auguring up to a depth of 5 m from the ground level or till rock is encountered, whichever isless in the bank of river as per the specification and providing the result in tabular form. Note : Readings of two bore holes at both banks of the river shall be considered as One unit of reading."
15"Data Generation Survey Collection/ generation of data regarding Electrical HT crossing, location of existing CP unit & their Anode bed locations, railway ( both locomotive & Traction) etc. as per the specifications and submitting data in tabular form complete in all respect as per specif ications and direction of Site Engineer/Engineer-in-Charge."
16"Technical Report Submission of final technical report in six sets complete in all respect, including complete descriptions of tests supported by tabl es, graphs, analysis and any other measure as deemed fit to describe the data complete in all respect as per specifications and dire ction of Site Engineer/Engineer-in-Charge."
17"Hydrological Data Generation Hydrological data such as High Flood Level (HFL), maximum floods discharge (Q), Av. velocity of flow, extent of flood plain etc. bas ed on previous floods, of the rivers en-route, assessment of scour depth and flow pattern of rivers in the past 10 years. Relevant d etails shall be collected from the concerned Irrigation Dept. office or other relevant sources. Other data based on hydrological sur vey of river crossings, as per details mentioned earlier, for design and installation of such crossings."
18"Cadastral Survey Carrying out Cadastral Surveyof the pipeline route and other activities up to preparation & submission of schedule u/s 3(1) for es tablishing Right of User(ROU) in Right of Way(ROW) under P&MP Act, 1962 for laying cross country pipeline including development of t he computer software as per detailed scope of work enumerated in terms & conditions of the tender document and direction of Site Eng ineer / Engineer-in-Charge inclusive of all labour, material, equipment etc., complete in all respects."
19For acquiring additional ROW of 5m to 12m width, in general, along the existing pipeline route, if required, and at major river/ wat er course crossings, for the proposed pipeline
20"Obtaining Approvals / Permissions Obtaining approvals / permissions from appropriate respective State / National and other Statutory Authorities for the various pipel ine crossings enroute such as National Highways, State Highways, other roads, rail, river, canal / drain crossings or any other util ity crossings, Forest permission, etc. as per detailed scope of work specified in special conditions of contract and specifications of the tender document and direction of Site Engineer / Engineer-in-Charge, complete in all respect. Note: 1. Payment shall be made for obtaining each permission. Cluster of crossings needing permission from the same Authority, shall be co nsidered as one permission for the purpose of payment. 2. For Railway crossing, each crossing shall be treated as separate and payment shall be made on unit basis. "
21National Highway crossings under each authority
22State Highway crossings under each authority
23Other road crossings under each authority
24Railway crossings
25River crossings under each authority
26Canal crossings under each authority
27Other pipeline crossings and utilities
28Water bodies like ponds, lakes, creek, etc. under each Authority
29Statewise Forest permission
30"Providing ROW Services During Construction Providing services related to opening of Right of Way (ROW) and other activities after ROU acquisition, including serving notice, ma king of panchnama, collection of rates for crops, preparation of compensation, providing all necessary help in closing of ROW, all c omplete, as per requirement of pipeline laying works, detailed scope of work, specification of tender document and direction of SiteEngineer / Engineer-in-Charge inclusive of all labour, material, equipment etc., complete in all respect."
31"Establishment of camp office Total monthly payment on account of setting up of camp office in each spread. The unit ""Month"" shall be treated as per month per c amp office for payment. Note:- (1) The camp office(s) in different spreads shall be setup after issuance of specific notice for Part-D works by EIC. (2) One camp office shall be set up in each spread.Each camp office shall have minimum three (3 no.) manpower for carrying out day-t o-day activities. (3) The total monthly payment for keeping the camp operational with minimum required manpower, as per point (2) above, shall be paidon a lump-sum basis. (4) Merely keeping a camp will not entitle the contractor to claim monthly establishment charges. Monthly charges for keeping the ca mp operational shall be made after certification from E.I.C that camp with requisite manpower has actually been deployed for achievi ng the required progress as per schedule. No payment towards monthly charges for camp office shall be made if contractor fails to pr ovide the required services to match with the desired progress as per EIC. The decision of Engineer-in- Charge for certifying the re lease/non- release of monthly establishment cost will be final and binding."
32"Providing of RCC precast pillars Providing and fixing at or near ground level precast reinforced cement concrete in pillars / markers etc. as per approved pattern an d setting in position with cement plaster of 1:3 (1 Cement : 3 coarse sand) of size 150 mm X 150 mm and 300 mm height above ground w ith 300 mm X 300 mm X 300 mm footing below ground including the cost of required excavation, centering, shuttering, reinforcement, b ackfilling, painting with super acrylic emulsion paint of make Rangoli/Berger or equivalent on the exposed surface and writing of le tters complete. a)1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)"
33Carrying out contour survey and developing the contour map with level at 10 M c/c and contours at 0.5 M interval including staking a nd marking of plot boundary and development of drawings as per specification and direction of Engineer-in-Charge complete in all res pects. Note: This also includes setting/fixing and construction of Permanent Reference Pillar (Bench Mark) with erection of insert p late, engraving coordinates and levels etc. all complete as per direction of Engineer-in-charge. Note: The item also includes furnis hing of High Flood Level of the area.
34"Deployment & Erection of Boring craft & Rig in each borehole location as per specifications, SCC, Scope of work and direction of En gineer in-charge. Note: i)Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/drilling in river bed will not be considered as deployment / boring/drilling ""in water"" unless it is actually carried out in water. iii)Rate shall be inclusive of grouting back the boreholes as specified including cost for material, equipments and labour. iv) Core recovery >25 % shall be designated as rock v) Recording of rock core characterstics shall be as per specification."
35In Land
36In Water
37"Conducting Boring at Site in soil, Depth from GL/Bed level as per specifications, SCC, Scope of work and direction of Engineer in-c harge. Note: i)Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/drilling in river bed will not be considered as deployment / boring/drilling ""in water"" unless it is actually carried out in water. iii)Rate shall be inclusive of grouting back the boreholes as specified including cost for material, equipments and labour. iv) Core recovery >25 % shall be designated as rock v) Recording of rock core characterstics shall be as per specification."
38In Land
39In Water
40"Drilling through rock with Nx size double tube core barrel upto a depth as specified in SCC below GL/bed levelusing TC bit/diamon d bit as per specifications, SCC, Scope of work and direction of Engineer in-charge. Note: i)Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/drilling in river bed will not be considered as deployment / boring/drilling ""in water"" unless it is actually carried out in water. iii)Rate shall be inclusive of grouting back the boreholes as specified including cost for material, equipments and labour. iv) Core recovery >25 % shall be designated as rock v) Recording of rock core characterstics shall be as per specification."
41In Land
42In Water
43Standard Peneteration Test at different depth as per specifications,SCC, Scope of work and direction of Engineer in-charge.
44Plate Load Test
45Seismic Refraction
46GPR
47Trial Pits
48Collection of undisturbed samples at different depth as per specifications, SCC, Scope of work and direction of Engineer in-charge.
49Collection of disturbed samples at different depth as per specifications, SCC, Scope of work and direction of Engineer in-charge.
50Collection of Ground water samples & its chemical analysisas per specifications,SCC, scope of work and direction of Engineerin-charg e (only for Stations)
51Laboratory Tests
52(i) Particle Size Distribution
53(a) Sieve analysis.
54(b) Hydrometer analysis
55(ii) Atterberg limits.
56(iii) Natural moisture content.
57(iv) Bulk density of soil
58(v) Dry density of soil
59(vi) Specific Gravity
60(vii) Direct Shear Test
61(viii) Triaxial Shear Test (UD)
62(ix) Permeability Test
63(x) Consolidation Test
64(xi) Unconfined Compression Test
65(xii) Swelling Pressure Test
66(xiii) Free Swell Index Test
67(xiv) Shrinkage Limit Test
68(xv) Uniaxial compressive strength of rock sample
69(xvi) Specific gravity test of rock sample
70(xix) Chemical Analysis
71Preparation and Submission of Soil investigation report for HDD locations & stations including transfering the route alignment at si te for fixing of bore hole points, preparation and submission of crossing profile of rivers, canals and water bodies, preparation an d submission of plans and drawings, hydrological data of rivers, canals and water bodiesall complete as per specifications, SCC, Scope of work and direction of Engineer in-charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail