Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Construction of 500MT Godown with PaveyardEarth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 2 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 3 | Filling F&P with excavated material including cost of all materials labour etc. complete in all respect. |
| 4 | Collecting,supplying & labour for soling the road surface with soling stones including filling the interstices with sand watering and compaction to requied density including cost &conveyance of soling stone. |
| 5 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 6 | Random rubble H.G masonary in c.m(1:6) in foundation |
| 7 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-20grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, (A) plinth band |
| 8 | Column base |
| 9 | COLUMN AND BEAM (Upto5mt) |
| 10 | lintel band |
| 11 | Column & beam |
| 12 | wall band |
| 13 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. |
| 14 | C.C (1:2:4)with 12mm size HG chips including all cost, conveyance,royalty & taxes etc.comp.to work site as per the specification approved by the department & direction of E.I.C |
| 15 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge.upto 3mtr |
| 16 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge.Above 3mtr |
| 17 | Providing 12 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.upto3mtr |
| 18 | Providing 12 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.Above 3mtr |
| 19 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.upto 3mtr |
| 20 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.Above 3mtr |
| 21 | Supplying fitting and fixing of M.S.rolling shutters of approved size including carriage (market rate.) |
| 22 | Supplying, fabrication,fitting ,fixing & erection of M.S. angular truss & purlins . |
| 23 | Painting two coats with approved synthetic enamel paints of Asian / Berger/Dulox makeand of approved colour, shade to new Iron & wood workover a coat of red-oxide primer of Asian / Berger make including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. Note :- Sample of Paint & Primer shall be approved before procurement and use. |
| 24 | Supplying fitting and fixing of precoated Galvanized iron profile sheet semi gloss of 1000mm width and total coated thickness 0.45mm in roof drilling hole in wind ties including fixing of ridges valleys, wind ties including fixing of ridges valleys,wind ties etc. complete including cost of sheet and all fitting,all taxes labour,T&P etc.complete as per direction of Engineer-in-charge. |
| 25 | Supplying fitting and fixing of holding down bolts(600mm X 200mm) & base plate of 8mm thicknessincluding all cost labour etc. complete. |
| 26 | Distempering two coat to wallswith distemper of approved shade on new work to give an even shade excluding cost of distemper per sqm (data for 10 sqm)UPTO 3MTR |
| 27 | Distempering two coat to wallswith distemper of approved shade on new work to give an even shade excluding cost of distemper per sqm (data for 10 sqm)ABOVE 3MTR |
| 28 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge.UPTO 3MTR |
| 29 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge.ABOVE 3MTR |
| 30 | Antitermitetreatmentin foundations trenches,flooring with appropved chemicals including the costofmaterials and labour. |
| 31 | Labour charges for fixing glass strips of depth 0.075m. in joints in floor per 1 metre including cost of glass. |
| 32 | Cement punning with redoxide mix using 3.5 kg. of red oxide per 50 kg. of cement 1:3 poishing with carborandum stone. |
| 33 | Supplying,fitting & fixing of steel ventilator( 600 mmx600mm) glazed composite with M.S.Grill outside iron frame with glass pairs including supplying & fixing of putty & wire clips,screw & nails & cost of materials . |
| 34 | Supplying,fitting & fixing of steel ventilator glazed composite with M.S.Grill outside iron frame welded with wire netting ormesh with glass pairs including supplying & fixing of putty & wire clips,screw & nails & cost of materials . |
| 35 | Cost, conveyance and labour for admixing sand & moorum(40:60) and spreading in sub basenot exceeding 22.5cm in thickness and compaction to required density in OMC with PRR including hire and running charges of PRR as per specification and direction of Engineer-in-charge. |
| 36 | Cost,conveyance and labour for spreading stone screened dust and consolidation with PRR including watering ,cost and conveyance of stone screen dust etc complete |
| 37 | Cost,supplying & labour for spreading metal 40 mm to 62 mm for IRC Gr.II metalling to an uniform thickness of 100 mm compacted to 75 mm. And packing the voids with small stones and hand packing the same to proper camber including conveying spreading of filler materials and filling the interstices by spreading the same over the surface watering &consolidation with PRR including hire &running charges of PRR complete including all cost of material conveyanve, royalties,taxes etc. complete. |
| 38 | Construction of Traders shopEarth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 39 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 40 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 41 | fly ash brick masonryin c.m.(1:6) in F& P |
| 42 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-20grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, (A) Column base |
| 43 | Plinth band |
| 44 | Lintel |
| 45 | column and beam |
| 46 | Roof slab |
| 47 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. |
| 48 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge.upto 3mtr |
| 49 | Supplying, fitting & fixing vetrifed tile in floors of size 600mm x 600mm of approved make with application of polimer modified cement based water resistant adhesive bed of required thickness of 10mm & filling joints with epoxy grout of approved quality including cost of all materials, labour T&P etc required for the work.Data for 10 sqm, vide page - 235 of A/R - 2006, item - 1,in other building items chapter. |
| 50 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge. |
| 51 | Providing 6mm thick cement plaster in cement mortar (1:4) to Ceiling of Roof Slab, Stairs, Chajjas, shelves, lofts, beam soffit & sides & other R.C.C. surfaces including deep close chipping, roughening, scrapping, cleaning the exposed R.C.C. surface finishing smooth, providing masonry drip course & grooves wherever necessary including watering, curing, scaffolding etc, complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work, screening the sand etc. complete as per specification & direction of the Engineer-in-charge. |
| 52 | Providing and laying20mm thick grading plaster in cement mortar(1:4) with water proof cement compound with curing etc. all complete. |
| 53 | Supplyingandfixingin position M.S.Rolling Shutters |
| 54 | Painting two coats with approved synthetic enamel paints of Asian / Berger/Dulox makeand of approved colour, shade to new Iron & wood workover a coat of red-oxide primer of Asian / Berger make including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. Note :- Sample of Paint & Primer shall be approved before procurement and use. |
| 55 | Distempering two coat to wallswith distemper of approved shade on new work to give an even shade excluding cost of distemper per sqm (data for 10 sqm) |
| 56 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge. |
| 57 | Cost,supplying, fixing of 0.25m x 0.25m size sky light etc complete |
| 58 | Fixing glazed floor tiles of size 30 cm x30 cm.in floors ,treads on steps and landing on 25 mm thick bed of cement mortar 1 :1 (1 cement :1 sand ) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete including cost of glazed floor tiles. |
| 59 | Construction of RCC cold storeEarth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 60 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 61 | Filling F&P with excavated material including cost of all materials labour etc. complete in all respect. |
| 62 | Collecting,supplying & labour for soling the road surface with soling stones including filling the interstices with sand watering and compaction to requied density including cost &conveyance of soling stone. |
| 63 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 64 | Random rubble H.G masonary in c.m(1:6) in foundation |
| 65 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-20grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, (A) plinth band |
| 66 | Column base |
| 67 | COLUMN AND BEAM (Upto5mt) |
| 68 | lintel band |
| 69 | Staircase |
| 70 | Column & beam |
| 71 | Roof slab |
| 72 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. |
| 73 | C.C (1:2:4)with 12mm size HG chips including all cost, conveyance,royalty & taxes etc.comp.to work site as per the specification approved by the department & direction of E.I.C |
| 74 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge.upto 3mtr |
| 75 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge.Above 3mtr |
| 76 | Providing 12 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.upto3mtr |
| 77 | Providing 12 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.Above 3mtr |
| 78 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.upto 3mtr |
| 79 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.Above 3mtr |
| 80 | Providing 6mm thick cement plaster in cement mortar (1:4) to Ceiling of Roof Slab, Stairs, Chajjas, shelves, lofts, beam soffit & sides & other R.C.C. surfaces including deep close chipping, roughening, scrapping, cleaning the exposed R.C.C. surface finishing smooth, providing masonry drip course & grooves wherever necessary including watering, curing, scaffolding etc, complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work, screening the sand etc. complete as per specification & direction of the Engineer-in-charge. |
| 81 | White washing 2 coat with shell lime per 1sqm (data for 93 )sqm |
| 82 | Supplying fitting and fixing of M.S.rolling shutters of approved size including carriage (market rate.) |
| 83 | supplying MS Steel & labour for roof truss workfixing, placing in position including cost etc.. |
| 84 | Painting two coats with approved synthetic enamel paints of Asian / Berger/Dulox makeand of approved colour, shade to new Iron & wood workover a coat of red-oxide primer of Asian / Berger make including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. Note :- Sample of Paint & Primer shall be approved before procurement and use. |
| 85 | Supplying fitting and fixing of precoated Galvanized iron profile sheet semi gloss of 1000mm width and total coated thickness 0.45mm in roof drilling hole in wind ties including fixing of ridges valleys, wind ties including fixing of ridges valleys,wind ties etc. complete including cost of sheet and all fitting,all taxes labour,T&P etc.complete as per direction of Engineer-in-charge. |
| 86 | Supplying fitting and fixing of holding down bolts(600mm X 200mm) & base plate of 8mm thicknessincluding all cost labour etc. complete. |
| 87 | Distempering two coat to wallswith distemper of approved shade on new work to give an even shade excluding cost of distemper per sqm (data for 10 sqm)UPTO 3MTR |
| 88 | Distempering two coat to wallswith distemper of approved shade on new work to give an even shade excluding cost of distemper per sqm (data for 10 sqm)ABOVE 3MTR |
| 89 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge.UPTO 3MTR |
| 90 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge.ABOVE 3MTR |
| 91 | Antitermitetreatmentin foundations trenches,flooring with appropved chemicals including the costofmaterials and labour. |
| 92 | Labour charges for fixing glass strips of depth 0.075m. in joints in floor per 1 metre including cost of glass. |
| 93 | 20mm thick grading cement plaster (1:4) over roof salb including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm |
| 94 | S/F/F of Kota stone tiles size above 0.10 sqm in floors.(16 mm thick) |
| 95 | Cost, conveyance and labour for admixing sand & moorum(40:60) and spreading in sub basenot exceeding 22.5cm in thickness and compaction to required density in OMC with PRR including hire and running charges of PRR as per specification and direction of Engineer-in-charge. |
| 96 | Cost,conveyance and labour for spreading stone screened dust and consolidation with PRR including watering ,cost and conveyance of stone screen dust etc complete |
| 97 | Cost,supplying & labour for spreading metal 40 mm to 62 mm for IRC Gr.II metalling to an uniform thickness of 100 mm compacted to 75 mm. And packing the voids with small stones and hand packing the same to proper camber including conveying spreading of filler materials and filling the interstices by spreading the same over the surface watering &consolidation with PRR including hire &running charges of PRR complete including all cost of material conveyanve, royalties,taxes etc. complete. |
| 98 | Inserting bituminousexpansion joints Board12 mm. thick of depth 0.075 m. including cleaning . |
| 99 | REPAIRING OF DRAINDismantling brick or stone masonary in lime or cement mortar under 3mt height including stacking the useful materials for re-use & removing the debris with in 50mt lead (data for 2.83 cum) per 1cum |
| 100 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 101 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge.upto 3mtr |
| 102 | Providing 12 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.Above 3mtr |
| 103 | Construction of garraage PITEarth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 104 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 105 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 106 | Random rubble H.G masonary in c.m(1:6) in foundation |
| 107 | C.C (1:2:4)with 12mm size HG chips including all cost, conveyance,royalty & taxes etc.comp.to work site as per the specification approved by the department & direction of E.I.C |
| 108 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge.Above 3mtr |
| 109 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge.UPTO 3MTR |
| 110 | WATER SUPPLY ARRANGEMENT Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigsor combination drilling rigs as required to suit the site condition with the use of own rigs with its accessories, toolsand plant, and consumables etc., for lowering ofdia P.V.C./ G.I. pipes foe housing, fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I./ P.V.C. casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tudewell). Drilling of 125mm dia bore—0 mtr. to 30 metrs. |
| 111 | Drilling of 100mm dia bore – 30 mtrs to 60 mtrs |
| 112 | Lowering the following size GI/PVC pipes with or without slotted pipes as per the necessity from ground level upto 40 mtrs depth and fitted and fixed up in perfectly vertical position, including cutting and threading pipe and slotted pipe and supplying and fixing all jointing materials, tools and plant etc., complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above. Lowering of 125dia – 0 mtr. To 30 mtr. |
| 113 | Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tubewell including supply and use of all necessary equipment and labours per the direction of Engineer-in-charge.Developing the tubewell – 1 item |
| 114 | Supplying all materials and labour, tools and plant and providing sanitary sealing by cement concrete grouting of annular space around GI/ PVC/MS housing pipe upto 5 mtrs. below ground level (as per drawing) to plug the bore hole excluding cost of cement all complete as per direction of the Engineer-in-charge. Minimum one mte, of casing pipe to be inserted in the bore into the rock at the bottom to ensure sanitary sealing .Sanitary sealing upto 5 Mtr below ground level. |
| 115 | Provision for geophysical sounding survey to aceess ground water status before excavation of bore well by a authorised geologist Transportation of geologist with apparatus to conduct geophysical sounding survey including site-clearance for approach of vehicle.Geophysical sounding survey |
| 116 | Construction of Platform with 3.00 Drain as per specification. |
| 117 | Supplying all materials labour T&P for fitting & joining of the following PVCpipe of schedule-80confirmingto ASIM-D-1785 to use as caseing pipe withfitting, cutting, threading to pipe as per the direction of the Engineer – in – charge , cost , conveyance of all materials labours, all taxes etc all complete.125 mm dia PVC pipe of schedule -80 |
| 118 | Cost of Indian Mark-III Water Pump including all fittings with 38mm dia G.I Pipe Medium quality to required length etc. |
| 119 | Earth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 120 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 121 | Filling F&P with excavated material including cost of all materials labour etc. complete in all respect |
| 122 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 123 | Providing FlyAsh brick masonry work in Foundation & Plinthwith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge. |
| 124 | 12mm thick cement plaster (1:4) over brick work including all cost conveyance royalty & taxes etc. comp. to work site per 1sqm. |
| 125 | Supplying, fitting & fixing vetrifed tile in floors of size 600mm x 600mm of approved make with application of polimer modified cement based water resistant adhesive bed of required thickness of 10mm & filling joints with epoxy grout of approved quality including cost of all materials, labour T&P etc required for the work.Data for 10 sqm, vide page - 235 of A/R - 2006, item - 1,in other building items chapter. |
| 126 | Cost of supplying syntax water tank including materials costs etc.. |
| 127 | Construction of M.S fly leafEarth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 128 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 129 | Filling in F&P with excavated earth within initial lead |
| 130 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 131 | Providing FlyAsh brick masonry work in Foundation & Plinthwith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge. |
| 132 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-20grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, (A) Column base |
| 133 | column and beam upto3mtr |
| 134 | column and beam above3mtr |
| 135 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. |
| 136 | Supplying,fitting,fixing of M.S Angle grill gate/Rolling shutter/ventilator including all cost convenyance etc. complete. |
| 137 | Painting two coats with approved synthetic enamel paints of Asian / Berger/Dulox makeand of approved colour, shade to new Iron & wood workover a coat of red-oxide primer of Asian / Berger make including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. Note :- Sample of Paint & Primer shall be approved before procurement and use. |
| 138 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge. |
| 139 | Providing 6mm thick cement plaster in cement mortar (1:4) to Ceiling of Roof Slab, Stairs, Chajjas, shelves, lofts, beam soffit & sides & other R.C.C. surfaces including deep close chipping, roughening, scrapping, cleaning the exposed R.C.C. surface finishing smooth, providing masonry drip course & grooves wherever necessary including watering, curing, scaffolding etc, complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work, screening the sand etc. complete as per specification & direction of the Engineer-in-charge. |
| 140 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge. |
| 141 | Dismantling & removing Rcc concrete including the useful materials for reuse & removing the debris with in 50 mt lead. |
| 142 | S/F/F of marble up to size 0.10 sqm to 0.4sqm i.e up to 2\"1\" x 2\"1\" (16mm thick) in floors |
| 143 | Construction of Covershed (2nos)Earth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 144 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 145 | Filling foundation trenches and plinth with excavated earth including watering ramming and compacting in layers not exceeding 150mm thick including labour sundries T&P etc complete and as per direction of engineer -in- charge. |
| 146 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 147 | RRHG stone masonryin c.m.(1:6) in F& P |
| 148 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge. |
| 149 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-20grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, (A) plinth band |
| 150 | Column base |
| 151 | Column and beam |
| 152 | Roof slab |
| 153 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. |
| 154 | C.C (1:2:4)with 12mm size HG chips including all cost, conveyance,royalty & taxes etc.comp.to work site as per the specification approved by the department & direction of E.I.C |
| 155 | Providing and laying 20 mm.thick grading plaster in C.M.(1:4)with curing etc complete. |
| 156 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge.UPTO 3MTR |
| 157 | Labour charges for fixing glass strips of depth 0.05m. in joints in floor per 1 metre including cost of glass. |
| 158 | Providing 6mm thick cement plaster in cement mortar (1:4) to Ceiling of Roof Slab, Stairs, Chajjas, shelves, lofts, beam soffit & sides & other R.C.C. surfaces including deep close chipping, roughening, scrapping, cleaning the exposed R.C.C. surface finishing smooth, providing masonry drip course & grooves wherever necessary including watering, curing, scaffolding etc, complete with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work, screening the sand etc. complete as per specification & direction of the Engineer-in-charge. |
| 159 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge. |
| 160 | Construction of C.C Road Earth work in hard soil or gravalley soil in foundation within 50M initial lead and 1.5Minitialliftincludingroughdressingand breaking clodstomaximum5cmto 7cm& laying in layers not exceeding 0.3M in depth and as per the direction of the Engineer-in-Charge. |
| 161 | Labour for admixing sand and moorum etc. complete including cost of all labour, and hire charges of T & P materials required for work as per the direction of EIC but excluding cost, conveyance of sand and moorum. ( Unit-1cum, taking output-1cum) |
| 162 | Providing, laying, spreading, and compacting stone agreegate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 8-10 tones PRR to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of course agreegate, watering and compacting to the required density as per Clause 404 of MoSRT&H Specification for road and Bridge work (4th Revision) UNIT = lCUM, Taking Output = 360 cum |
| 163 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 164 | Supplying all materials and labour for laying sub-base in layers not exceeding 100mm thick watering & compaction to be required density in with PRR. Unit = 1cum, taking out put -2.83 cum Sub-base with stone dust |
| 165 | Cement concrete(1:2:4) with 12 mm sizehard granite crusher broken chips |
| 166 | Inserting bituminousexpansion joints Board12 mm. thick of depth 0.075 m. including cleaning . |
| 167 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge. |
| 168 | Filling foundation trenches and plinth with excavated earth including watering ramming and compacting in layers not exceeding 150mm thick including labour sundries T&P etc complete and as per direction of engineer -in- charge. |
| 169 | SITE DEVELOPMENT Fine dressing of earthwork in ordinary or hard soil in according to the direction of department including cutting or filling earth upto 0.15 m. depth of surface. |
| 170 | Cleaning and gubbing land including uprooting rank vegetation grass ,bushes,shrubs,saplings and trees girth upto 300mm, and disposal of unserviceable materials and stacking of serviceable materials, upto a lead of 1000 mtrs including removal and disposal of top organic soil not exceeding 15 cm in thickness per hectare by mechanical means. |
| 171 | Sub-base with admixture of morum and sa( morum 60% + sand 40% ) |
| 172 | Construction Compound wallEarth work in excavation of foundation trenches in hard soil soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders required depth and depositing the excavated materials away from the work site with all leads and lifts including shoring shuttering & dewatering (if required) with cost of labour hire & running charges of waterpumps sundries & T & P required for the work complete as directed by the Engineer in charge. |
| 173 | Supplying and filling plinth with sand well watered and rammed in layers not exceeding 23 cm in depth with all lead and lift including cost, conveyance,loading,unloading,royalities and taxes of all materials cost of all labour sundries T&P required for the work etc complete in all respect as directed by the engineer in charge (Measurement will be taken on finished compacted section only.) |
| 174 | Providing and laying PCC (1:3:6) in foundation & plinth using 40mm size crusher broken HG metal of approved quality from approved quarry including hoisting. Lowering and laying concrete to the required level ramming, watering & curing etc complete including cost conveyance of all materials with all taxes and royalties all labour with sundries T&P including hire and running charges of machineries required for the work etc complete in all respect and as per the direction of Engineer-in-charge. |
| 175 | Providing FlyAsh brick masonry work in Foundation & Plinthwith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge. |
| 176 | Providing, lifting, hoisting and laying Reinforced Cement Concrete of M-20grade inColumn base, Column Footings, Raft Foundation,StemoftheColumns, beams, chaujja, fin, lintel, stair case, jali , shelvesandslab etcas per approved designs and drawings having a minimum compressive strength ( in work test)20N. / Square mm. in 15 cm. cubes at28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleanedto be mixed in concrete mixturewith approved quality of cementincluding hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days including, centering and shuttering then after dismantling and removing thedebrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, (A) PLINTH BAND |
| 177 | COLUMN BASE |
| 178 | COLUMN AND BEAM |
| 179 | Cutting,Straightening coiled or bent up M.S plain HYSD/TMT reinforcement bars welding or jointing if necessary bending,binding,tying the grills as required for R.C.C works,providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance,loading, unloading & taxes of M.S plain/HYSD/TMT reinforcement bars and binding wires of 18 to 20 gaugo required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S plain/HYSD/TMT reinforcement bars consumed in the work only. |
| 180 | Providing FlyAsh brick masonry work in Super Structurewith fly ash bricks 25cmx12 cm x8 cm tolerance of ± 2% sizebricks having crushing strength not less than 75 kg/cm2 with cement mortar 1 cement: 6 sands with all necessary projection, splay cutting, circular moulding, corbelling, etc., including cost of all materials, labour,conveyance, loading ,and unloadining, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants, etc., as per the direction of the Engineer-in-charge. |
| 181 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar and finished smooth to the rough surface of the brick masonry wall after racking out joints (along with providing grooves wherever necessary) including watering and curing rounding of corner etc. complete with cost, conveyance, loading, unloading, royaltiesand taxes of all materials, cost all labour, I & P, sundries and scaffolding required for the work etc as directed by the Engineer in charge. |
| 182 | Painting two coats with fungal resistance weather seal coat of approved shade of make Dulux / Asian / Berger (Apex Ultima quality) over a coat of primer by means of brush to out side surface of walls after cleaning the surface including watering, curing etc complete in all floors including cost, conveyance, taxes of all materials, labours, sundries, T&P required for the work etc. complete in all respect as per specification & direction of Engineer-in-charge. |
| 183 | Filling foundation trenches and plinth with excavated earth including watering ramming and compacting in layers not exceeding 150mm thick including labour sundries T&P etc complete and as per direction of engineer -in- charge. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail