| 1 | Sinking of Deep Bore well |
| 2 | Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200 cfm/ 300 psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc for lowering of 200 mm dia PVC/GI pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (PVC/GI casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the Bore well).as per the direction of Engineer -in Charge |
| 3 | Drilling to accommodate 200 mm x 150 mm size vertical bore hole (0.00 to 100.00 mtr) in each units with total4 units of Bore well to be executed in cluster with a total depth as mentioned. |
| 4 | a) Lowering the PVC/GI casing pipe of 175 mm dia with or without slotted pipes as per the necessity from ground level to 20 Mtrs. Or above depth and fitted and fixed up in perfectly vertical position, including cutting, threading and slotted pipe and supply and fixing all jointing materials, tools and plants etc. Complete and keeping the top of the casing pipe threaded including plugging the bore well to prevent entry of foreign materials from above (0 to 30 Mtrs=30 Mtrs) with total4 units of Bore well to be executed in cluster with a total depth as mentioned. |
| 5 | b) Supply of 175 mm nominal diameter PVC pipe of 40 Schedule (ASTM-D) made having 12.434 Kg/Wt per meter in 4 units of Bore well to be executed in cluster with a total depth as mentioned. |
| 6 | Cleaning and developing the tube well using their own compressor continuously worked till clear and adequate discharge is obtained from the well including supply and use of all necessary equipment and labour as per the direction of the Engineer-In-Charge. |
| 7 | Power supply Cost(ElecricalEnergy) |
| 8 | Trasfermer |
| 9 | Construction of 25 KVA,11/0.4 KV Sub station |
| 10 | Supports PSC Pole 9 mtr long, 300kg |
| 11 | Supports PSC Pole 8 mtr long, 200kg |
| 12 | Construction of 25KVA.11/0.4KV DP Mounted Sub-Station - 1No |
| 13 | Top channel 100x50x6mm.2.8mtr. Long,2Nos.(9.2kg./mtr.) |
| 14 | Transformer mounting channel 100x50x6mm.2.8mtr. Long,2Nos.(9.2kg./mtr.) |
| 15 | A/B switch and HG fuse mounting Channel 75x40x6mm.(4x2.8mtr.) Long(6.8kg/mtr.) |
| 16 | Cantilever Channel for supporting A/B switch HG fuse arm 75x40x6mm. 1.5mtr. Long,4Nos. (6.8Kg./mtr.) |
| 17 | Angle for Cantilever arrangement for A/B switch HG fuse 50x50x6mm. 1.5mtr.,4Nos. (4.5Kg./mtr.) |
| 18 | 75x40x6 mm Channel 1.5 mtr. Long 1 No.(6.8 kg/mtr) for supporting of AB Switch handel. |
| 19 | Transformer belting angle 50X50X6mm angle 2.8mtrs long 2nos (4.5kg per mtr). |
| 20 | 11 KV Disc insulator (T&C Type) |
| 21 | 11 KV H/W Fitting (T&C Type) |
| 22 | 11 KV A/B Switch 3Pole (400Amp) |
| 23 | 11 Kv HG fuse 3 pole (400Amp) |
| 24 | 11KV Lightning Arrestor (12 KV, 5KA) |
| 25 | H.T Stay Set Complete |
| 26 | H.T Stay Insulator |
| 27 | H.T Stay Clamp |
| 28 | G.I. Pipe Earthing, 40mm. Dia medium gauge 3 mtr. Long |
| 29 | Earthing of Support (Coil type) |
| 30 | G.I. Nuts, bolt & Washer |
| 31 | Clamp for bracing Channel |
| 32 | No. 6 G.I.wire for earthing |
| 33 | 7/10 SWG Stay wire |
| 34 | Concrete material for Stay Anchor Plate |
| 35 | Padding & Concreting material for support |
| 36 | Material for masonary work for earth pit |
| 37 | Charcol, Salt etc. for earthing |
| 38 | LT distribution box with MCCB and busbar arrangement no-1 |
| 39 | LT 3.5 PVC cable 50sqmm for 25Kva s/s |
| 40 | Socket and other cable accessaries |
| 41 | Sundries (Anticlimbing device, Paint. Danger Board ect.) |
| 42 | accessories for 3Ph 3W 11KV line with 9mtr X 300Kg PSC pole for pin point and two nos cut points with double disc arrangement for 55sqmm AAAC (80mtr span) - 0.17Km |
| 43 | 55mm2 AAAC Conductor. |
| 44 | 11 KVV- Cross Arm (MS) (10.2 Kg each) |
| 45 | Back Clamp for \"V\" Cross Arm (17kg) |
| 46 | 11 KV F Clamp 2.9 Kg. each |
| 47 | 11KV Disc Insulator (T&C) |
| 48 | 11 KV H/W Fitting (T&C Type) |
| 49 | 11KV Pin Insulator |
| 50 | 11KVGI Pin |
| 51 | H.T.Stay set complete |
| 52 | Stay Insulator |
| 53 | Stay Clamp |
| 54 | 7/10 SWG Staywire |
| 55 | Earthing of support (Coil Type) |
| 56 | G.I. Nuts, bolt & Washer |
| 57 | 75X40X6mm. Channel for straight cross arm (1.2mtr. X 12nos.) |
| 58 | Concrete materials for stay anchor plate. |
| 59 | Padding and concreting materials for support |
| 60 | Sundries (Paint, danger Board, Clamp, Connectors, Anticlimbing device, Binding Tape, etc.) |
| 61 | 3Ph 5w LT line on 8M X 200Kg PSC pole with 35sqmm AB Cable - 0.85Km |
| 62 | Arial Bunch Conductor (ABC) with 3x35mm.sq.(for Phase) +1x70mm.sq. Catenary (Neutral) +1x16mm.sq. (Street Light Phase)for 3-Phase 5-wire having overhead line. |
| 63 | Pole Clamp for AB Cable |
| 64 | Dead end Clamp (For ABC) |
| 65 | Eye Hook for AB Cable |
| 66 | Suspension Clamp |
| 67 | Neutral Connector Type B |
| 68 | LT Stay Set |
| 69 | 7/12SWG Stay wire |
| 70 | LT Stay Clamp (1.40 Kg./Pair) |
| 71 | LT Stay Insulator |
| 72 | Earthing Coil |
| 73 | No.8G.l.wire for earthing |
| 74 | G.I. Nut & Bolts(Assorted size) |
| 75 | Piercing Connector |
| 76 | Concreting of Stay |
| 77 | Padding & Concreting material for support. |
| 78 | Accessories for 11Kv intermediate pole on 9M X 300Kg PSC pole - 03 nos |
| 79 | 11 KVV cross arm |
| 80 | Back Clamp for \"V Cross Arm |
| 81 | 11KV Pin Insulator |
| 82 | 11KVGI Pin |
| 83 | F\" Clamp |
| 84 | G 1. Nuts, bolt & Washer |
| 85 | Concreting of pole |
| 86 | Coil earthing |
| 87 | Stock, Storage & Insurance @ 3% of H=l |
| 88 | T&P @ 2% of J |
| 89 | Contingency @ 3% of J |
| 90 | Transportation @ 7.5% of J |
| 91 | Erection Charges @ 20% of B+GST on erection charge |
| 92 | Erection Charges @ 10% of G |
| 93 | Erection Charges @ 5% of A |
| 94 | Fencing of barbed wire SMetal gate as per WESCO norms |
| 95 | Metal spreading as per WESCO norms+GST on metal spreading |
| 96 | Inspection fees of 25KVA S/S |
| 97 | Inspection fees of HT line. |
| 98 | Inspection fees of LT line. |
| 99 | Drawing of Approval |
| 100 | Whole current meter 3 ph. 20-100 amp.with TP box. |
| 101 | Testing fees of Meter with GST |
| 102 | Processing fees + GST |
| 103 | INTERNAL ELECTRIFICATION INCLUDING EARTHING ETC COMPLETE, SERCICE CONECTION & SECURITY DEPOSITS ETC. |
| 104 | Service Connection and Security Deposits |
| 105 | Cost of 6sqmm three core Cable 25rmt @ 70/-rmt |
| 106 | Provision of Internal Electrification including earthing etc. complete |
| 107 | Pump Installation (Including GST) |
| 108 | 3 Phage Electric Submersible Pump with head range 10- 120m (Kirloskar/ Crompton/ Usha/Mahindra/CRI/Texmo) |
| 109 | HDPE Coil Pipe 1.5\" |
| 110 | 3 Phage Control Pannel |
| 111 | 2.5mm 3 Phage Cable Wire |
| 112 | 8mm Roof Wire |
| 113 | Bore Cap 8\" |
| 114 | Bore Clamp |
| 115 | 1.5\" SS Niple |
| 116 | 1.5\" G.I Bend |
| 117 | 1.5\" x 12 Short Pic |
| 118 | 1.5\" x 2\" R.S Nipple |
| 119 | Fitting of MS Cover with lock & key provision for pump |
| 120 | Fixing, fitting, Barbed wire fencing of height 1.8 Mtr with suitable MS Pole (Angle) 50x50x5. Concreting the MS Pole to a minimum depth of 0.75 Mtr with (1:2:4 CC) and MS gate around solar panel including all cost of materials, TC, Royalty, T&P all Complete. |
| 121 | Supplying , fixing and fitting of Display board of size 8\" x 6\" made of MS plate with approved enamel paint over primer and project information display, placed atleast 5\" height from ground and embeded legs of boards in earth with CC(1:2:4) |
| 122 | Photography, Vedeography of project,LS |