Plantation Work With Gabion And Fencing In Various Locations/Footpaths Under J.N.A.C., Jamshedpur,Distt-East Singhbhum , jamshedpur-Jharkhand

Urban Development Department-UDD has published Plantation Work With Gabion And Fencing In Various Locations/Footpaths Under J.N.A.C., Jamshedpur,Distt-East Singhbhum . Submission Date for this Tender is 03-01-2022. Wire Fencing Tenders in jamshedpur Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

30349194
Corrigendum : Plantation Work With Gabion And Fencing In Various Locations/Footpaths Under J.N.A.C., Jamshedpur,Distt-East Singhbhum
Open Tender
Indian
Jharkhand
jamshedpur
03-01-2022

Tender Details

Plantation Work With Gabion And Fencing In Various Locations/Footpaths Under J.N.A.C., Jamshedpur,Distt-East Singhbhum

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 24-Dec-2021 corrigendum Other 03-01-2022

Key Value

Document Fees
INR 10000 /-
EMD
INR 399904.0 /-
Tender Value
INR 1.99 Crore /-

BOQ Items

Name of Work: Plantation Work With Gabion and Fencing in various Locations/ footpaths under J. N.A.C. JamshedpurDistt. - East. Singhbhum.
Sl. No. Item Description
1First Year :- Fencing Work Bamboo stalks - 04 nos. each @ 80.00 including freight
2Construction of Bamboo trellis
3Painting bamboo stalks with coal tar/black japan/black paint
4Painting trelli units with green and red paint
5Soil levelling for gabion installation. Digging 04 pits for each unit with size 1"x1"x1"-6", alongwith accumulation of the excavated soil.
6Installation of stalks alongwith trellis - 04 stalks - 29 stalks per manday
7For trellis :-1. wire - 100 gm (Rs. 67 per kg)
82. nails - 300 gm (Rs. 69 per kg)
9Earth work : Digging of pits 2"x2"x2" alongwith accumulation of excavated soil
10Plant cost with provision of 20% extra plants for replacement of dead plants alongwith carriage/unloading of plants
11sign board and gabion numbering
12GPS photograph
13Maintainance/plantation works 2nd year :- Procuring sand/manure with mixture preparation(sand and vermicompost) for pit filling
14Plantation (DAP - 50 gm and insecticide - 4 gm)
153 times Weeding and hoeing (1st - 5 gm urea, 5 gm inseticide; 2nd - 10 gm urea, 5 gm insecticide; 3rd - 5 gm urea, 5 gm insecticide) Roger spray in leaves, replacement of dead plants
16Watering ( through rickshaw/trolley)
17Watch and Ward
18GPS photograph
19Maintenance (3rd year):- Weeding and hoeing (1st - 5 gm urea, 5 gm inseticide; 2nd - 10 gm urea, 5 gm insecticide; 3rd - 5 gm urea, 5 gm insecticide)
20Watering ( through rickshaw/trolley)
21Watch and Ward/repairing of gabions
22GPS photograph
23Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item - A) and disposal ofexcavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design building specification and direction of E/I.
24Providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per buiding specification and direction of E/I.(Mode of measurement compacted volume)
25Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. 1:2:4 (1 cement : 2 coarse sand (zone-lll) :4 gradde stone aggregate 40 mm nominal size)
26Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 cement :1.5 coarse sand (zone-lll) :3 gradde stone aggregate 20 mm nominal size)
27Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
28Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
29Labour for fitting and fixing barbed wire fencing in four rows horizontal upto a height of 1.85M. and two diagonals including fixing of post in cement concrete at 2.5M centres including cost of staples (but excluding the cost of cement concrete angle iron post, its cutting and making holes, nuts and bolts) all complete as per building specifications and direction of E/l.
30Carriage Cost of Cement
31Carriage Cost of Sand
32Carriage Cost of Stone Chips
33Carriage Cost of Bricks
34Total
35Add GST @ 12%
36Total
37Add Labour Cess @ 1%
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail