Bids Are Invited For Mobile Toilet - Size Of Mobile Bio-Toilet Trailer: Length ( L ) = 19.4 Ft, Width ( W ) = 9Ft ( With Both Side Pathways ) , Height From Ground Level ( H ) = 10 Ft, Chassis:- The Chassis Made From M.S. 100Mm X 50Mm Ismc With Necessary Cross Members, Cabin Structure:- Cabin Structure Should Be Fabricated By Using:- M.S. Angle 35Mm X35mm X 5 Mm. M.S ‘T’ 35Mm X35mm X 5 M, Cabin Panels:- Cabin Panels Should Be Approx. 30Mm Thick Ppgi Puff Panel Both Side 0.4Mm Ppgi Sheet With 30 Mm Puff. The Density Of Puff Is 40Kg / M3, Doors:- Door Size Should Be Approx. 6’X22’’, Louvers Should Be Provided On All Doors For Proper Ventilation& Louvers Height Should Be Min. 450Mm In All Doors ( Door Should Be Made By Ppgi Puff Panel Both Side 0.5Mm Ppgi Sheet Sandwiched With 30 Mm Puff. The Density Of Puff Is 40Kg / M3door Should Be Equipped With Stainless Steel 304 Flushing Thickness 0.5Mm , Tower Bolts, Hinges, S.S. Handle Grips & Proper Locking Arrangement On Both Sides, Roof , Description - Structure:-Roof Structure Should Be Fabricated Should Be Covered With 30 Mm Thick Ppgi Panel Grab With Stainless Steel 304 Flushing Thickness 0.5 Mm Should Be Fixed In Such A Way That It Covers The Areas Up To Both Side Path-Way Railings. Both Side End Portions Of The Roof Ppgi Puff Should Be Equipped With Hut-Shaped Water Flow Galleries., Path-Way:- Path-Way ( For Both Sides ) Should Be Fabricated By Using M.S. Angle 35Mm X 35Mm X 5Mm And M.S. Flat 25Mm X 3Mm & Should Be Approx. 600Mm Wide. The Path-Ways Flooring Should Be Equipped With 1.5 Mm Aluminium Chucker Sheet., Side Railings :-Side Railings Should Be Provided By Using Stainless Steel 304 Square Pipe Or Rectangular Pipe Size 2’’ X 1” Or 1”X1” ., Stairs:- Proper Stairs ( 2Nos. Stairs Assy. - 1For Each Side, Detachable Type ) Arrangement With Side Railing Should Be Provided On Both Sides ( Stairs Should Be Manufactured In Such A Way That Two Persons Should Be Able To Walk Freely At Same Time, Step Height Should Not Be More Than 6’’ & Should Be One Foot Wide ) . Stairs Should Be Manufactured By Using Rectangular Pipe Size 1’’ X 1’’ Covered With Aluminium Chucker Sheet 1.5 Mm . , , Detail - Flooring:- Floor Panel Should Be Integrated With Stainless Steel Squatting Pan ( There Should Be No Joints ) Footrest And Skirting Should Be Frp Moulded. The Squatting Pan Should Be Provided In Such A Way That It Could Be Cleaned Quickly. The Squatting Pans Connected With Tank With The Help Of Pipe, The Connection Pipe Should Be In Slopy Form, One End Of The Pipe Should Be Connected With The Squatting Pan Outlet & 2Nd Side Of The Pipe Should Be Dipped Inside The Tank Maximum 4’’ Below The Bacterial Level., Washbasin:- Two Stainless Steel Washbasins Of Better Quality Should Be Provided On The Rear Side Or Two Stainless Steel Washbasins Of Better Quality Should Be Provided On The Front Side Washbasins Should Be Provided With 2 Nos Water Taps With Suitable Pipe Line Arrangement, 1Nos Towel Hangers & 2Nos. Soap Dispensers , Mirrors Etc., , Detail Item - Mirrors:- Four Mirrors Should Be Provided With Washbasins., Bio Tank:- This Tank Should Have Capacity ( Min. ) 1500Ltrs. & Made From Frp ( Frp Tank Sheet Thickness Should Be ( Min. ) = 6Mm, Partitions Should Be Provided Inside The Tank & Each Partition Should Be Equipped With Bacterial Trap Mat. Tank Should Be Connected With Gas Discharge Pvc Isi Marked Pipe & One 3’’ Pipe Should Be Provided For Treated Waste ( Which Is A Clear Odourless Liquid ) Discharge From Tank. For Cleaning Or Empting Purpose One 80Mm Gate Valve With Nipple & Suitable Dia., Clean Water Tank:- Water Tank Should Have Minimum Capacity Of 825 Ltrs, Should Have Suitable Pipe Line Connections To Each Cabin ( Connections To Push Cock Type Taps ) , Washbasins Etc. Tank Should Be Provided At Front Of Trailer. Water Tank Covered With Ppfi Puff 30 Mm Thick Panel Frame With Ss304 Outer Flushing Thickness 0.5 Mm., Electric Point:- Electric Points With Led Light Arrangement Should Be Provided In All Toilets & Light Arrangement Should Also Be There And Junction Box Fitted On Outside Of Toilet For Input Cable And Control., Towing Arrangement:- Should Be Fabricated With Using M.S. Channel, Thrust Bearing, Bearing Holder And Towing Hook With Spring Etc., Suspension:- Should Be Consisting With 2Nos. M.S. Square Axles With Taper Roller Bearing, Hub, Road Spring, Leaf Spring Arrangement, 4Nos Tyre & Tubes With Size 7.50 X 16Ply Etc., Tool Box:- One Tool Box Cabin With Locking Arrangement Should Be Provided., Paint:- All Parts Of Trailer Mounted Mobile Bio-Toilet Should Be Painted Appropriately. Total Quantity : 1