| 1 | Earthwork in excavation of foundation in hard soil including dressing & levelling of bed within initial lead of 50mt. & lift of 1.5mtr etc complete as per the direction of the Engineer-incharge. |
| 2 | Filling in foundation & plinth with sand including watering & ramming etc complete as per the direction of the Engineer-incharge. |
| 3 | Cement concrete (1:4:8) with 4cm size h.g.b. crusher broken metal of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement T&P required etc. complete as per the direction of the Engineer-incharge. |
| 4 | Brick work with K.B. Brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / cm2 with dimensional tolerrance + 8% in cement mortar (1:6) in foundation & plinth. complete as per the Engineer-incharge.a) In foundation and plinth |
| 5 | Cement concrete (1:2:4) with 12mm size black h.g.b. crusher broken chips of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement T&P required etc complete as per the direction of the Engineer-incharge. |
| 6 | Rigid smooth centering & shuttering for R.C.C. works including false work & dismateling then after including cost of materials in ground floor complete an directed by the Engineer-incharge.a) Plinth Bend |
| 7 | Supply, fitting & placing uncoated HYSD Bar reinforcement complete as per drawing & technical specification including cost, taxes, conveyance charges of etc. complete as directed by the Engineer-incharge. |
| 8 | R.C.C. work in C.C. (1:2:4) including hoisting & laying & curring for 28days using 12mm. Size clean black hard granite crusher broken chips of approve quality and from approve quarry including cost taxes conveyance charges of all materials to the worksite with supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge. |
| 9 | 12mm cement plaster in cement mortar (1:6) finished smooth to brick work after racking out joints including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge. |
| 10 | Cement punning over plastering including waterring and curring with cost, taxes, royalty and conveyance charges of all material to the worksite and supply of all labour and T&P required for the work etc complete as directed by the Engineer-incharge. |
| 11 | Finishingoverwall with approve water proofing cement paintincluding cost conveyance charges of materials including supply of labour,etc. required for the work complete as directed by the Engineer-incharge. |
| 12 | Writing charge of required information and data on both side of the transperancy pillar including supplying of approved paints and required material for writing etc. complete as per the direction of the Engineer-incharge. |
| 13 | Distempering 2 coat over a coat of white washing with approve good stone lime and colouring material includingcost conveyance charges of materials includng supply of labour, gum,indigo etc. requiredfor the work complete as directed by the engineer in charge. |
| 14 | M.S. pannel door single leafed with M.S. frame overall size includingframe of height (1.2 x2.0)mt. widthfor door and shutter of 18 gauge CR sheet pannel as per approved size & specification etc. complete including cost of all materials fitting and fixing the door etc. complete as per the direction of the Engineer in charge. |
| 15 | Painting two coat with an approve paint over a coat of prmer over iron work including cost of labour etc. complete as per direction of the Engineer in charge. |
| 16 | Suplying fitting and fixing of sky light of approved quality of size 0.60 mtr. X 0.38 mtr. Made ofcement concrete as per the direction of the Engineer in charge. |
| 17 | Brick work with K.B. Brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / cm2 with dimensional tolerrance + 8% in cement mortar (1:6) insuper structureetc. complete as per the Engineer-incharge. |
| 18 | 25mm thick A.S. flooring with C.C. (1:2:4) using 12mm size black hard granite crusher broken chips of approve quality for approve querry including water and curring with cost taxes royalty and conveyance charges of all material toworksite and supply of all labour and T&P required for the work complete as directed by the Engineer in charge. |
| 19 | 2.5 cm thick grading c.c 1:2:2 on roof slab |
| 20 | Pump chamber wiring with plug and light arrengment |
| 21 | Painting two coat with an approveprimer over iron work including cost of labour etc. complete as per direction of the Engineer in charge. |
| 22 | Fitting of un plasticised all dia meter diaPVC Pipe for all classes including jointing the pipe with solvent cement by non-head application method including fitting and fixing of required no. of PVC Tee for outlet and PVC Shaddle and PVC Riser nipple for fitting air valve, equal Tee etc. including cost of PVC Pipe, cost of Solvent Cement, Transportation of Pipe complete including conveyance pipe from village to worksite and testing of pipe line etc. complete as per the direction of the Engineer-incharge.a) 160mm dia PVC Class-I Pipe |
| 23 | Fitting of un plasticised all dia meter diaPVC Pipe for all classes including jointing the pipe with solvent cement by non-head application method including fitting and fixing of required no. of PVC Tee for outlet and PVC Shaddle and PVC Riser nipple for fitting air valve, equal Tee etc. including cost of PVC Pipe, cost of Solvent Cement, Transportation of Pipe complete including conveyance pipe from village to worksite and testing of pipe line etc. complete as per the direction of the Engineer-incharge.a) 160mm dia PVC Class-II Pipe |
| 24 | Fitting of un plasticised all dia meter diaPVC Pipe for all classes including jointing the pipe with solvent cement by non-head application method including fitting and fixing of required no. of PVC Tee for outlet and PVC Shaddle and PVC Riser nipple for fitting air valve, equal Tee etc. including cost of PVC Pipe, cost of Solvent Cement, Transportation of Pipe complete including conveyance pipe from village to worksite and testing of pipe line etc. complete as per the direction of the Engineer-incharge.b) 200mm dia PVC Class-II Pipe |
| 25 | Filling the foundation and plinth with excavated material as directed by the Engineer-incharge.A) Hard Soil |
| 26 | Earth work in hardinitial lead upto as directed by Engineer in charge. |
| 27 | 12.5/15.00 HP Centrifugal Monoblockpumpset 24mtr. Head to discharge 0.0283 Cumec |
| 28 | Control Panel Board with 12.5 /15.00 HP Starter, 63Amp Main switch,Capacitor including internal wiring |
| 29 | Base frame of motor |
| 30 | 3 x 16mm2 T.P. Cable laying underground including excavation of earth sand filling etc.complete |
| 31 | 100 mmdia. G.I. Pipe |
| 32 | 100mm C.I. Foot Valve |
| 33 | 100 mm dia. G.I.Flange |
| 34 | 100 mmdia. G.I. Bend |
| 35 | 100mm C.I. N.R. Valve |
| 36 | 100mmSluiceValve |
| 37 | Cost ofButterfly Valve |
| 38 | Cost of160 mm dia pvc equal Tee |
| 39 | 50mm C.I. Air Release Valve with saddle,riser pipe,bend etc for proctection tank |
| 40 | Cost of 100X100X25mm G.I. tee, Bend, Bulb Valve for Priming |
| 41 | Cost of 160 X 160 X 110 MMdiaMS / PVC Raiser Tee set with bend closing and opening arrangement |
| 42 | 200 MM x 200 MM X 160 MM dia pvc Tee (4 Kg ) |
| 43 | Out let for T. Tank |
| 44 | Nut bolt & instruction etc |
| 45 | 200 mm dia MS Pipe |
| 46 | 200 mm dia MS Flange |
| 47 | 200 mm dia MS Pipe welding,laying & fitting etc. |
| 48 | 200 mm dia MS Tail Piece |
| 49 | 200mm X100mm dia. M.S. fabricated Reducer |
| 50 | Labour charges for installation of 15HP/10H.P. Motors 1nos. including fitting & fixing of base frame, fitting & fixing suction and delivery pipe to motor, NR Valve, Foot Valve and other fitting materials like nut bolt,leather packing etc with cutting, weldinginluding electricals installation etc. complete as per the direction of the Engineer-incharge. |
| 51 | Cost of digitiliation of pre /post photo,display board in ACP Sheets with informatary information as per RIDF guide line including fixing all. |
| 52 | Supply of small T & P Kit comprising of hand gloves- 1 pair, tester - 1 no, 8 inch cutting plier - 1 no, 12 inch sly wrench -1 no, 12 inch Screw driver - 1no , 24/27 & 21/23 De spanner -2 nos, 24/27 & 21/23 Ring spanner -2 nos (Taparia) |
| 53 | Construction of 3 phase 11 KV Line as per REC standard confirming to RE Rules 1956 with 200Kg. 9 mtrs.long Joist Pole support in 80Mtrs. Span 55 sqm. AAA Conductor, 11 KV \"V\" cross arm with required nos.of 11KV T &C disc.Insulators and 11KV Pin insulator,carping & padding of oles, danger board at each pole,anticlimbing devices. Stay set at each bending Point and double stay at end point with 18mm G.I. H.T. Stay, concreting of stay with anchor plate,guarding at road crossing etc. including cost of materials,labours, transportation, inspection and commissionng etc. complete. |
| 54 | Construction and errection of 11/0.4KV , 25 KVA Pole mounted substation of different capacity confirming to RE Rules 1956 mounted on 2.44mtr. Long structure , supported in 300 Kg 9mtrs. Long Joist Poles, Transformer hard channel and top channel made of 2.8mtrs. long 100X50X6 mm M.S. Channel, Transformer belting on 2.8 mtrs. long 50X50X5 mm M.S. angle (all REC.SPN.Std F-3) with all accessories like3 poles 11 K.V. HG Fuse (F-5) & AB Switches (F-9) both mounted on 2.5 mtrs. long 75X40X6 mm M.S. Channel and supported by 1mtr. long 50X50X5 mm M.S. angle with 3nos. 11 KV lightening Arrestors and distribution box, Pipe earthing(F-2), including cost of 50 sqmm. 3.5 core PVC Cable carping and padding of poles, danger board at each poles, Anti climbing Devices & all other necessary fitting i.e. required size nuts & bolts, brackets Cable sockets etc. including cost of all materials ,Including plith and retaining wall,Barbed Wire fencing,with grill gate, metal spearding etc, labour transportation complete with liasoning for testing inspection & commissioning (A) 25KVA 3 STAR RATED |
| 55 | L.T. Lines 3 Phase 4 wires with .8Mtrs.X200Kg PSC Poles and 3X55 +1X25 mm2 AB Cable(Average Span30mtrs.) |
| 56 | Electrical Earthing |