| 1 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km ST pole SP 23 (bottomPortion hot Dip) |
| 2 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km ST pole SP 21 (bottomPortion hot Dip) |
| 3 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km ST pole SP 10 (bottomPortion hot Dip) |
| 4 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 25 KVA New |
| 5 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 16 KVA New |
| 6 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 65 Km Small materials |
| 7 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 23 (bottomPortion hot Dip) |
| 8 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 21 (bottomPortion hot Dip) |
| 9 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 10 (bottomPortion hot Dip) |
| 10 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 25 KVA New (Upto 1 to 3 Km) |
| 11 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 16 KVA New (upto 1 to 3 Km) |
| 12 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km Small materials (upto 1 to 3 Km) |
| 13 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 10 |
| 14 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 21 |
| 15 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 23 |
| 16 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorDouble Pole Sp 23 |
| 17 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11 KV ACSR weasel |
| 18 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorLT 3 PH 4 wire Weasel / AB cable |
| 19 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorLT 1 PH 2 Wire Weasel / AB Cable |
| 20 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11/0.4 KV 25 KVA New |
| 21 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11/0.4 KV 16 KVA New |
| 22 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 23 pole |
| 23 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole |
| 24 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 10 pole |
| 25 | Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr |
| 26 | Erection of Double Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23. |
| 27 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23. |
| 28 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21 |
| 29 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10 |
| 30 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 23/21 Pole |
| 31 | Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc. |
| 32 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 10 Pole |
| 33 | Fixing, tightening and nozzaling of stay with pole as per RESPO |
| 34 | Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 CuM |
| 35 | Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete |
| 36 | Looping Chooping and cutting of tree which fallen on line |
| 37 | Laying, Resagging & Restringing of L11 KV Line withWeasel conductor complete including fixing of all accessories including binding and jumperingas per RESPO (1 Ph or 3 Ph) |
| 38 | Laying, Resagging & Restringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 3 PH 4 wire Weasel / AB cable |
| 39 | Laying, Resagging & Restringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 1 PH 2 Wire Weasel / AB Cable |
| 40 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 25 KVA New |
| 41 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 16 KVA New |
| 42 | Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 Km 11/0.4 KV 25 KVA New (Upto 1 to 3 Km) |
| 43 | Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 Km 11/0.4 KV 16 KVA New (upto 1 to 3 Km) |
| 44 | Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 KmSmall Material (upto 1 to 3 Km) |
| 45 | Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 25 KVA New |
| 46 | Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 16 KVA New |
| 47 | Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km Small materials |