Power Government Departments Closing in 0 days TDR #30341079

A)Shifting Of New Supplied 200Kva Transformer To Work Spot With Suitable Vehicle/Crane Arrangement Along With Necessary Tools, Tackles And Accessories. B)Disconnecting Of Ht/Lt And Body Ground Connections Of Existing 200 Kva Distribution Transformer At Tc

Issued by Government Departments · , Karnataka
Tender Value
Ref. Documents
Estimated cost
Bid Submission
31 Dec 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
→ Karnataka
EMD Exemption
Not Available
Quantity
Not Available

Project Description

A)Shifting Of New Supplied 200Kva Transformer To Work Spot With Suitable Vehicle/Crane Arrangement Along With Necessary Tools, Tackles And Accessories. B)Disconnecting Of Ht/Lt And Body Ground Connections Of Existing 200 Kva Distribution Transformer At Tc Centre No.5 And Lifting/Shifting It To Kpcl Store Safely. If Any Damage Occurs To Transformer While Releasing And Shifting, The Contractor Has To Rectify At Free Of Cost. C)Erection Of New 200Kva Distribution Transformer With Oil As Per The Technical Specification To Platform Support, Leveling And Anchoring At Tc Centre No.5. Providing Connections To Ht/Lt And Body Ground To Transformer By Providing Suitable Insulation Sleev E. D)It Is The Responsibility Of Contractor To Shift/Erect The New Transformer With All Safety Measures. If Any Damage/Dents/Scratches Occurs To Transformer It Has To Be Rectified Immediately. E)After Erection Of The New Transformer, Testing And Commissioning Has To Be Carried Out By The Contractor. The New Transformer Has To Be In Charged Condition With Specified Lt Voltage Before Handing Over It To Kpcl. F)It Is The Responsibility Of The Contractor To Store The Supplied Materials/ Equipments Till The Completion Of The Work. G)Contractor Has To Take All The Safety Precautions While Executing The Work And To Provide Necessary Safety Equipments And To Ensure Usage By Their Workers Wherever Necessary. He Has To Deploy The Workmen Only After Confirmation Of Line Clearance On 11Kv Ht Line. The Safety Of The Workmen And Timely Completion Of The Work Is The Responsibility Of The Contractor. H)The Scope Of Work Covers Any Other Works/Materials Whether Included Or Not To Complete The Work Of Supply, Erection, Testing & Commissioning Of 01 No. Of New 200 Kva Distribution Transformer At Gerusoppa Project. Supply, Erection, Testing & Commissioning Of 01 No. Of New 200 Kva Distribution Transformer At Gerusoppa Project

AI Tender Summary

OUR REF NO 30341079
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 31-12-2021
Authority
Authority Name Karnataka Power Corporation Limited
Work Description A)Shifting Of New Supplied 200Kva Transformer To Work Spot With Suitable Vehicle/Crane Arrangement Along With Necessary Tools, Tackles And Accessories. B)Disconnecting Of Ht/Lt And Body Ground Connections Of Existing 200 Kva Distribution Transformer At Tc Centre No.5 And Lifting/Shifting It To Kpcl Store Safely. If Any Damage Occurs To Transformer While Releasing And Shifting, The Contractor Has To Rectify At Free Of Cost. C)Erection Of New 200Kva Distribution Transformer With Oil As Per The Technical Specification To Platform Support, Leveling And Anchoring At Tc Centre No.5. Providing Connections To Ht/Lt And Body Ground To Transformer By Providing Suitable Insulation Sleev E. D)It Is The Responsibility Of Contractor To Shift/Erect The New Transformer With All Safety Measures. If Any Damage/Dents/Scratches Occurs To Transformer It Has To Be Rectified Immediately. E)After Erection Of The New Transformer, Testing And Commissioning Has To Be Carried Out By The Contractor. The New Transformer Has To Be In Charged Condition With Specified Lt Voltage Before Handing Over It To Kpcl. F)It Is The Responsibility Of The Contractor To Store The Supplied Materials/ Equipments Till The Completion Of The Work. G)Contractor Has To Take All The Safety Precautions While Executing The Work And To Provide Necessary Safety Equipments And To Ensure Usage By Their Workers Wherever Necessary. He Has To Deploy The Workmen Only After Confirmation Of Line Clearance On 11Kv Ht Line. The Safety Of The Workmen And Timely Completion Of The Work Is The Responsibility Of The Contractor. H)The Scope Of Work Covers Any Other Works/Materials Whether Included Or Not To Complete The Work Of Supply, Erection, Testing & Commissioning Of 01 No. Of New 200 Kva Distribution Transformer At Gerusoppa Project. Supply, Erection, Testing & Commissioning Of 01 No. Of New 200 Kva Distribution Transformer At Gerusoppa Project
Basic Detail
Tender No KPCL/2021-22/EL/WORK_INDENT11757/CALL-3
Bidding Type Tender
Location
City
State Karnataka
Key Dates
Publish Date 17 Dec 2021
Submission Date 31 Dec 2021
Open Date 03 Jan 2022
Finance
Tender Value Ref. Documents
Tender Fee 500
EMD Ref. Documents
Exemption Not Available
Document List
11 section-i general conditions.doc
14-emd declaration annexure k.pdf
03 format of guarantee bond annexure c.pdf
04 format of agreement annexure d.pdf
05 tender acceptance form annexure e.doc
06 e tender conditions annexure f.doc
07 self declaration by bidder annexure g.doc
08 format undrtaking (annexure - i).docx
09 e portal declaration annexure h.docx
10 uploaded documents annexure j.docx
e4de1a81-b5d6-4cef-95ab-4997e3a14de7.html
01-form of bid(annexure - a).doc
02 instructions to bidders annexure b.doc

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 17, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 31, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 03, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
doc

11 section-i general conditions.doc

pdf

14-emd declaration annexure k.pdf

pdf

03 format of guarantee bond annexure c.pdf

pdf

04 format of agreement annexure d.pdf

doc

05 tender acceptance form annexure e.doc

doc

06 e tender conditions annexure f.doc

doc

07 self declaration by bidder annexure g.doc

docx

08 format undrtaking (annexure - i).docx

docx

09 e portal declaration annexure h.docx

docx

10 uploaded documents annexure j.docx

html

e4de1a81-b5d6-4cef-95ab-4997e3a14de7.html

doc

01-form of bid(annexure - a).doc

doc

02 instructions to bidders annexure b.doc

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender