A)Shifting Of New Supplied 200Kva Transformer To Work Spot With Suitable Vehicle/Crane Arrangement Along With Necessary Tools, Tackles And Accessories. B)Disconnecting Of Ht/Lt And Body Ground Connections Of Existing 200 Kva Distribution Transformer At Tc
Tender Overview
Project Description
A)Shifting Of New Supplied 200Kva Transformer To Work Spot With Suitable Vehicle/Crane Arrangement Along With Necessary Tools, Tackles And Accessories. B)Disconnecting Of Ht/Lt And Body Ground Connections Of Existing 200 Kva Distribution Transformer At Tc Centre No.5 And Lifting/Shifting It To Kpcl Store Safely. If Any Damage Occurs To Transformer While Releasing And Shifting, The Contractor Has To Rectify At Free Of Cost. C)Erection Of New 200Kva Distribution Transformer With Oil As Per The Technical Specification To Platform Support, Leveling And Anchoring At Tc Centre No.5. Providing Connections To Ht/Lt And Body Ground To Transformer By Providing Suitable Insulation Sleev E. D)It Is The Responsibility Of Contractor To Shift/Erect The New Transformer With All Safety Measures. If Any Damage/Dents/Scratches Occurs To Transformer It Has To Be Rectified Immediately. E)After Erection Of The New Transformer, Testing And Commissioning Has To Be Carried Out By The Contractor. The New Transformer Has To Be In Charged Condition With Specified Lt Voltage Before Handing Over It To Kpcl. F)It Is The Responsibility Of The Contractor To Store The Supplied Materials/ Equipments Till The Completion Of The Work. G)Contractor Has To Take All The Safety Precautions While Executing The Work And To Provide Necessary Safety Equipments And To Ensure Usage By Their Workers Wherever Necessary. He Has To Deploy The Workmen Only After Confirmation Of Line Clearance On 11Kv Ht Line. The Safety Of The Workmen And Timely Completion Of The Work Is The Responsibility Of The Contractor. H)The Scope Of Work Covers Any Other Works/Materials Whether Included Or Not To Complete The Work Of Supply, Erection, Testing & Commissioning Of 01 No. Of New 200 Kva Distribution Transformer At Gerusoppa Project. Supply, Erection, Testing & Commissioning Of 01 No. Of New 200 Kva Distribution Transformer At Gerusoppa Project
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender