S M S Hospital has published Execution Of Clubbed Up 04Nos Of Rpws Schemes To Village Khalapada Tukpalsia Jamusole And Gandigodha In Gadia Palasmunduli And Sureidihi Gp Under Morada Block Ombadc Execution Of Clubbed Up 04Nos Of Rpws Schemes To Village Khalapada Tukpalsia Jamusole And. Submission Date for this Tender is 03-01-2022. Water Supply Project Tenders in Baripada Odisha. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Dec-2021 | Addendum | Technical Bid | 03-01-2022 |
2 | 28-Dec-2021 | Corrigendum | Financial Bid | 03-01-2022 |
Sl. No. | Item Description |
1 | Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village KHALAPADA All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system . |
2 | Design, drawing, constuction errection, testing and commissioning of 40000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with speherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. Village KHALAPADA |
3 | The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5. Village KHALAPADA |
4 | Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village JAMSOLE All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system . |
5 | Design, drawing, constuction errection, testing and commissioning of40000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir (Circular type with speherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge.Village JAMSOLE |
6 | The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5. Village JAMSOLE |
7 | Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village GANDIGODHA All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system . |
8 | Design, drawing, constuction errection, testing and commissioning of30000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir (Circular type with speherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. Village GANDIGODHA |
9 | The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5. Village GANDIGODHA |
10 | Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to G) of Village TUKPALSIA All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge . The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system . |
11 | Design, drawing, constuction errection, testing and commissioning of50000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir (Circular type with speherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - E including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. Village TUKPALSIA |
12 | The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5. Village TUKPALSIA |