Construction Of Floating Jetty And Allied Infrastructure For The Cage Culture Project At Hirakud, Part-I (Land Ward Facility) Civil Works, HIRAKUD IN SAMBALPUR DISTRICT-Odisha

Department Of Ports And Inland Water Transport has published Construction Of Floating Jetty And Allied Infrastructure For The Cage Culture Project At Hirakud, Part-I (Land Ward Facility) Civil Works. Submission Date for this Tender is 03-01-2022. Jetty Tenders in HIRAKUD IN SAMBALPUR DISTRICT Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

30329373
Construction Of Floating Jetty And Allied Infrastructure For The Cage Culture Project At Hirakud, Part-I (Land Ward Facility) Civil Works
National Competitive Bid
Indian
Odisha
HIRAKUD IN SAMBALPUR DISTRICT
03-01-2022

Tender Details

Construction Of Floating Jetty And Allied Infrastructure For The Cage Culture Project At Hirakud, Part-I (Land Ward Facility) Civil Works

Key Value

Document Fees
INR 10000 /-
EMD
Refer document
Tender Value
INR 86.69 Lakhs /-

BOQ Items

Name of Work: Construction of Floating Jetty and Allied Infrastructure for the Cage Culture Project at Hirakud, Part-1 (Land ward facility)
Sl. No. Item Description
1Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&Prequired for the work etc. complete in all respectas directed by the Engineer-In-Charge.
2Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metresincluding cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&Prequired for the work etc. complete in all respectas directed by the Engineer-In-Charge. A. Formation Proper - 1,08,656.23 Cum. B. Approach Road connecting Dyke & Vailly Road- 730 M. 16,360.00 Cum. Total. 1,25,016.23 Cum.
3Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2including cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&Prequired for the work etc. complete in all respectas directed by the Engineer-In-Charge.
4Providing & laying sub-base in layers not exceeding 225mm watering and compaction to the required density in O.M.C with Vibratory Roller but excluding cost and conveyance of sub base materialsincluding cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&Prequired for the work etc. complete in all respectas directed by the Engineer-In-Charge.
5Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works (4th Revision). Grade-IIincluding cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&Prequired for the work etc. complete in all respectas directed by the Engineer-In-Charge.
6Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works (4th Revision). Grade-IIIincluding cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&Prequired for the work etc. complete in all respectas directed by the Engineer-In-Charge.
7Providing, Supplying, gabbion box of size (1 x 1 x 1) M of pre fabricated collapsable from with a bottom and four sides held together by appropriate binding and with a flipp open top lead the gabion box approved by the Departmental made out of 9MM Flexible Rope having unit out of 45 gm / rmt with a tolerance of +8%. The main operationing size shall be (100 x 100)mm. The 10MM Rope not shall have the breaking strangth of 98KN and the rope net shall have the adequately U.V. Stabilized. The structure of the rope shall be 3 stand lower laid. The construction of the net shall woven joints the intersection of the rope and the gabion box will be filled with 25 to 100 kg H.G. Stone boulder size and packing interstics properly. Rehandling packed gabion units with in one Km lead by using 8 Tone capacity wheel mounted mobile crane and tractor or any otherincluding cost, conveyance, royalties, taxes of all materials, cost of all labour, labour cess, T&Prequired for the work etc. complete in all respectas directed by the Engineer-In-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail