Name of Work:Reconstruction of fencing around Govt. school Hafrada Pyt:Hafrada Block Tarathpora Under Capex Budget (PRIS) 2021-22 Adv cost :8.00lacs
Sl. No.
Item Description
1
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:in all kinds if soils
2
Providing and laying of drystone soling (hand packed tightly ) including all carriages of Material upto site of work complete Job by MT as well as HL
3
P/L in position specified grade e includingcuring but excluding the cost of centering and shuttering, finishig and reinforcement All work upto plinth level with 1:5:10(1cement:5coarse sand : 10graded stone agg. 40 mm size ) including all carriages by MT as wellas HL of material up to site of Work Complete job.
4
Demolishing old damaged brick work manually/mechanical meansin cement mortar including stacking of serviceable material & disposal of unserviceable material within 50mtr lead.as per the direction of Engineer incharge
5
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size),including all carriages by MT as wellas HL of material up to site of work complete job.
6
P/L 40mm thick cement concrete coping in 1:2:4 mix incluidng all carriages by MT as well as H/L
7
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand)includingall carriages as well as H/L
8
Extra for brick work with common burnt clay bricks in superstructure above plinth level upto floor five level incl all carriages
9
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns with all carriages of material by MT as well as HL up to site of work Complete job
10
Labour charges for available brick work got from dismantling in 1:6 mix
11
Removingof mortar from bricks including stackingwithin a lead of 50mtr ( bricks from cement mortar)
12
Structural steel work welded in built upsection in framed worksuch asgates ,ladder etc including cutting, hoisting, fixing in position and applying a primingtwo coat of steel paint
13
Providing and fixing of Community Inforamation board (CIB)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.