|
| 1 | Earth work excavation in hard /gravely soil including 50m initial lead& 5m lift initial lift including all labour etc complete |
| 2 | Filling sand in F&P including watering ramming with all cost & convayance and royality etc complete. |
| 3 | Filling F&P with excavated material including cost of materials labour etc.Complete in allrespect. |
| 4 | C.C (1:3:6) using 40 mm size crusher broken granite metal including watering curing with all cost & conveynce and royality etc complete. |
| 5 | FLY ASH BRICKmasonary in C M (1:6) in Foundation & Plinth including watering curing with all cost & convayance and royality etc complete. |
| 6 | Foundation & Plinth |
| 7 | super structure |
| 8 | R C C M20 using 20mm&10mm crusher broken chipsincluding centering shuttering watering curing with all cost & convayance and royality etc complete but excluding M S ROD etc. |
| 9 | Column base |
| 10 | Plinth bend |
| 11 | Column & Beam |
| 12 | Col up to 3m ht |
| 13 | Lintel |
| 14 | Roof slab Gr Floor |
| 15 | Labour for cutting bending binding and tying the rod in position including all costs of binding wire & M S rod and labour etc. |
| 16 | GR Floor |
| 17 | 12mm thick cement plaster in C M (1:6)over brick work including curing watering with all cost & conveynce and royality etc complete. |
| 18 | Upto 3Mt. Ht. |
| 19 | 6mm cement plaster in C.M (1:4) over R.C.C work including curing watering with all cost & coveynce and royality etc complete. |
| 20 | C.C (1:2:4) using 12mm size crusher broken granite metal including watering curing with all cost & convayance and royality etc complete. |
| 21 | Supplying, fitting & fixing vetrifed tile in floors of size 600mm x 600mm of approved make with application of polimer modified cement based etc. complete. |
| 22 | Supplying & fitting fixingof M S Rolling shutter with hood cover, Bearing fixing in position etc complete. |
| 23 | 20mm thick grading plaster in C.M (1:4) over Roof Slab including curing wateringwith all cost & conveynce and royality etc complete. |
| 24 | GR Floor |
| 25 | Finishing wall surface of walls with Acrylic wall putty (water based) of approved make & finished smooth & even surface to receive painting including cost |
| 26 | Wall painting two coats with plastic emulsion paint of approved shade on new work to give an even shed. |
| 27 | Wall painting two coats with weather coat painting of approved shade on new work to give an even shed. |
| 28 | Painting two coats with approved enamel paint over one coat of primingincluding all cost and labour etc complete. |
| 29 | Supplying, fitting, fixing up window (sliding type) made up aluminium section 151 - 154, 151 - 155, 151 - 153 and 151 - 167 as shutter frame with 5mm thick black glass as penal fitted with rubber beading including locking arrangement including all fitting, cost of materials all taxes etc. complete as per direction of EIC. |
| 30 | Electrification fittings |
| 31 | Sanitary Fittings |