02 / 2021-22 Maintenance Of Rwss To Pallichal ( Thannivila Zone ) - Rectification Of Leakagesinvarious Pipelines Andalliedworks-One Yearrcfor2021- 2022
Tender Value
11.62 Lakhs
Estimated cost
Bid Submission
20 Dec 2021
0 days left
EMD
29500
Bank guarantee accepted
Document Fee
2500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kanjiramkulam → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
02 / 2021-22 Maintenance Of Rwss To Pallichal ( Thannivila Zone ) - Rectification Of Leakagesinvarious Pipelines Andalliedworks-One Yearrcfor2021- 2022
BOQ
| Sl. No. | Item Description |
| 1 | APP: A: AC pipe leak |
| 2 | Repairing leakage/breakage of 80 mm ACpipe line by cutting and dismantling the damaged pipe portion (up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valvesif any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 3 | Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints. |
| 4 | Repairing leakage/breakage of 150 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 5 | Repairing leakage/breakage of 80 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 6 | Repairing leakage/breakage of 100 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 7 | Repairing leakage/breakage of 150 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 8 | Repairing leakage/breakage of 80 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 5.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 9 | Repairing leakage/breakage of 100 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 5.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 10 | Repairing leakage/breakage of 150 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 5.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 11 | APP:B : PVC pipe leak |
| 12 | Leak rectification work in 32 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 13 | Leak rectification work in 40 mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 14 | Leak rectification work in 50 mmPVC (Class 2 to 6) pipe line including detectingand locating leak,earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 15 | Leak rectification work in 63 mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 16 | Leak rectification work in 75 mmPVC (Class 2 to 6) pipe line including detectingand locating leak,earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 17 | Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 18 | Leak rectification work in 90mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing. |
| 19 | Leak rectification work in 160mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing. |
| 20 | APP: C: GI pipe leak |
| 21 | Rectification of leakages of 32 mm, 40mm & 50mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete. |
| 22 | Rectification of leakages of 65 mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete. |
| 23 | Rectification of leakages of 80 mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete. |
| 24 | Rectification of joint leakages in 300mm DI Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost ofmechanical joint and as per the direction of departmental officers etc. complete. |
| 25 | APP: D: Public tap leakages |
| 26 | Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting,cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost ofpipe and specials and as per the direction of departmental officers etc. complete. |
| 27 | Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete. |
| 28 | Supplying andfixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for toolsand as per the direction of the department officers etc complete. |
| 29 | APP: E: Miscellaneous Items |
| 30 | Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns,disposing the the slurry / waste materilas away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the exististing strucutre and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. |
| 31 | Leak rectification work in allclasses and all sizes ofAC/GI/CI/DI pipes and 75 mm and above PVC pipes of all classesincluding detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting, concrete cutting, rectifying leakage with saddle piece and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20 cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of departmental officers including the cost of PVC/MS/GI saddle piece. Saddle piece shall be of good quality and conforming to relevant standards: Providing Saddle piece Details of Cost for Rectification of One Leak. |
| 32 | Charges for cleaning valve chamber and protection tube after dismantling the heavy type RCCcover slab and disposing the slushy soil 50 mt away from the chamber |
| 33 | Charges for dismantling 150 mm 350 mm CI valve, lock nut, spindle, shutter, welding the shutter increasing the thickness of the spindle suitable for the valve and making new lock nut and charges for lath work and resetting the same in correct position etc complete. |
| 34 | Charges for dismantling 80mm 125 mm CI valve, lock nut, spindle, shutter, welding the shutter increasing the thickness of the spindle suitable for the valve and making new lock nut and charges for lath work and resetting the same in correct position etc complete. |
| 35 | Rectification the leakage in various size of valves in the distribution line and pumping main including hire for tools etc. complete including cost of specials. |
| 36 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil (Ref. Item No. 2.10.1 of DSR) |
| 37 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 38 | Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. |
| 39 | Demolishing the existing RR masonry for the rectification of leakages if necessary and reconstruction of the same in C.M. 1:6 after the rectification work including cost of cement etc complete. |
| 40 | Supply ,stacking,spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading ,unloading & stacking up to any lead. |
| 41 | Supply ,stacking,spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading ,unloading & stacking up to any lead. |
| 42 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 43 | Disconnectingwaterconnection from service mains along Concrete roadwithout causing any damage to the existing lineincluding charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost ofmaterials and as per the direction of departmental officers etc. complete. |
| 44 | Disconnection/re connection of water connection exposed portion of service line including cost of all labour charges and necessary specials etc complete as per the direction of departmental officers. |
| 45 | Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009) |
| 46 | APP: F Supply of materials |
| 47 | Supplying of 150mm CID |
| 48 | Supplying 100 mm CID joint all class |
| 49 | Supplying 80 mm CID joint all class |
| 50 | Supplying 160 mm CIR joint all class |
| 51 | Supplying 90 mm CIR joint |
| 52 | Supply of uPVC Pipe, IS 4985:2000 , 6kg/cm2, 90mm Dia. |
| 53 | Supply of uPVC Pipe, IS 4985:2000 , 6kg/cm2, 110mm Dia. |
| 54 | Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 160mm Dia. |
| 55 | Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 200mm Dia. |
| 56 | Supply of PVC Coupling 90mm, 8 kg/cm2 |
| 57 | PVC Coupling 110mm, 8 kg/cm2 |
| 58 | Supply of PVC Coupling 160mm, 8 kg/cm2 |
| 59 | Labour engaged for valve controlling |
| 60 | Engaging Coolie |
AI Tender Summary
Tender Timeline
Dec 13, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedDec 20, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 22, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender