Installation Of Alloy Wire Rod Manufacturing Installation Of Alloy Wire Rod Manufacturing , Sp - 1 , Supply Of Plant &Equipment / Materials / Technological Structures Including Design & Engineering , Mechanical Equipment ( Including Technological Structures ) Incl. Commissioning Spares, Initial Fills Etc. , Electricalequipment / Systemsincl. Commissioning Spares, Initial Fills Etc. , Instrumentation, Automation, Telecommunication Systems, Cabling Etc. Incl. Commissioning Spares, Initial Fills Etc. , Mandatory Spares , Special Tools & Tackles , Any Other Item Not Covered Above But Required For The Completion Of Work. , Sp - 2 , Installationandcommissioning: Carrying Out All Site Activities Including But Not Limited To Supervision, Prefabrication, Fabrication, Erection, Construction, Installation, Testing, Precommissioning, Mechanical Completion, Startup, Commissioning And Conducting Pgtr, For Completing And Establishing The Entire Wire Rod Casting Cum Rolling Mill Package Under Contractor’Sscope As A Fully Functional And Operative Unit, Including ( But Notlimited To ) Providing All Labour And Manpower, Resources, Transportation, Unloading At Site, Stores Management, Construction Equipment, Tools, Tackles And Aids, Safety Devices, Testing Devices, Insurance, Facilities, Utilities, Communicationsystems, Materialand Other Reconciliations, Handing Over Of Final Drawings / Documents / Manuals, Obtaining And Satisfying All Statutory Licenses, Clearances, Consents, Noobjections, Approvals And Certificates And Complying With All Statutory Formalities Etc.And All Other Services Whatsoever Required Including Training, For Completing The Works In All Respects Of The Wire Rod Casting Cum Rolling Mill Package In Accordance With The Bidding Document And Direction Of Engineer-Incharge. , Mechanical Equipment , Electrical Equipment , Instrumentation, Automation, Telecommunication Systems, Cabling Etc. , Technological Structures , Any Other Activity Not Covered Above But Required For Completion Of The Work