Heavey Water Board-HWB has published Maintenance Contract For Insulation Work On Towers, Tanks, Exchangers And Pipelines Etc During Mta-22 At Hwpk Site Maintenance Contract For Insulation Work On Towers, Tanks, Exchangers And Pipelines Etc During Mta-22 At Hwpk Site. Submission Date for this Tender is 28-12-2021. Insulation work Tenders in HWPK Rajasthan. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | HOT INSULATION WITH ALUMINIUM SHEETS: Supply & application of hot insulation on Heat exchangers, Tanks, Towers, Piping etc. Cleaning the surfaces of the item (i.e. heat exchangers, tanks, piping to be taken up for insulation, Wherever required, the existing damaged insulation to be removed before cleaning), Providing and application of one coat of Red Oxide Zinc Chrome primer paint or heat resistant paint on CS and Aluminum foil of 0.05 mm on SS.Providing and fixing of MS Flat (18 mm width x 3mm thickness) as spacer rings / supporting rings lugs at 900 mm equal distance. Chlorine content should not Exceed 35 PPM Supply and application of tested hot insulation mattresses of Lightly Resin Bonded Rock Wool mattresses with additional 3/4" x 22 SWG soft GI Hexagonal wire netting (other than OEM supply). Density of LRB mattress shall be 81-120 Kg/M3 as per group 3 of IS 8183 and thickness as mentioned below as per requirement.Providing and fixing of GI stitching & binding wire, rivets nuts and bolts for supporting, asbestos mill board small pieces having 2 to 3 mm thickness for use between lugs and support rings. Providing and fixing of Aluminum sheets (over wool mattress) in thickness of20 SWG (0.91 mm) and 22 SWG(0.71) by sealing the joint with Tar Felt sheet 3 mm thick on LRB insulationwith screws and water proof sealing compound from outside. Application of hot insulation as per above details. Wherever required, temporary scaffoldings/Winch or platforms are to be made by successful bidder. The work shall require LRB mattresses in following thickness:- |
2 | 100mm thick with 20 SWG Aluminum sheet |
3 | 100 mm thickwith Cement & fluff on bottom dished ends of XU towers |
4 | 75 mm thick with 20 SWG Aluminum sheet |
5 | 60 mm thickwith 20 SWG Aluminum sheet |
6 | 50 mm thick with 22 SWG Aluminum sheet |
7 | 25 mm thick with 22 SWG Aluminum sheet |
8 | Supply and application of cold insulation (Thermocol) on piping, pipe fitting and equipments in HWPK site. Cleaning of surfaces pipes, equipments which are to be taken for insulation. Supply and application of one coat of red oxide zinc chrome primer paint followed by two coat of cold setting bitumen compound providing and fixing of Thermocol and sealing of joints by vapour sealing bitumen compound. Application of ¾”x22SWG MS wire meshes over a Thermocol than cement layer of 12 mm thickness. Thermocol density shall not less than 20kg/m3.Whenever required temporary scaffolding shall be made by successful bidder. The work shall require Thermocol in following thickness. |
9 | 50 mm thick Insulation |
10 | Removal of existing of LRB mineral wool /PUF/Thermocol from various equipment and piping in thickness ranging from 25mm to 100mm.the removal LRB mineral wool, PUF, Thermocol ,cement plaster and Al sheet shall be separate out. The mineral wool/PUF/Thermocol and cement plaster shall be disposed at designated place as per the instruction of EIC and the Al sheets shall be deposited to the central store. Whenever required temporary scaffolding shall be made by contractor. |