| 1 | Earthwork excavation in all classes of soil, rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OFRETAINING WALL. as per section 300 MORT&H Specifications (V Revision). |
| 2 | Plain cement Concrete of Grade M-10, Nominal Mix, 1:3:6,using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW THE FOOTINGS OF RCC RETAINING WALLS. as per section 1100 of MORT&H Specifications (V Revision). |
| 3 | VibratedReinforced Cement Concrete of grade M35 (Design mix)using 20mm ISS graded metal including cost and conveyance of all materials and cost of cementat sitebut excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete. working at depth, hire charges for tools and plants, including all other incidental charges, etc.for FOOTING OF RCC RETAINING WALL as per section 1100, 1500 & 1700 of MORT&H Specifications (V Revision). |
| 4 | VibratedReinforced Cement Concrete of grade M35 (Design mix)using 20mm ISS graded metal including cost and conveyance of all materials and cost of cementat sitebut excluding cost and fabrication of steel but including soft water, labour charges for mixing, transporting, laying and curing concrete. working at height hire charges for tools and plants, including all other incidental charges, etc.for STEM OF RCC RETAINING WALL as per section 1100, 1500 & 1700 of MORT&H Specifications (V Revision). |
| 5 | Vibrated Reinforced Cement Concrete M40 (Design Mix) using 20mm ISS HBG metal as the max. size of coarse aggregate, as including cost and conveyance of all materials to site andcost of cementat site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete. working at heights, potable water, hire charges, for tools and plants, including all other incidental charges, etc.,complete for CRASH BARRIERS as per 811,1700 & 2703.3 of MORT&H Specifications (V Revision). |
| 6 | Providing and CLASS 1 PVC SEEPAGE PIPES of 100mm dia.of required lengths for abutments and returns including costs and conveyanace of all materials to work site and labour charges for fixing etc., complete to drain of the backfill as per section 2706 of MORT&H specifications (V revision) |
| 7 | Supply and fabrication of Fe-500steelrequired for all RCC items of works involved in the schedule cost of steel at site cost of fabrication, Anticorrosive treatment with fusion bonded epoxy coating, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and providing to reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, as per section 1600 of MORT&H Specifications (V Revision). |
| 8 | Providing FILTER MEDIA behind the abutments and returns for 600mm thickness using filter material to clause 309.3.2.B of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to work site includingall labours and other incidental charges including complete as per Cl. 710.1.4 & Appendix 6 of IRC: 78-2014. |
| 9 | Painitng two coats with ready mix plastic emulsion paint with approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts including cost and conveyance of all materials to site, all labour for cleaning the surface,painting including form work for working in heights and all other incidental charges etc.,complete. |
| 10 | Painitng two coats with ready mix plastic enamel paint with approved colour including priming coat over the cement surface complete including scrapping clean removal of dirt of parts including cost and conveyance of all materials to site, all labour for cleaning the surface,paintingand all other incidental charges etc.,complete. |
| 11 | Sub Total Amount for above all items (excluding GST) |
| 12 | GST 12% for above SubTotal Amount |
| 13 | Total in Figures (SubTotal + GST) |