|
| 1 | LEVEL MEASURING INSTRUMENTS |
| 2 | (a)Removing of Level Gauges (Pr. Rating < 40 Kg/cm2) |
| 3 | Fixing of Level Gauges (Pr. Rating < 40 Kg/cm2) |
| 4 | Removing of Level Gauges (Pr. Rating > 40 Kg/cm2) |
| 5 | Fixing of Level Gauges (Pr. Rating > 40 Kg/cm2) |
| 6 | Removing of Level Switches (Pr. Rating < 40 Kg/cm2) |
| 7 | Fixing of Level Switches (Pr. Rating < 40 Kg/cm2) |
| 8 | Removing of Level Switches (Pr. Rating > 40 Kg/cm2) |
| 9 | Fixing of Level Switches (Pr. Rating > 40 Kg/cm2) |
| 10 | Removing ofLevel Troll (Pr. Rating < 40 Kg/cm2) |
| 11 | Fixing ofLevel Troll (Pr. Rating < 40 Kg/cm2) |
| 12 | Removing ofLevel Ttroll (Pr. Rating > 40 Kg/cm2) |
| 13 | Fixing ofLevel Troll (Pr. Rating > 40 Kg/cm2) |
| 14 | Removing of Level Controller (Local) / Transmitter |
| 15 | Fixing of Level Controller (Local) / Transmitter |
| 16 | Removing of Level Transmitters (Purge type) |
| 17 | Fixing of Level Transmitters (Purge type) |
| 18 | Removing of Level DP Transmitter with / without capillary |
| 19 | Fixing of Level DP Transmitter with / without capillary |
| 20 | Removing of Ultrasonic/ Radar/ Capacitance type Level Transmitter with accessories |
| 21 | Fixing of Ultrasonic/ Radar/ Capacitance type Level Transmitter with accessories |
| 22 | Level Gauge Module removal (On line) for High Pressure Gauges |
| 23 | Level Gauge Module fixation (On line) for High Pressure Gauges |
| 24 | Removal of Electrode of Hydrastep (L.G) |
| 25 | Fixation of Electrode of Hydrastep (L.G) |
| 26 | Assistance in removal of Nuclear type Level Instt. |
| 27 | Assistance in fixing of Nuclear type Level Instt. |
| 28 | Removal of Local Float & Rope type Indicaters |
| 29 | Fixation of Local Float & Rope type Indicaters |
| 30 | Removal & cleaning of Purge tube/ Dip tube of Level Transmitter |
| 31 | Fixation of Purge tube/ Dip tube after cleaning |
| 32 | Changing of Gauge glass/ mica sheet/ gaskets of LGs |
| 33 | PRESSURE MEASURING INSTRUMENTS |
| 34 | Removing of Pressure Gauges (Ordinary) (all sizes & ratings) |
| 35 | Fixing of Pressure Gauges (Ordinary) (all sizes & ratings) |
| 36 | Removing of Seal Diaphram Pressure Gauges (without capillary) (all sizes & ratings) |
| 37 | Fixation of Seal Diaphram Pressure Gauges (without capillary) (all sizes & ratings) |
| 38 | Removing of Seal Diaphram Pressure Gauges (with capillary) (all sizes & ratings) |
| 39 | Fixation of Seal Diaphram Pressure Gauges (with capillary) (all sizes & ratings) |
| 40 | Removing of Pressure Switches all types/sizes |
| 41 | Fixing of Pressure Switches all types/sizes |
| 42 | Removing of Electronic/ Pneumatic Pressure Transmitters (without capillary) (all sizes & ratings) |
| 43 | Fixing of Electronic/ Pneumatic Pressure Transmitters (without capillary) (all sizes & ratings) |
| 44 | Removing of Electronic/ Pneumatic Pressure Transmitter/ Diff. Pressure Transmitter (with capillary) (all sizes & ratings) |
| 45 | Fixing of Electronic/ Pneumatic Pressure Transmitter/ Diff. Pressure Transmitter (with capillary) (all sizes & ratings) |
| 46 | Removing of Pr.Controller (Electronic) (Local panel mounted) |
| 47 | Fixing of Pr.Controller (Electronic) (Local panel mounted) |
| 48 | Removing of Air Pr. Regulators -Any size/rating |
| 49 | Fixingof Air Pr. Regulators -Any size/rating |
| 50 | Removing of Pressure Transmitter (Lens gasket) (Electronic/ Pneumatic) with capillary |
| 51 | Fixing of Pressure Transmitter (Lens gasket) (Electronic/ Pneumatic) with capillary |
| 52 | FLOW MEASURING INSTRUMENTS |
| 53 | Removing of Purge / On-line Rotameters of all sizes/ ratings |
| 54 | Fixing of Purge/ On-line Rotameters of all sizes/ ratings |
| 55 | Removing of DP type Flowmeter - Electronic/ Pneumatic (without Seal) |
| 56 | Fixing of DP type Flowmeter - Electronic/ Pneumatic (without Seal) |
| 57 | Removing of DP type Flowmeter - Electronic/ Pneumatic (with Seal) |
| 58 | Fixing of DP type Flowmeter - Electronic/ Pneumatic (with Seal) |
| 59 | Removal of Turbine Flowmeter |
| 60 | Fixingof Turbine Flowmeter |
| 61 | Removal of Ovalgear type / Mass Flowmeter |
| 62 | Fixingof Ovalgear type / Mass Flowmeter |
| 63 | Removal of Electro Magnetic type Flowmeter |
| 64 | Fixingof Electro Magnetic type Flowmeter |
| 65 | Removing of DPI / DP type Local Flowmeter |
| 66 | Fixing of DPI / DP type Local Flowmeter |
| 67 | Removing of Pitot Tube/ Annubar of any size/rating |
| 68 | Fixing of Pitot Tube/ Annubar of any size/rating |
| 69 | Removing of Flow Switches for line size upto 2\" |
| 70 | Fixing of Flow Switches for line size upto 2\" |
| 71 | Removing of Flow Switches for line size > 2\" |
| 72 | Fixing of Flow Switches for line size > 2\" |
| 73 | Removing of Recorder from Local/CCR Panel |
| 74 | Fixing of Recorder from Local/CCR Panel |
| 75 | TEMPERATURE MEASURING INSTRUMENTS |
| 76 | Removing of the Thermo-Couple/ RTD Elements (Single, Duplex, Triplex) including elecrical termination |
| 77 | Fixing of the Thermo-Couple/ RTD Elements (Single, Duplex, Triplex) including electrical termination |
| 78 | Removing of the Temperature Recorder/ Indicator/ Monitor from Panel |
| 79 | Fixing of the Temperature Recorder/ Indicator/ Monitor from Panel |
| 80 | Removing of Local Temperature Gauge (Bimettalic/ Filled) with mounting |
| 81 | Fixing of Local Temperature Gauge (Bimettalic/ Filled) with mounting |
| 82 | Removing of Temperature Switch including Electrical termination |
| 83 | Fixing of Temperature Switch including Electrical termination |
| 84 | Removing of Capillary filled type local Temperature Gauge with mounting |
| 85 | Fixing of Capillary filled type local Temperature Gauge with mounting |
| 86 | Removal of Thermowell of all sizes & ratings |
| 87 | Fixingof Thermowell of all sizes & ratings |
| 88 | ANALYSERS |
| 89 | Removing and cleaning of Water Analysers (pH, Conductivity, Residual Chlorine) including asssociated accessories |
| 90 | Fixing back of Water Analysers (pH, Conductivity, Residual Chlorine) including asssociated accessories |
| 91 | Removing and cleaning of the Gas Analysers (CO, CO2, Methane, NH3, O2, H2, etc.) including accessories |
| 92 | Fixing of the Gas Analysers (CO, CO2, Methane, NH3, O2, H2, etc.) including accessories |
| 93 | Removal and cleaning of Chlorine Detectors including accessories |
| 94 | Fixing of Chlorine Analyser Detectors including accessories |
| 95 | Removal and cleaning of Chlorine Ejector |
| 96 | Fixing of Chlorine Ejector |
| 97 | Removal and cleaning of Chlorine Regulator |
| 98 | Fixing of Chlorine Regulator |
| 99 | Removing, cleaning & tightening of Water Analyser sampling system components |
| 100 | Removing and cleaning of pH Analyser filters & fixing them back |
| 101 | Removing of Calibration Gas cylinders with regulators & connections |
| 102 | Fixing of Calibration Gas cylinders with regulators & connections |
| 103 | Removing of Gas Regulators from Gas Cylinders |
| 104 | Fixing of Gas Regulators from Gas Cylinders |
| 105 | Removal of damaged Sample Cooling Coil, Repair/ Fabrication of new coil from 6mm SS Tube & mounting of same in sample cooler |
| 106 | IMPULSE LINE PIPING FOR TRANSMITTERS |
| 107 | Laying, Fabrication, Erection & Testing including required Cutting, Fitting & Welding jobs for following Pipe size/rating: |
| 108 | Size 1/2\" Carbon Steel, Non IBR Sch 40 |
| 109 | Size 1/2\" Carbon Steel, Non IBR Sch 80 |
| 110 | Size 1/2\" Carbon Steel, Non IBR Sch 160 |
| 111 | Size 1/2\" Stainless Steel, Non IBR Sch 40/80 |
| 112 | Size 1/2\" Stainless Steel, Non IBR Sch 160 |
| 113 | Size 1/2\" Alloy Steel, Non IBR Sch 40 |
| 114 | Size 1/2\" Alloy Steel, Non IBR Sch 80 |
| 115 | Size 1/2\" Alloy Steel, Non IBR Sch 160 |
| 116 | Size 1/2\" Alloy Steel, IBR Sch 40 |
| 117 | Size 1/2\" Alloy Steel, IBR Sch 80 |
| 118 | Size 1/2\" Alloy Steel, IBR Sch 160 |
| 119 | Size 1\" Carbon Steel, Non IBR Sch 40/80 |
| 120 | Size 1\" Stainless Steel, Non IBR Sch 40/80 |
| 121 | Size 2\" Carbon Steel, Non IBR Sch 40/80 |
| 122 | Size 2\" Stainless Steel, Non IBR Sch 40/80 |
| 123 | Removal of Pipingwith supports including cutting for all sizes irrespective of pipe material & rating |
| 124 | Laying & testing of GI Pipe including cutting, fitting & welding jobs for following pipe sizes: |
| 125 | SIZE 1/2\" |
| 126 | SIZE 1\" |
| 127 | SIZE 2\" |
| 128 | Removal of GI Pipe with supports including cutting for all sizes |
| 129 | Arrest the leakage of a joint by welding/ rewelding of joint/ welding of crack or broken parts |
| 130 | For Carbon Steel material & all rating |
| 131 | For Stainless Steel material & all rating |
| 132 | Removal of Condensate Pots including related cutting |
| 133 | Fixing of Condensate Pots including cutting & welding |
| 134 | Fabrication & installation of Float guide upto 4\" pipe |
| 135 | TUBING JOBS (including connections & testing) |
| 136 | Size 6mm S.S./ Copper Tube laying |
| 137 | Size 6mm S.S./ Copper Tube removing |
| 138 | Size 8mm S.S./ Copper Tube laying |
| 139 | Size 8mm S.S./ Copper Tube removing |
| 140 | Size 10mm S.S./ Copper Tube laying |
| 141 | Size 10mm S.S./ Copper Tube removing |
| 142 | Size 12mm S.S./ Copper Tube laying |
| 143 | Size 12mm S.S./ Copper Tube removing |
| 144 | CABLING JOBS: Cable laying on Cable Tray/ Trench/ Conduits, Glanding, Termination & checking of cables for Loop continuity. Removing of Cables from Cable Trays/ Trench/ Conduits including Electrical Terminations and storing them with proper marking. Cable types: Signal, Power, Control, Thermocouple, RTD Cables- conductor size =<0.5mm2 (armoured/unarmoured) |
| 145 | Laying of Cable, 2 core To 6 core |
| 146 | Removing of Cable, 2 core To 6 core |
| 147 | Laying of Cable, 7 core To 24 core |
| 148 | Removing of Cable 7 core To 24 core |
| 149 | Fixing of Junction Box complete with accessories (Area<=500 cm2) |
| 150 | Removal of Junction Box disconnecting electrical cables (Area<=500 cm2) |
| 151 | Fixing of Junction Box complete with accessories (Area>500 cm2) |
| 152 | Removal of Junction Box disconnecting electrical cables (Area>500 cm2) |
| 153 | Digging 300mm wide 0.5 m deep trench, laying of bricks & filling back with sand/earth after laying the cable |
| 154 | Laying conduit/GI pipe=<2\"through the trench 300mmwide 0.5m deep |
| 155 | Dressing of the Cables (2 to 24 core) with proper clamping |
| 156 | Removal of Broken Bolts of JB Covers & fixing new bolts. |
| 157 | Replacement of Cable gland/ Pipe fitting/ Tube fitting, where cable laying/ pipe laying/ tube laying is not desired. Size upto 2\" and all rating & material. |
| 158 | TRAY & OTHER MISC. JOBS Tray/ Angle Iron laying (for tubing/cables) fixing of supports - including related cutting, welding, fitting jobs for different sizes: |
| 159 | size : 2\"/ 50 mm wide |
| 160 | size : 4\"/100 mm wide |
| 161 | size : 8\"/200 mm wide |
| 162 | size : 16\"/400 mm wide |
| 163 | Al. Tray Cover Fixation Size 200 mm. |
| 164 | Al. Tray Cover Fixation Size 400 mm. |
| 165 | Tray/ Angle Iron removing (for tubing/cables) including related cutting & grindingjobs for different sizes: |
| 166 | size : 2\"/ 50 mm wide |
| 167 | size : 4\"/100 mm wide |
| 168 | size : 8\"/200 mm wide |
| 169 | size : 16\"/400 mm wide |
| 170 | Al. Tray Cover Removal Size 200 mm. |
| 171 | Al. Tray Cover Removal Size 400 mm. |
| 172 | Fabrication/ Re-conditioning & Erection of GI/MS sheet Canopies/ Protection Covers for Transmitters/ other Instruments of size upto 1 sq m. area |
| 173 | Fabrication of Supports of Structural Steel |
| 174 | Fabrication of Stanchions for mounting Insts. As per standards |
| 175 | Dismentling of structure by opening bolts, gas cutting, removal & shifting from site to scrap stores |
| 176 | Removing of Canopy/ Protection Cover for Maintenance job of Instrument and Fixing back (any size) |
| 177 | ISOLATION VALVES & GLAND PACKING JOBS Fixing of Isolation Valves (Socket Weld /Threaded type) including fitting, welding & pressure testing job for following sizes : |
| 178 | size 1/4\", upto 1500# Lbs rating CS/ SS |
| 179 | size 1/2\", 1500# - 3000# Lbs rating CS/ SS |
| 180 | size 1\", 1500# - 3000# Lbs rating CS/ SS |
| 181 | size 2\", 1500# - 3000# Lbs rating CS/ SS |
| 182 | Removal of Isolation Valves (Socket Weld/ Threaded type) including fitting,cutting job irrespective of material, rating & upto size 2\" inclusive |
| 183 | Gland Packing of Isolation Valves / Control Valves of any sizes |
| 184 | Opening of Flanges, Cleaning, Repair & Polishing of Gasket Surfaces (including Lapping of Ring/ Lens Joint type) and boxing up as & when required. Size upto 4\" and all ratings |
| 185 | Dismentaling, Cleaning and Assembling of Condensate Drain System in Passivation Air Comprs.(K-3) |
| 186 | CONTROL VALVE JOBS |
| 187 | Opening of Control Valve from Actuator/ Bonnet /Line upto 2\" size & any rating |
| 188 | Opening of Control Valve from Actuator/ Bonnet / Line upto 3\" size & any rating |
| 189 | Opening of Control Valve from Actuator/ Bonnet upto 4\" size & any rating |
| 190 | Opening of Control Valve from Actuator/ Bonnet upto 5\" & 6\" size & any rating |
| 191 | Opening of Control Valve from Actuator/ Bonnet upto 8\" & 10\" size & any rating |
| 192 | Opening of Control Valve from Actuator/ Bonnet above 10\" size & any rating |
| 193 | Fixing back of Control Valve Actuator/ Bonnet on the Body / Line upto 2\" size & any rating |
| 194 | Fixing back of Control Valve Actuator/ Bonnet on the Body / Line upto 3\" size & any rating |
| 195 | Fixing back of Control Valve Actuator/ Bonnet on the Body upto 4\" size & any rating |
| 196 | Fixing back of Control Valve Actuator/ Bonnet on the Body upto 5\" & 6\" size & any rating |
| 197 | Fixing back of Control Valve Actuator/ Bonnet on the Body upto 8\"& 10\" size & any rating |
| 198 | Fixing back of Control Valve Actuator/ Bonnet on the Body above 10\" any rating |
| 199 | Removal of Valve Positioner with it\"s Pneumatic/ Electrical connection |
| 200 | Removal of Pilot Relay/ Lockup relay, LimitSwitch alongwith Pneumatic/ Electrical connection |
| 201 | Removal of Volume Booster alongwith it\"s Pneumatic connection |
| 202 | Removal of I/P Convertor alongwith Pneumatic/ Electrical connection |
| 203 | Removal of Solenoid Valve alongwith Pneumatic/ Electrical connection |
| 204 | Fixing of Valve Positioner alongwith Pneumatic/ Electrical connection |
| 205 | Fixing of Pilot Relay/ Lockup relay, LimitSwitch alongwith Pneumatic/ Electrical connection |
| 206 | Fixing of Volume Booster alongwith it\"s Pneumatic connection |
| 207 | Fixing of I/P Convertor alongwith it\"s Pneumatic/ Electrical connection |
| 208 | Fixing of Solenoid Valve alongwith Pneumatic/ Electrical connection |
| 209 | Replacement of Actutor Diapragm (Pneumatic) of any size actuator |
| 210 | Removal of Piston/Power Cylinder alongwith Pneumatic connection |
| 211 | Fixing of Piston/Power Cylinder alongwith Pneumatic connection |
| 212 | Lapping of Plug ,Seat & Other Sealing Surface of Control Valves |
| 213 | Greasing of Control Valve Parts |
| 214 | Removal of Air Filter Regulator set with fittings |
| 215 | Fixingof Air Filter Regulator set with fittings |
| 216 | JOBS IN BAGGING PLANT AREA |
| 217 | Removal and cleaning of Level Probes & refixing |
| 218 | Cleaning of Machines, Weigh Pans, Solenoid Valves,Power Cylinders etc. |
| 219 | Replacement of broken Weigh Pan assembly of Bagging Machines & Repairing by doing necessary Cutting/ Welding, cleaning etc. |
| 220 | Cleaning of \"Avery/Tulaman\" pre-determined Weighing Scales (Check-Weighers) |
| 221 | Cleaning of ET-6 Belt Weigher\"s framework and related equipments |
| 222 | Assistance in calibration of Bagging Machines by putting weights |
| 223 | Fixing of Power Cylinder of Piston Dia.upto 100mm on the machine |
| 224 | Removing of Power Cylinder of Piston Dia.upto 100mm from machine |
| 225 | Removal of Solenoid Valve spool type 5 ports |
| 226 | Fixing of Solenoid Valve spool type 5 ports |
| 227 | Laying/ Removing PVC / Nylon Tubing upto 12mm size |
| 228 | Filling of oil in Bagging Machine Air Regulators |
| 229 | Replacement of Proximity Sensor in Pandoor/ Bagholder of Bagging Machines |
| 230 | Replacement & Repairing of broken Feed Gate Assembly of Bagging Machines by doing necessary Cutting/ Welding, cleaning etc. |
| 231 | Removing, cleaning & fixing of Anti-vibration Pads in Bagging Machines |
| 232 | Replacement & Repairing of brokenBag Holder assembly of Bagging Machines by doing necessary Cutting/ Welding, cleaning etc. |
| 233 | Replacement of Load Cell (including all accessories) of Urea Bunker Level measuring system/ Urea Belt Weigher/ Weigh Bridges |
| 234 | OTHER MISC.JOBS |
| 235 | Removing of Manual Call Points MCP) including accessories |
| 236 | Refixing of Manual Call Points MCP) including glanding and termination |
| 237 | Removing of Heat, Flame or Smoke Detectors & termination |
| 238 | Refixing of Heat, Flame or Smoke detectors & termination |
| 239 | Painting of Control Valves, Actuators including accessories & other insts. with mounting stand |
| 240 | Writing of Tag Nos. on Instruments, Control Valves, etc |
| 241 | Cleaning of Instruments, Control valves, Local panels, CCR cabinets etc |
| 242 | Laying of Heat Detector Cable on Cable Trays & their connections |
| 243 | Removing of Heat Detector Cable on Cable Trays |
| 244 | Removal of Speed/ Vibration/ Axial Displacement Probe/ Extension Cable |
| 245 | Fixation of Speed/ Vibration/ Axial Displacement Probe/ Extension Cable |
| 246 | Removal of Field Tachometer/ Speed Indicator |
| 247 | Fixation of Field Tachometer/ Speed Indicator |
| 248 | Control Panel cutting (for cable entry or providing new instrument) |
| 249 | Removal of Low Explosive Limit Detector/ Ammonia Detector/ CO Detector |
| 250 | Fixation of Low Explosive Limit Detector / Ammonia Detector/ CO Detector |
| 251 | Transportation of Instruments/ Materials from respective Plant to Instrument Workshop/ Store |
| 252 | Transportation of Instruments/ Materials from Instrument Workshop/ Store to respective Plants |
| 253 | Removal of UV Flame Scanner & cleaning |
| 254 | Fixation of UV Flame Scanner |
| 255 | Removal of Weephole Probe in Urea reactors |
| 256 | Fixing of Weephole Probe in Urea reactors |
| 257 | Removal, Cleaning/ Washing and Fixing of Suction Air Filters of CCR/ LCR Control Cabinets (DCS/ESD/OPS/HIS/VMS & Printer Consoles) |
| 258 | Panel Cooling Fans removing, cleaning & checking |
| 259 | Panel Cooling Fans fixing (including mounting arrangement) |
| 260 | To assist NFL employees in executing various Instrument maintenance jobs in routine day to day maintenance |
| 261 | Helper (Un-skilled) |
| 262 | Instrumentation Technician (Skilled) |
| 263 | Supply of Contract labour for unplanned/ unforeseen plant Breakdown jobs & Planned Shutdown |
| 264 | Instrumentation Technician(Skilled) |
| 265 | Instrumentation Fitter (Skilled) |
| 266 | Helper / Mazdoor (Un-skilled) |
| 267 | Rigger(Skilled) |
| 268 | Welder (Skilled) |
| 269 | Electrician (Skilled) |
| 270 | Note: Party may fill any rate in SOQR Sl. No. 14 & 15 but not less than minimum amount as ilustreted in price Bid format Part-B of NIT. |