Annual Rate Contract Of Misc. Instrumentation Maintenance Jobs At Nfl Vijaipur Unit For The Year 2021-22- ( A ) Removing Of Level Gauges ( Pr. Rating < 40 Kg / Cm2 ) 3 Fixing Of Level Gauges ( Pr. Rating < 40 Kg / Cm2 ) 4 Removing Of Level Gauges ( Pr. Rating > 40 Kg / Cm2 ) 5 Fixing Of Level Gauges ( Pr. Rating > 40 Kg / Cm2 ) 6 Removing Of Level Switches ( Pr. Rating < 40 Kg / Cm2 ) 7 Fixing Of Level Switches ( Pr. Rating < 40 Kg / Cm2 ) 8 Removing Of Level Switches ( Pr. Rating > 40 Kg / Cm2 ) 9 Fixing Of Level Switches ( Pr. Rating > 40 Kg / Cm2 ) 10 Removing Oflevel Troll ( Pr. Rating < 40 Kg / Cm2 ) 11 Fixing Oflevel Troll ( Pr. Rating < 40 Kg / Cm2 ) 12 Removing Oflevel Ttroll ( Pr. Rating > 40 Kg / Cm2 ) 13 Fixing Oflevel Troll ( Pr. Rating > 40 Kg / Cm2 ) 14 Removing Of Level Controller ( Local ) / Transmitter 15 Fixing Of Level Controller ( Local ) / Transmitter 16 Removing Of Level Transmitters ( Purge Type ) 17 Fixing Of Level Transmitters ( Purge Type ) 18 Removing Of Level Dp Transmitter With / Without Capillary 19 Fixing Of Level Dp Transmitter With / Without Capillary 20 Removing Of Ultrasonic / Radar / Capacitance Type Level Transmitter With Accessories 21 Fixing Of Ultrasonic / Radar / Capacitance Type Level Transmitter With Accessories 22 Level Gauge Module Removal ( On Line ) For High Pressure Gauges 23 Level Gauge Module Fixation ( On Line ) For High Pressure Gauges 24 Removal Of Electrode Of Hydrastep ( L.G ) 25 Fixation Of Electrode Of Hydrastep ( L.G ) 26 Assistance In Removal Of Nuclear Type Level Instt. 27 Assistance In Fixing Of Nuclear Type Level Instt. 28 Removal Of Local Float & Rope Type Indicaters 29 Fixation Of Local Float & Rope Type Indicaters 30 Removal & Cleaning Of Purge Tube / Dip Tube Of Level Transmitter 31 Fixation Of Purge Tube / Dip Tube After Cleaning 32 Changing Of Gauge Glass / Mica Sheet / Gaskets Of Lgs 33 Pressure Measuring Instruments 34 Removing Of Pressure Gauges ( Ordinary ) ( All Sizes & Ratings ) 35 Fixing Of Pressure Gauges ( Ordinary ) ( All Sizes & Ratings ) 36 Removing Of Seal Diaphram Pressure Gauges ( Without Capillary ) ( All Sizes & Ratings ) 37 Fixation Of Seal Diaphram Pressure Gauges ( Without Capillary ) ( All Sizes & Ratings ) 38 Removing Of Seal Diaphram Pressure Gauges ( With Capillary ) ( All Sizes & Ratings ) 39 Fixation Of Seal Diaphram Pressure Gauges ( With Capillary ) ( All Sizes & Ratings ) 40 Removing Of Pressure Switches All Types / Sizes 41 Fixing Of Pressure Switches All Types / Sizes 42 Removing Of Electronic / Pneumatic Pressure Transmitters ( Without Capillary ) ( All Sizes & Ratings ) 43 Fixing Of Electronic / Pneumatic Pressure Transmitters ( Without Capillary ) ( All Sizes & Ratings ) 44 Removing Of Electronic / Pneumatic Pressure Transmitter / Diff. Pressure Transmitter ( With Capillary ) ( All Sizes & Ratings ) 45 Fixing Of Electronic / Pneumatic Pressure Transmitter / Diff. Pressure Transmitter ( With Capillary ) ( All Sizes & Ratings ) 46 Removing Of Pr.Controller ( Electronic ) ( Local Panel Mounted ) 47 Fixing Of Pr.Controller ( Electronic ) ( Local Panel Mounted ) 48 Removing Of Air Pr. Regulators -Any Size / Rating 49 Fixingof Air Pr. Regulators -Any Size / Rating 50 Removing Of Pressure Transmitter ( Lens Gasket ) ( Electronic / Pneumatic ) With Capillary 51 Fixing Of Pressure Transmitter ( Lens Gasket ) ( Electronic / Pneumatic ) With Capillary 52 Flow Measuring Instruments 53 Removing Of Purge / On-Line Rotameters Of All Sizes / Ratings 54 Fixing Of Purge / On-Line Rotameters Of All Sizes / Ratings 55 Removing Of Dp Type Flowmeter - Electronic / Pneumatic ( Without Seal ) 56 Fixing Of Dp Type Flowmeter - Electronic / Pneumatic ( Without Seal ) 57 Removing Of Dp Type Flowmeter - Electronic / Pneumatic ( With Seal ) 58 Fixing Of Dp Type Flowmeter - Electronic / Pneumatic ( With Seal ) 59 Removal Of Turbine Flowmeter 60 Fixingof Turbine Flowmeter 61 Removal Of Ovalgear Type / Mass Flowmeter 62 Fixingof Ovalgear Type / Mass Flowmeter 63 Removal Of Electro Magnetic Type Flowmeter 64 Fixingof Electro Magnetic Type Flowmeter 65 Removing Of Dpi / Dp Type Local Flowmeter 66 Fixing Of Dpi / Dp Type Local Flowmeter 67 Removing Of Pitot Tube / Annubar Of Any Size / Rating 68 Fixing Of Pitot Tube / Annubar Of Any Size / Rating 69 Removing Of Flow Switches For Line Size Upto 2 70 Fixing Of Flow Switches For Line Size Upto 2 71 Removing Of Flow Switches For Line Size > 2 72 Fixing Of Flow Switches For Line Size > 2 73 Removing Of Recorder From Local / Ccr Panel 74 Fixing Of Recorder From Local / Ccr Panel 75 Temperature Measuring Instruments 76 Removing Of The Thermo-Couple / Rtd Elements ( Single, Duplex, Triplex ) Including Elecrical Termination 77 Fixing Of The Thermo-Couple / Rtd Elements ( Single, Duplex, Triplex ) Including Electrical Termination 78 Removing Of The Temperature Recorder / Indicator / Monitor From Panel 79 Fixing Of The Temperature Recorder / Indicator / Monitor From Panel 80 Removing Of Local Temperature Gauge ( Bimettalic / Filled ) With Mounting 81 Fixing Of Local Temperature Gauge ( Bimettalic / Filled ) With Mounting 82 Removing Of Temperature Switch Including Electrical Termination 83 Fixing Of Temperature Switch Including Electrical Termination 84 Removing Of Capillary Filled Type Local Temperature Gauge With Mounting 85 Fixing Of Capillary Filled Type Local Temperature Gauge With Mounting 86 Removal Of Thermowell Of All Sizes & Ratings 87 Fixingof Thermowell Of All Sizes & Ratings 88 Analysers 89 Removing And Cleaning Of Water Analysers ( Ph, Conductivity, Residual Chlorine ) Including Asssociated Accessories 90 Fixing Back Of Water Analysers ( Ph, Conductivity, Residual Chlorine ) Including Asssociated Accessories 91 Removing And Cleaning Of The Gas Analysers ( Co, Co2, Methane, Nh3, O2, H2, Etc. ) Including Accessories 92 Fixing Of The Gas Analysers ( Co, Co2, Methane, Nh3, O2, H2, Etc. ) Including Accessories 93 Removal And Cleaning Of Chlorine Detectors Including Accessories 94 Fixing Of Chlorine Analyser Detectors Including Accessories 95 Removal And Cleaning Of Chlorine Ejector 96 Fixing Of Chlorine Ejector 97 Removal And Cleaning Of Chlorine Regulator 98 Fixing Of Chlorine Regulator 99 Removing, Cleaning & Tightening Of Water Analyser Sampling System Components 100 Removing And Cleaning Of Ph Analyser Filters & Fixing Them Back 101 Removing Of Calibration Gas Cylinders With Regulators & Connections 102 Fixing Of Calibration Gas Cylinders With Regulators & Connections 103 Removing Of Gas Regulators From Gas Cylinders 104 Fixing Of Gas Regulators From Gas Cylinders 105 Removal Of Damaged Sample Cooling Coil, Repair / Fabrication Of New Coil From 6Mm Ss Tube & Mounting Of Same In Sample Cooler 106 Impulse Line Piping For Transmitters 107 Laying, Fabrication, Erection & Testing Including Required Cutting, Fitting & Welding Jobs For Following Pipe Size / Rating: 108 Size 1 / 2 Carbon Steel, Non Ibr Sch 40 109 Size 1 / 2 Carbon Steel, Non Ibr Sch 80 110 Size 1 / 2 Carbon Steel, Non Ibr Sch 160 111 Size 1 / 2 Stainless Steel, Non Ibr Sch 40 / 80 112 Size 1 / 2 Stainless Steel, Non Ibr Sch 160 113 Size 1 / 2 Alloy Steel, Non Ibr Sch 40 114 Size 1 / 2 Alloy Steel, Non Ibr Sch 80 115 Size 1 / 2 Alloy Steel, Non Ibr Sch 160 116 Size 1 / 2 Alloy Steel, Ibr Sch 40 117 Size 1 / 2 Alloy Steel, Ibr Sch 80 118 Size 1 / 2 Alloy Steel, Ibr Sch 160 119 Size 1 Carbon Steel, Non Ibr Sch 40 / 80 120 Size 1 Stainless Steel, Non Ibr Sch 40 / 80 121 Size 2 Carbon Steel, Non Ibr Sch 40 / 80 122 Size 2 Stainless Steel, Non Ibr Sch 40 / 80 123 Removal Of Pipingwith Supports Including Cutting For All Sizes Irrespective Of Pipe Material & Rating 124 Laying & Testing Of Gi Pipe Including Cutting, Fitting & Welding Jobs For Following Pipe Sizes: 125 Size 1 / 2 126 Size 1 127 Size 2 128 Removal Of Gi Pipe With Supports Including Cutting For All Sizes 129 Arrest The Leakage Of A Joint By Welding / Rewelding Of Joint / Welding Of Crack Or Broken Parts 130 For Carbon Steel Material & All Rating 131 For Stainless Steel Material & All Rating 132 Removal Of Condensate Pots Including Related Cutting 133 Fixing Of Condensate Pots Including Cutting & Welding 134 Fabrication & Installation Of Float Guide Upto 4 Pipe 135 Tubing Jobs ( Including Connections & Testing ) 136 Size 6Mm S.S. / Copper Tube Laying 137 Size 6Mm S.S. / Copper Tube Removing 138 Size 8Mm S.S. / Copper Tube Laying 139 Size 8Mm S.S. / Copper Tube Removing 140 Size 10Mm S.S. / Copper Tube Laying 141 Size 10Mm S.S. / Copper Tube Removing 142 Size 12Mm S.S. / Copper Tube Laying 143 Size 12Mm S.S. / Copper Tube Removing 144 Cabling Jobs: Cable Laying On Cable Tray / Trench / Conduits, Glanding, Termination & Checking Of Cables For Loop Continuity. Removing Of Cables From Cable Trays / Trench / Conduits Including Electrical Terminations And Storing Them With Proper Marking. Cable Types: Signal, Power, Control, Thermocouple, Rtd Cables- Conductor Size =<0.5Mm2 ( Armoured / Unarmoured ) 145 Laying Of Cable, 2 Core To 6 Core 146 Removing Of Cable, 2 Core To 6 Core 147 Laying Of Cable, 7 Core To 24 Core 148 Removing Of Cable 7 Core To 24 Core 149 Fixing Of Junction Box Complete With Accessories ( Area<=500 Cm2 ) 150 Removal Of Junction Box Disconnecting Electrical Cables ( Area<=500 Cm2 ) 151 Fixing Of Junction Box Complete With Accessories ( Area>500 Cm2 ) 152 Removal Of Junction Box Disconnecting Electrical Cables ( Area>500 Cm2 ) 153 Digging 300Mm Wide 0.5 M Deep Trench, Laying Of Bricks & Filling Back With Sand / Earth After Laying The Cable 154 Laying Conduit / Gi Pipe=<2Through The Trench 300Mmwide 0.5M Deep 155 Dressing Of The Cables ( 2 To 24 Core ) With Proper Clamping 156 Removal Of Broken Bolts Of Jb Covers & Fixing New Bolts. 157 Replacement Of Cable Gland / Pipe Fitting / Tube Fitting, Where Cable Laying / Pipe Laying / Tube Laying Is Not Desired. Size Upto 2 And All Rating & Material. 158 Tray & Other Misc. Jobs Tray / Angle Iron Laying ( For Tubing / Cables ) Fixing Of Supports - Including Related Cutting, Welding, Fitting Jobs For Different Sizes: 159 Size : 2 / 50 Mm Wide 160 Size : 4 / 100 Mm Wide 161 Size : 8 / 200 Mm Wide 162 Size : 16 / 400 Mm Wide 163 Al. Tray Cover Fixation Size 200 Mm. 164 Al. Tray Cover Fixation Size 400 Mm. 165 Tray / Angle Iron Removing ( For Tubing / Cables ) Including Related Cutting & Grindingjobs For Different Sizes: 166 Size : 2 / 50 Mm Wide 167 Size : 4 / 100 Mm Wide 168 Size : 8 / 200 Mm Wide 169 Size : 16 / 400 Mm Wide 170 Al. Tray Cover Removal Size 200 Mm. 171 Al. Tray Cover Removal Size 400 Mm. 172 Fabrication / Re-Conditioning & Erection Of Gi / Ms Sheet Canopies / Protection Covers For Transmitters / Other Instruments Of Size Upto 1 Sq M. Area 173 Fabrication Of Supports Of Structural Steel 174 Fabrication Of Stanchions For Mounting Insts. As Per Standards 175 Dismentling Of Structure By Opening Bolts, Gas Cutting, Removal & Shifting From Site To Scrap Stores 176 Removing Of Canopy / Protection Cover For Maintenance Job Of Instrument And Fixing Back ( Any Size ) 177 Isolation Valves & Gland Packing Jobs Fixing Of Isolation Valves ( Socket Weld / Threaded Type ) Including Fitting, Welding & Pressure Testing Job For Following Sizes : 178 Size 1 / 4, Upto 1500# Lbs Rating Cs / Ss 179 Size 1 / 2, 1500# - 3000# Lbs Rating Cs / Ss 180 Size 1, 1500# - 3000# Lbs Rating Cs / Ss 181 Size 2, 1500# - 3000# Lbs Rating Cs / Ss 182 Removal Of Isolation Valves ( Socket Weld / Threaded Type ) Including Fitting, Cutting Job Irrespective Of Material, Rating & Upto Size 2 Inclusive 183 Gland Packing Of Isolation Valves / Control Valves Of Any Sizes 184 Opening Of Flanges, Cleaning, Repair & Polishing Of Gasket Surfaces ( Including Lapping Of Ring / Lens Joint Type ) And Boxing Up As & When Required. Size Upto 4 And All Ratings 185 Dismentaling, Cleaning And Assembling Of Condensate Drain System In Passivation Air Comprs. ( K-3 ) 186 Control Valve Jobs 187 Opening Of Control Valve From Actuator / Bonnet / Line Upto 2 Size & Any Rating 188 Opening Of Control Valve From Actuator / Bonnet / Line Upto 3 Size & Any Rating 189 Opening Of Control Valve From Actuator / Bonnet Upto 4 Size & Any Rating 190 Opening Of Control Valve From Actuator / Bonnet Upto 5 & 6 Size & Any Rating 191 Opening Of Control Valve From Actuator / Bonnet Upto 8 & 10 Size & Any Rating 192 Opening Of Control Valve From Actuator / Bonnet Above 10 Size & Any Rating 193 Fixing Back Of Control Valve Actuator / Bonnet On The Body / Line Upto 2 Size & Any Rating 194 Fixing Back Of Control Valve Actuator / Bonnet On The Body / Line Upto 3 Size & Any Rating 195 Fixing Back Of Control Valve Actuator / Bonnet On The Body Upto 4 Size & Any Rating 196 Fixing Back Of Control Valve Actuator / Bonnet On The Body Upto 5 & 6 Size & Any Rating 197 Fixing Back Of Control Valve Actuator / Bonnet On The Body Upto 8& 10 Size & Any Rating 198 Fixing Back Of Control Valve Actuator / Bonnet On The Body Above 10 Any Rating 199 Removal Of Valve Positioner With ItS Pneumatic / Electrical Connection 200 Removal Of Pilot Relay / Lockup Relay, Limitswitch Alongwith Pneumatic / Electrical Connection 201 Removal Of Volume Booster Alongwith ItS Pneumatic Connection 202 Removal Of I / P Convertor Alongwith Pneumatic / Electrical Connection 203 Removal Of Solenoid Valve Alongwith Pneumatic / Electrical Connection 204 Fixing Of Valve Positioner Alongwith Pneumatic / Electrical Connection 205 Fixing Of Pilot Relay / Lockup Relay, Limitswitch Alongwith Pneumatic / Electrical Connection 206 Fixing Of Volume Booster Alongwith ItS Pneumatic Connection 207 Fixing Of I / P Convertor Alongwith ItS Pneumatic / Electrical Connection 208 Fixing Of Solenoid Valve Alongwith Pneumatic / Electrical Connection 209 Replacement Of Actutor Diapragm ( Pneumatic ) Of Any Size Actuator 210 Removal Of Piston / Power Cylinder Alongwith Pneumatic Connection 211 Fixing Of Piston / Power Cylinder Alongwith Pneumatic Connection 212 Lapping Of Plug , Seat & Other Sealing Surface Of Control Valves 213 Greasing Of Control Valve Parts 214 Removal Of Air Filter Regulator Set With Fittings 215 Fixingof Air Filter Regulator Set With Fittings 216 Jobs In Bagging Plant Area 217 Removal And Cleaning Of Level Probes & Refixing 218 Cleaning Of Machines, Weigh Pans, Solenoid Valves, Power Cylinders Etc. 219 Replacement Of Broken Weigh Pan Assembly Of Bagging Machines & Repairing By Doing Necessary Cutting / Welding, Cleaning Etc. 220 Cleaning Of Avery / Tulaman Pre-Determined Weighing Scales ( Check-Weighers ) 221 Cleaning Of Et-6 Belt WeigherS Framework And Related Equipments 222 Assistance In Calibration Of Bagging Machines By Putting Weights 223 Fixing Of Power Cylinder Of Piston Dia.Upto 100Mm On The Machine 224 Removing Of Power Cylinder Of Piston Dia.Upto 100Mm From Machine 225 Removal Of Solenoid Valve Spool Type 5 Ports 226 Fixing Of Solenoid Valve Spool Type 5 Ports 227 Laying / Removing Pvc / Nylon Tubing Upto 12Mm Size 228 Filling Of Oil In Bagging Machine Air Regulators 229 Replacement Of Proximity Sensor In Pandoor / Bagholder Of Bagging Machines 230 Replacement & Repairing Of Broken Feed Gate Assembly Of Bagging Machines By Doing Necessary Cutting / Welding, Cleaning Etc. 231 Removing, Cleaning & Fixing Of Anti-Vibration Pads In Bagging Machines 232 Replacement & Repairing Of Brokenbag Holder Assembly Of Bagging Machines By Doing Necessary Cutting / Welding, Cleaning Etc. 233 Replacement Of Load Cell ( Including All Accessories ) Of Urea Bunker Level Measuring System / Urea Belt Weigher / Weigh Bridges 234 Other Misc.Jobs 235 Removing Of Manual Call Points Mcp ) Including Accessories 236 Refixing Of Manual Call Points Mcp ) Including Glanding And Termination 237 Removing Of Heat, Flame Or Smoke Detectors & Termination 238 Refixing Of Heat, Flame Or Smoke Detectors & Termination 239 Painting Of Control Valves, Actuators Including Accessories & Other Insts. With Mounting Stand 240 Writing Of Tag Nos. On Instruments, Control Valves, Etc 241 Cleaning Of Instruments, Control Valves, Local Panels, Ccr Cabinets Etc 242 Laying Of Heat Detector Cable On Cable Trays & Their Connections 243 Removing Of Heat Detector Cable On Cable Trays 244 Removal Of Speed / Vibration / Axial Displacement Probe / Extension Cable 245 Fixation Of Speed / Vibration / Axial Displacement Probe / Extension Cable 246 Removal Of Field Tachometer / Speed Indicator 247 Fixation Of Field Tachometer / Speed Indicator 248 Control Panel Cutting ( For Cable Entry Or Providing New Instrument ) 249 Removal Of Low Explosive Limit Detector / Ammonia Detector / Co Detector 250 Fixation Of Low Explosive Limit Detector / Ammonia Detector / Co Detector 251 Transportation Of Instruments / Materials From Respective Plant To Instrument Workshop / Store 252 Transportation Of Instruments / Materials From Instrument Workshop / Store To Respective Plants 253 Removal Of Uv Flame Scanner & Cleaning 254 Fixation Of Uv Flame Scanner 255 Removal Of Weephole Probe In Urea Reactors 256 Fixing Of Weephole Probe In Urea Reactors 257 Removal, Cleaning / Washing And Fixing Of Suction Air Filters Of Ccr / Lcr Control Cabinets ( Dcs / Esd / Ops / His / Vms & Printer Consoles ) 258 Panel Cooling Fans Removing, Cleaning & Checking 259 Panel Cooling Fans Fixing ( Including Mounting Arrangement ) 260 To Assist Nfl Employees In Executing Various Instrument Maintenance Jobs In Routine Day To Day Maintenance 261 Helper ( Un-Skilled ) 262 Instrumentation Technician ( Skilled ) 263 Supply Of Contract Labour For Unplanned / Unforeseen Plant Breakdown Jobs & Planned Shutdown 264 Instrumentation Technician ( Skilled ) 265 Instrumentation Fitter ( Skilled ) 266 Helper / Mazdoor ( Un-Skilled ) 267 Rigger ( Skilled ) 268 Welder ( Skilled ) 269 Electrician ( Skilled ) 270 Note: Party May Fill Any Rate In Soqr Sl. No. 14 & 15 But Not Less Than Minimum Amount As Ilustreted In Price Bid Format Part-B Of Nit. => Limited