Construction Of 6 Mt. Cool Chamber For Vegetable In Salema R.D. Block Under National Rurban Mission ( Civil Works )
Tender Value
8.56 Lakhs
Estimated cost
Bid Submission
22 Dec 2021
0 days left
EMD
8569
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Salema → Tripura
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of 6 Mt. Cool Chamber For Vegetable In Salema R.D. Block Under National Rurban Mission ( Civil Works )
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil. By manual means. |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming andwatering, lead up to 50 m and lift up to 1.5 m.-All kinds of soil. |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 4 | Supplying chemical emulsion in sealed containers including delivery as specified Chlorpyriphos/Lindane emulsifiable concentrate of 20% |
| 5 | Treatment of soil under plinth filling using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with sand filling: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level: 1:4:8 (1 Cement: 4 fine sand: 8 well brunt brick aggregate 40mm nominal size). |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stoneaggregate 20 mm nominal size).finishing and reinforcement- |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement-In plinth and skirting courses, fillets, columns, pillars, posts and struts 1:1½:3 (1 Cement: 1½ fine sand: 3 graded stone aggregate 20 mm nominal size). |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centering, shuttering, finishing and reinforcement-RCC work in beams, lintels, bands, plain window sills, staircases and spiral staircases excluding precast spiral staircase. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size). |
| 10 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to floor five level. Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars. |
| 11 | First class brick work in foundation and plinth including cost of all materials as required complete: - In cement mortar 1:6 (1 cement: 6 fine sand). |
| 12 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:- In cement mortar 1:6 ( 1 cement : 6 fine sand ). |
| 13 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:- In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 14 | Providing and laying cement concrete 1:2:4 (1 cement: 2 fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips and cost of glass strips etc. complete. 40 mm thick |
| 15 | Centering shuttering including strutting, propping etc and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank. |
| 16 | Centering shuttering including strutting, propping etc and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply. |
| 17 | Centering shuttering including strutting, propping etc and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden ply. |
| 18 | Centering shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply. |
| 19 | Providing and fixing MS grills of required pattern in wooden frames of windows etc. with MS flats square or round bars with round headed bolts and nuts or by screws. |
| 20 | Providing and fixing on wall face unplasticised Rigid PVC rain water, soil, waste & vent pipes (working pressure 4 kg / cm2) conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion: |
| 21 | 12 mm Cement plaster of mix in cement mortar 1:4 (1Cement: 4 fine Sand). |
| 22 | 20 mm cement plaster of mix cement mortar: 1:4 (1Cement: 4 fine Sand). |
| 23 | 6 mm cement plaster of mix: Cement mortar 1:3 (1 cement: 3 fine sand). |
| 24 | 15 mm cement plaster on the rough side of single or half brick wall of mix: Cement mortar 1:4 (1 cement : 4 fine sand) sqm |
| 25 | Neat cement punning. |
| 26 | Finishing walls with textured exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] : New work ( two or more coats applied @ 3.28 litre/10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm |
| 27 | Applying priming coat [Payment shall be made after submission of Test Certificate issued by the Manufacturer] :With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works. |
| 28 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture. |
| 29 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -All kinds of soil |
AI Tender Summary
Tender Timeline
Dec 08, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedDec 22, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 22, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender