Special Repairs To Anjugramam Road Km 3 2 3 4 And 5 0 7 725 In Nagercoil H C And M Sub Division Special Repairs To Anjugramam Road Km 3 2 3 4 And 5 0 7 725 In Nagercoil H C And M Sub Division, Nagarcoil-Tamil Nadu
TDR : 30183059
Tender Notice
BOQ
Expired
Nagarcoil
Tamil Nadu
Special Repairs To Anjugramam Road Km 3 2 3 4 And 5 0 7 725 In Nagercoil H C And M Sub Division Special Repairs To Anjugramam Road Km 3 2 3 4 And 5 0 7 725 In Nagercoil H C And M Sub Division
Special Repairs to Anjugramam road km 3/2 - 3/4 and 5/0 - 7/725 in Nagercoil (H), C&M Sub Division
Sl. No.
Item Description
1
Charges for cutting the B.T surface to 3 to 7cm depth, conveying the Milled waste materials to suitable site, including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers.
2
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.
3
Bituminous Concrete Grade II (Table500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects)as per MORTH Rev. V Clause No. 111, 112, 507 & 900.
4
Calculation of SubTotal, GST and Total Amount carried out by system automatically
5
Basic cost of value put to tender as per estimate
6
Add GST at 12%
7
Total Value put to Tender
8
Negotiated Percentage
9
Final Negotiated Value
10
Add GST at 12% of Final Negotiated Value
11
Total Value of Contract Including 12% of GST
12
Basic cost of value put to tender as per Estimate
13
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.