Webel Technology Limited-WTL has published Selection Of System Integrator For Capacity Enhancement Of West Bengal State Data Centre ( Wb - Sdc ) And Setting Up Its Dr Site At Remote Location.- 1 Hpe Storage Dc ( Primera 650 ) - 450Tb Upgrade To 650Tb ( +100Tb Ssd + 100Tb Sas ) 2 Netap. Submission Date for this Tender is 09-03-2022. Wrenches and Drivers Tenders in As per NIT West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 09-Dec-2021 | CORRIGENDUM1 | Technical Bid | 27-12-2021 |
2 | 20-Dec-2021 | CORRIGENDUM2 | Date | 14-01-2022 |
3 | 24-Dec-2021 | CORRIGENDUM 3 | Technical Bid | 14-01-2022 |
4 | 24-Dec-2021 | CORRIGENDUM 4 | BOQ | 14-01-2022 |
5 | 10-Jan-2022 | CORRIGENDUM5 | Date | 21-01-2022 |
6 | 14-Jan-2022 | CORRIGENDUM7 | BOQ | 21-01-2022 |
7 | 14-Jan-2022 | CORRIGENDUM6 | Technical Bid | 21-01-2022 |
8 | 21-Jan-2022 | CORRIGENDUM8 | Date | 21-02-2022 |
9 | 31-Jan-2022 | CORRIGENDUM 9 | Other | 21-02-2022 |
10 | 07-Feb-2022 | CORRIGENDUM10 | Technical Bid | 21-02-2022 |
11 | 16-Feb-2022 | CORRIGENDUM11 | Technical Bid | 21-02-2022 |
12 | 21-Feb-2022 | CORRIGENDUM12 | Date | 09-03-2022 |
Sl. No. | Item Description |
1 | HPE Storage DC (Primera 650) - 450TB upgrade to 650TB (+100TB SSD + 100TB SAS) |
2 | Netapp Storage DC (AFF-A700) - 170TB upgrade to 430TB (+260TB SSD) |
3 | Blade server with 2 x Intel 6238R 2.2GHz/165W 28C/38.5MB,1536GB DDR4 2933MHz mem, 2x960GB 12G SAS 10K RPM SFF HDD, 12G SAS RAID controller with Drive bays |
4 | Blade Chasis with converged network connectivity for 4x32GB FC, 4x10G FCOE and 2x40G connectivity, Redundant 2500W Platinum AC Hot Plug Power Supply |
5 | Rack Server with 2 xIntel latest generation Xeon® Gold Ice Lake Processors with minimum 2.0 Ghz & 32Coreper socket and 48 MB Cache., 768GB DDR4 2933MHz mem, 4x1.2TB 12G SAS 10K RPM SFF HDD |
6 | Red Hat Cloud Infrastructure, Premium (2-sockets) with support for 3 years |
7 | High Availability for Unlimited Guests with support for 3 years |
8 | DCO, Capacity & ITO Software License for DCIM - 20 Each |
9 | EDB Postgres Enterprise Unicore per year license - Production DB Support Plan for 3 years |
10 | EDB Postgres Enterprise Unicore per year license - Replica DB Support Plan for 3 years |
11 | EMS Software per device for 3 years (as per technical spec.) |
12 | Red hat Enterprise Linux Standard for virtual Datacenters with 1 Yr Standard Subscription for 3 years |
13 | Red hat Openshift Container Platform (Bare Metal Node) with run time, Premium, 1-2 Nodes upto 64 Cores for 3 years |
14 | Version Control Software with Functional test automation - 10 Concurrent User, Load runner professional foundation - qty 1 (500 virtual users) and Application Life Cycle Manager - 10 concurrent user license with support for 2 years |
15 | MS SQL Standard Latest version |
16 | My SQL enterprise version (3 years) |
17 | Lotus Domino Email softeare with 500 user mail box |
18 | DDOS First 2 Years - BOQ - DDoS Protector appliance with SME Dual Power Supply DC |
19 | 10Gbps Pluggable Optics (XFP) Multimode SR for DDOS |
20 | Deployment of DDoS Protector in basic configuration at the customer site, including configuration, testing and tuning |
21 | DDoS Management VA2 Virtual Appliance for management of 2 DDoS Protector physical devices for 2Y |
22 | SOAR (Security Orchestration Automation Response) - Simplify Platform Base Package Premium. Includes: 2 years License for Platform, 3 analyst seats, 5 Advanced Reporting Users, 24x7 Premium support for 2 Years incuding implementation & training |
23 | Deep Security Software - Deep Security - Enterprise - per Server (VM) |
24 | DDAN-Deep Discovery Analyzer |
25 | VTL SYSTEM,DD4200,CTL,NFS,CIFS - CAPACITY UPGRADE to 75TB |
26 | Integration of VTL with Commvault Tape Library |
27 | UPS 80 KVAwith 30 mins battery backup for uninterrupted power supply to active tiles with necessary electrical cabling |
28 | LTO 7 Tapes for Data Backup |
29 | Rack Containment Zone Net Work and Server Racks- Supply, Installation, Testing & Commissioning of 42U Server Cabinet with Extruded Aluminium Profile based frame with top panel; having Static load bearing capacity of 1300 Kg as per Tender specifications. . Dimensions: 2100mm x 750mm x 1200mm all complete as requiured and as per detailed specifications. Racks, PDUs, containment should be from same OEM. |
30 | Active tiles for 2nd,3rd & 4th containment |
31 | Perforated tiles for 3rd & 4th containment |
32 | Supply, Installation, Integration with existing infra, Testing & Commissioning of 42U Server Cabinet Extruded Aluminium Profile frame with top panel;having static load bearing capacity of 1300 Kg as per Tender specifications. . Dimensions: 2200mm x 800mm x 1200mm all complete as required and as per detailed specifications. Racks, PDUs, containment should be from same OEM |
33 | Supply, Installation, testing and intregation with existing infra, Commissioning & Intregation of Single Phase 32 A , 7 kW Zero U Vertical Rack IPDU with combination of C 13 and C 19 sockets of total 36 Nos. VDE Certified & ROHS Compliant as per technical specifications |
34 | Supply, Installation, Testing andintregation with existing infra, Commissioning of Universal Cold Aisle Containment including wall beams, end-of-row frames, dual sliding doors with provision for CCTV Cameras , FAS detectors (Width - 1200mm), necessary passive cabling, all complete as required and as per detailed specifications.( for existing and new containment) |
35 | Supply, Installation, Testing andintregation with existing infra, Commissioning of CCTV camera near BMS corridor, 4kl UG Fuel tank, First floor entry, Landing room |
36 | Dismantling of existing false celing and existing electrical wiring, DBs, Fire fighting system and Modification of AC duct and opening of Exit Door at DR Site |
37 | Mineral Fiber Ceiling False Ceiling of Mineral fiber board at appropriateheight should be installed concealing any cabling tray and electrical lighting wiring in all areas except server/network room. The False Ceiling tile should be Dust free type and of Noncombustible material. 1200 mmcross tee at every 600 mm c/c and 600mmcross tee at every 1200mm c/c max and wall angle all around the wall to form a grid of 600 mm x 600 mm and suspending the grid using 2mm GI rod and 6 mm raw plug at every 1200 mm intervals at the main tee and laying the Ceiling tiles of size 595 mm x 595 mm x 15 mm over the formed grid having fire rating of 60 minutes as per BS 476/23 of 1987, Noise reduction Coefficient (NRC) of 0.50-0.60, to resist temperature and humidity conditions up to 40degree (104deg. F) and humidity of 99% RH should be installed. All overhead cable trays will be secured to a rigid frame that carries the load either to the roof structure or to the floor slab. |
38 | MetalCeiling for Server Room False Ceiling of Metalboard at appropriateheight should be installed concealing any cabling tray and electrical lighting wiring in all areas except server/network room. The False Ceiling tile should be Dust free type and of Noncombustible material. 1200 mmcross tee at every 600 mm c/c and 600mmcross tee at every 1200mm c/c max and wall angle all around the wall to form a grid of 600 mm x 600 mm and suspending the grid using 2mm GI rod and 6 mm raw plug at every 1200 mm intervals at the main tee and laying the Ceiling tiles of size 595 mm x 595 mm x 15 mm over the formed grid having fire rating of 60 minutes as per BS 476/23 of 1987, Noise reduction Coefficient (NRC) of 0.50-0.60, to resist temperature and humidity conditions up to 40degree (104deg. F) and humidity of 99% RH should be installed. All overhead cable trays will be secured to a rigid frame that carries the load either to the roof structure or to the floor slab. |
39 | Raised Floor- Supply & Installation of stepped raised floor .The floor panels shall be of size 600mm x 600mm fabricated entirely from non-combustible component which shall be 100% interchangeable and shall consist of flat steel top sheet, resistance welded to steel bottom section finished with anti corrosive and conductive paint. Pedestal assembling: Consisting of 100x100x2 mm thick galvanized MS base plate die-pressed fully welded to 1.6mm thick galvanized MS pipe to engage the Pedestal head assembly. The Pedestal head shall be 90x90mm, 4mm thk assembly consisting of an embossed steel plate having 4 holes with 6mm thk taping for fastening of stringer and locating of Tile. Care to be taken to achieve the zero levelling. |
40 | Double Cup Tile Puller |
41 | Ramp: Its sub floor elements must be sufficient to support fully loaded heavy equipment weighing at least 1600 kilograms. Ramp will be having lines with non-skid type mats on lining. The angle of inclination for ramp should not be more than 10 degree. |
42 | Steps: Providing steps at the location shown in layout to match raised floor level to true floor level. The steps will be having lines with non-skid type mats on liningThe height of single step should not be more than 250 mm and width should not be less than 250 mm. |
43 | Tharmal insulation with 19 mm Nitrel rubber |
44 | Providing and Applying approved Emulsion Low VOC paint in three or more coats of approved brand and shade to internal sufaces (walls / partitions/ ceiling or any other location as directed),to give an even shade to the approval of the engineer, including Putty & horoughly brushing the surface free from foreign matter, sand papering smooth, filling in all holes and cracks , applying lambi / palti and rubbing down the surface, lambi/palti sandwitched with two coats of approved primer, rate to include all tools, labour, scaffolding, primer as required completed as directed by the engineer. |
45 | Fire Rated Paint with putty work for Server Room and Electrical Room |
46 | Fire Rated Partition : Providing and fixing in position full height partition wall of 100 mm thick fire line gyp-board partition using 12.5 mm thick double fire line gypboard on both sides with GI steel metal vertical stud frame of size 50 mm fixed in the floor and ceiling channels of 50 mm wide to provide a strong partition. Glass wool insulation inside shall be provided as required. Fixing is by self-tapping screw with vertical studs being at 610 mm intervals. The same should be inclusive of making cut-outs for switch board, sockets, grill etc. It shall also include preparing the surface smoothly and all as per manufacture’s specification etc. finally finishing with one coat of approved brand of fire resistant coating. ( Server Room and Electrical Room ) |
47 | Non Fire Rated Partition : Providing and fixing in position full height partition wall of 100 mm thickgyp-board partition using 12.5 mm thick double fire line gypboard on both sides with GI steel metal vertical stud frame of size 50 mm fixed in the floor and ceiling channels of 50 mm wide to provide a strong partition. Glass wool insulation inside shall be provided as required. Fixing is by self-tapping screw with vertical studs being at 610 mm intervals. The same should be inclusive of making cut-outs for switch board, sockets, grill etc. It shall also include preparing the surface smoothly and all as per manufacture’s specification etc. finally finishing with one coat of approved brand of fire resistant coating. |
48 | Fire rated door 2400 x 1500 double leaf in equal door |
49 | Panic bar for fire exit door |
50 | Fire rated door 2400 x 1000 single leaf |
51 | Main Flash Door at Data Centre Entrance double leaf 1500 x 2400 |
52 | BMS and Manager Room Flash Door single leaf 1000 x 2400 mm |
53 | Liner work station |
54 | Hydrolic lo back chair |
55 | Cleanning & house keeping till hand over the project including debrise cleanning and out from site. |
56 | Sinages as required considering all rooms, Danger plat, Push, Pull, Fire exit, Emergency exit, |
57 | Drawing & Design cost |
58 | Strutural Steel with Stair case |
59 | Main Power Distribution Panel : Supply Installation testing commissioning for Main Data Centre Panel. making of CRCA powder coated sheet, Having Incommer 200 A 4 pole MCCB with 36 KA. Out Going : 100 A 4 pole MCCB 3 nos, 63 A 4 pole MCCB 4 Nos, 32 A 4 pole MCB 6 nos, with multifunction meter with communication port ( RS 485) & R,Y, B, ON, OFF, Trip Indication LED lamps & 500 A rated Aluminium bus bar. |
60 | UPS Output Panel : Incomer 2 Nos 100A 4 Pole MCCB with Metering ( MFM with RS 485 Port , Indication lamp and control MCBs ) Outgoing 32A DP 18 Nos |
61 | Lighting DBs, BMS DBs and Raw Power DBs |
62 | 4 Run X 25 sq.mm. copper flexible cable for 40 KVA UPS Input and Output cable |
63 | 4 Core 240 sq.mm. AL. Armured cable Incomer Supply |
64 | 4 Run X 10 sq.mm. copper flexible cable for Lighting DB, Power DB , BMS DBs and PAC |
65 | 50 sq.mm. copper flexible cable for earthing. |
66 | 3 CoreX 4 sq.mm. copper flexible cable for server rack |
67 | Supply laying and commissioning of power points by 25 mm PVC conduit and 2.5 sqmm copper wire for power points and 1.5 sq.mm copper wire for lights points includingmodular switch sockets & all accessories. |
68 | Supply fixing and commissioning of power points for server racks including 32 A 3 pin industrial socket |
69 | Supply Installation testing commissionong of chemical earthing with 17.5 sq.mm. copper bonded pipe for electrod, chemical compund as per ISI, Chamber High duty Polycarbonet cover etc. |
70 | Supply and fixing of 25 x 6 mm G.I Strip for |
71 | Earh Bus bar box with copper strip |
72 | 10 sqmm single core cable for DGs earthing, UPS earting and server Rack earthing |
73 | Light Point wiring with 3 x 1.5 sqmm copper flexible wire and PVC conduit with modular switch & accessories |
74 | Light fixture 36W 2ft x 2 Ft LED tupe |
75 | Occupency Sensor |
76 | Cable tray and raceway : |
77 | 300 x 50 mm Ladder G.I cable tray with support arrangement |
78 | 200 x 50 mm G.I perforated cable tray with support arrangement ( Power ) |
79 | 200 x 50 mm G.I perforated cable tray with support arrangement ( Data) |
80 | MS structural Steel for cable tray support and Panel Base Frame |
81 | Supply & Laying of Anti static rubber mate 1.1 kv tested for electrical room as per ISI |
82 | Shock Treatment chart |
83 | First Aid Box |
84 | Cost for devloping of all GFC & As built drawings as per recomendated size encluding design . |
85 | UPS 3x20 KVA ModulerUPS with 30 mins battery backup and all accessaries (expandable upto 4x20 kva) |
86 | Precision AC for Server Room - Supply of Variable speed DC brushless Inverter compressor based Precision Air Conditioning Units; with totallyDouble skin side panels with min 15mm 32 Kg/ cum PU sheet internal insulation , Bottom discharge type complete with dynamically balanced fan driven by Electronically Commutated (EC) motor, hydrophilic coated slant/flat cooling coil. The unit shallbe equipped with high efficiency filters(G4) of minimum 100mm thick, micro processor based programmable logic controller,Liquid receiver, Oil Separator, LLSV, NRV, SS drain tray with nitrile rubber insulation ,AL strip Heater & modulating Electrode steam Humidifier etc. Factory performance Testing (FAT) shall be carried in presence of Customer’s Representative. PAC should have provision for connecting separate input power of UPS power for fans and controller; Raw power for other components. 10.5TR NET Sensible Capacity@ 7000 CFM at 25 Pa ESP ; based on Returnair conditions: 35 +/-1 Deg. C, RH 25% and ambient temperature |
87 | G I hard drawn drain piping |
88 | Supply, installation, testing & commissioning of GI class ‘B’ cut to required lengths and installed with all screwed joints, and providing and fixing in position with the necessary elbows, tees and reducers as per specifications. It shall be insulated with 9 mm thk nitrile rubber insulation. Humidifier Piping (assumption of 40 RMT/unit) 25mm dia all complete as required. |
89 | Supply, Lifting, shifting, & Installation ofMS Stands for indoor PAC units with rubber pads. The frame shall be painted with one coat of metal primertwo coats rust proof Epoxy Paint. The stand shall be Height adjustable type ± 25mm for Server Room stands all complete as required. |
90 | REFRIGERANT PIPING: Hard copper piping (7/8" Liquid + 1 1/8" Gas) along with closed cell elastomeric nitrile rubber insulation. Refrigerant pipe cost shall incude required neccessary supporting arrangement of hanging , wall fixed type. cost of wall chasing/ breaking and finish, etc all complete as required. |
91 | Refrigerant gas R410A all complete. |
92 | Refrigerant Oil all complete as required. |
93 | Supply, Laying, installation, Testing & Commissioning of Interconnection cable(3C X2.5 SQ MM, Armoured Cable) between Indoor & Outdoor unitsall complete. |
94 | Seq CAT6 cable for multiple Indoor units all complete. |
95 | Supply & Installation of MS Stands for outdoor PAC condenser units with rubber pads. The frame shall be painted with one coat of metal primer and two coats rust proof Epoxy Paint all complete. |
96 | Providing and Fixing of Fire Sealant to close the cut-outs of Cables, refrigerant pipes and tray all complete as required. |
97 | Copper piping with electrical wirings for the above |
98 | IT Hardware Requirement at DR Site: Blade Server AC2 Chassis with fans (As per details specification shared seperately |
99 | Blade With 02 CPU, 1TB Memory, 2*960GB SSD |
100 | SAN Switch : 16G FC switch, w/ 48 active ports + 16G SW SFPs |
101 | Certificate Server/Rack Server |
102 | Desktop Computer set |
103 | L3 Switch 48 port |
104 | L2 Switch |
105 | Router |
106 | IT Software Requirement at DR Site: Red Hat Cloud Infrastructure, Premium (2-sockets with guest OS) open Stack with Smart Management |
107 | High Availability for Unlimited Guests |
108 | VMware vCloud Suite Subscription- per CPU per year Commitment Plan - 60 month Prepaid + Vcentre 1 Nos |
109 | EMS Software per device/VM for 5 years |
110 | Deep Security - Enterprise - per Server (VM) for 5 years |
111 | Redhat Enterprise Linux Standard for virtual Datacentres with 1 Yr Standard Subscription for 5 years |
112 | SAN Storage Capacity Requirement at DR Site: HPE SAN Storage( Primera 650) with 650 TB (NL SAS)+ 50 TB SSD |
113 | NetApp SAN Storage (AFF-A700) with 430 TB (NL SAS) + 100 TB SSD features mentioned below |
114 | Enterprise Firewall as per specification mentioned/Equivalent |
115 | 24 Port (all) PoE+(190W) switch with 2 SFP uplink ports for CCTV |
116 | 10M HDMI CABLE. |
117 | Performance Lite 2 MP IP Eyeball Camera Fixed lens. |
118 | CAT 6 Cable |
119 | Performance Lite 2 MP IP Bullet Camera Fixed lens. |
120 | H265 4K 32CH NVR NO POE. |
121 | Conduit 25 mmm PVC |
122 | 49" Colour Monitor Industrial duty |
123 | 9 U Network Rack |
124 | 2 door access Controller |
125 | Supply of SMPS for Door Controller. |
126 | Supply & Installation of Door controller Enclosour. |
127 | Biometric Reader |
128 | Card Reader |
129 | Supply of "L" and "U" Bracket. |
130 | Double Door EM Lock 600 lbs with LED |
131 | Z bracket for 600lbs EM Lock. |
132 | 600lbs electromagnetic lock unmonitored type 12V LED Lamp Only for Singleleafe door. |
133 | MAGNETIC CONTACT 2 WIRE. |
134 | Supply of ACS Workstation Intel® Quad Core, 2.8GHz or higher, 8 GB RAM, 100 GB free disk space, Dual Ethernet 10/100MBs, Software Requirements: * Microsoft Windows 10 (Enterprise) 64-bits * Microsoft .NET Framework v4.0 |
135 | Exit Button 3 inches X 1 inch. |
136 | Smart Access Card |
137 | Access Control software |
138 | Supply Installation Testing & Commissioning of addressable Optical Smoke Detector, Smoke Detection by : Photo-electric light scattering. |
139 | Supply Installation Testing & Commissioning of addressable Heat Detector, Detection Technology : Thermistor / ROR |
140 | Supply Installation Testing & Commissioning of Addressable Manualcall point with built in isolator and DIL switch for Address Setting |
141 | Supply Installation Testing & Commissioning of The Loop Powered 100 dB Sounder Base with Beacon |
142 | Supply Installation Testing & Commissioning ofAddressable Control Module |
143 | Supply Installation Testing & Commissioning ofAddressable Monitor Module |
144 | Supply Installation Testing & Commissioning ofAddressable Isolator module |
145 | Supply Installation Testing & Commissioning of 2 Loop Fire Alarm Panel with 126 Addresses per Loop, Battery and accessories as per requirement. Battery Back-up |
146 | 2 core x 1 sqmm Copper Flexible FRLS Cable |
147 | 20 mm PVC Conduit |
148 | ABC Type Fire Extingusher 5 Kg |
149 | SITC of short wavelength laser based ultra high sensitive aspiration smoke detector with resolution of 0.00006% obs/ft (0.0002% obs/m,), 4 pipe inlets, shall support minimum 100 meters pipe length per pipe inlet with cumulative pipe length up to 550 meters for one single detector, 4 alarm levels, optional auto cleaning mechanism for detection chamber, on-board dual stage filter with memory, built-in event memory of 20000 events, pipe wise 4 stage flow monitoring, LED indications for alarm and fault conditons. Detector shall support as an inbuilt colour touch screen 3.5" display for status monitoring including smoke level bar graph, analytics to determine nature of sampled airborne particles (dust, diesel & PVC wire burning), connectivity using RS485 & TCP/IP, Wi-Fi support for monitoring using smart phones, connection of additional displays for remote monitoring. |
150 | SITC of Power Supply units - Power supply unit with 110/230VAC input and 18 to 29VDC output. The power supply unit has the following indications: OK - Green LED and Fault - Yellow LED Power supply unit should have capacity to operate on battery backup in case of AC mains failure & should have built in charging circuit for batterys. |
151 | SITC of Trunk Adaptor, Capillary Tube Connector, Capillary Tube, Capillary Sampling Point, Sampling point label red (complete set) for air sampling in room voids for area having false ceilings. |
152 | SITC of Sampling Pipe having Smooth bore PVC Pipe 25mm Outer Dia & 19 to 21mm Inner Dia with all required accessories. |
153 | Supply, Installation,Testing and Commissioning of 2 ZONE Water Leak Detection Panel (for server Room and Electrical Room) |
154 | Water Leak detection Cable Sensor – 25 mtrs |
155 | Electronic Hooter |
156 | SITC of 2 x 1.0 sq mm screened copper flexible cable |
157 | SITC of Main Rodent Controller suitable to connect 24 Satelites @ 300sft at room area and 150 at ceiling and floor area.Server Room |
158 | SITC of Satellite Stations / Transducers covering |
159 | Cable and Conduits |
160 | 2 core 1 sq.mm Cu. Flexible Shielded cable @ 275 meter each coil |
161 | 20 mm PVC Conduit |
162 | Console |
163 | Stand Brackets |
164 | 120 ltrs Tank and valve assembly with solenoid actuator, straps Empty (fill 60 - 100 Kgs.) |
165 | Fire Suppression Fluid Novec1230, OEM Factory Fill per KG |
166 | Cylender Accessories |
167 | Cylinder strap |
168 | Pneumatic Actuator Shipping assembly |
169 | Local Manual actuator |
170 | Flexible discharge Hose -49 mm / SWIVEL ADAPTOR |
171 | Flexible Actuation Hose / Pilot hose |
172 | Nozzles, Brass drilled -360/180 deg throw selection |
173 | LED type display sign board flashing with inbuilt Sounder “EVACUATE GAS RELEASED” & “DO NOT ENTER” |
174 | 49 mm MANIFOLD CHECK VALVE |
175 | PRESSURE SWITCH - DPST |
176 | MANUAL RELELASE SWITCH |
177 | ABORT SWITCH |
178 | M.S. Seamless pipes as per ASTM A 106 Gr. B, schedule 40 with necessary Fittings & Hangers. |
179 | 2 WAY MANIFOLD |
180 | MS Channel support |
181 | Gass Release Panel |
182 | Cross Zoning Detector |
183 | Hooter with strobe 100 DB |
184 | BUILDING MANAGEMENT SYSTEM APPLICATION |
185 | 6KVA online UPS with 20 minutes backup |
186 | Structured cabling & Server racks: 10 M Cat 6 Cable |
187 | 15 M Cat 6 Cable |
188 | 25 M Cat 6 Cable |
189 | Cat-6 UTP Cable Roll of 305 Mtrs |
190 | 12MTP/F-12MTP/F Trunk Cable, OM4, LSZH, 15m, polarity Reversed, Low-Loss |
191 | 12MTP/F-12MTP/F Trunk Cable, OM4, LSZH, 25m, polarity Reversed, Low-Loss |
192 | LC-LC Fiber Duplex Patch Cord OM4 Multimode-3 Meter |
193 | LC-LC Fiber Duplex Patch Cord OM4 Multimode-5 Meter |
194 | 24 Core Fiber Cassette (MPO) AB/BA Pair Flipped 24 Core fiber MPO LC Cassette, Pair Flipped AB/BA, Multi-Mode |
195 | Trunk Cable (MPO-MPO) 25Meter MPO-MPO Trunk Male cable, 12 Fiber straight, 50.125 OM4 LSZH Multimode |
196 | Trunk Cable (MPO-MPO) 15Meter MPO-MPO Trunk Male cable, 12 Fiber straight, 50.125 OM4 LSZH Multimode |
197 | DR Site Installation, Commissioning & System Integration Charges |
198 | Server Rack - Supply, Installation, Testing & Commissioning of 42U Server Cabinet Extruded Aluminium Profile frame with top panel;having static load bearing capacity of 1300 Kg as per Tender specifications. . Dimensions: 2200mm x 800mm x 1200mm all complete as required and as per detailed specifications. Racks, PDUs, containment should be from same OEM |
199 | Network Rack with PDU |
200 | Manpower Requirement for 24x7 Support: BMS Person -3 persons for 5 years |
201 | IT - L1/L2- 2 persons for 5 years |
202 | Dedicated DC-DR Link & ILL - 500 Mbps DC-DR LC with 1 Year ARC |
203 | 100 Mbps ILL for with 1 Year ARC |
204 | Providing of 2 Nos physical security for SDC.FY-23-24 |
205 | Providing of 2 Nos physical security for SDC.FY-24-25 |
206 | Providing of 2 Nos physical security for SDC.FY-25-26 |
207 | FM Cost for 5 Years as per requirement mentioned in existing DCO terms & conditionsFY-23-24 |
208 | FM Cost for 5 Years as per requirement mentioned in existing DCO terms & conditionsFY-24-25 |
209 | FM Cost for 5 Years as per requirement mentioned in existing DCO terms & conditionsFY-25-26 |
210 | AMC/Support Cost for lT (software and hardware) equipmentFY-23-24 |
211 | AMC/Support Cost for lT (software and hardware) equipmentFY-24-25 |
212 | AMC/Support Cost for lT (software and hardware) equipmentFY-25-26 |
213 | AMC/Support Cost for Non-lT Equipment (2nd Floor)FY-23-24 |
214 | AMC/Support Cost for Non-lT Equipment (2nd Floor)FY-24-25 |
215 | AMC/Support Cost for Non-lT Equipment (2nd Floor)FY-25-26 |
216 | AMC/Support Cost for Non-lT Equipment (1st Floor)FY-23-24 |
217 | AMC/Support Cost for Non-lT Equipment (1st Floor)FY-24-25 |
218 | AMC/Support Cost for Non-lT Equipment (1st Floor)FY-25-26 |
219 | AMC/Support Cost for PAC, UPS, Panel & DG. (1st Floor))FY-23-24 |
220 | AMC/Support Cost for PAC, UPS, Panel & DG. (1st Floor))FY-24-25 |
221 | AMC/Support Cost for PAC, UPS, Panel & DG. (1st Floor))FY-25-26 |
222 | Cost of dedicated Operation and AMC Support for RSA SIEM for WBSDC through L2 Level EngineerFY-22-23 |
223 | Cost of dedicated Operation and AMC Support for RSA SIEM for WBSDC through L2 Level EngineerFY-23-24 |
224 | Cost of dedicated Operation and AMC Support for RSA SIEM for WBSDC through L2 Level EngineerFY-24-25 |
225 | Cost of dedicated Operation and AMC Support for RSA SIEM for WBSDC through L2 Level EngineerFY-25-26 |
226 | AMC/Support Cost for UPS batteries for 2 years (4th & 5th years), post initial 3 years warranty period for 204 cells of 2v/357ahFY-23-24 |
227 | AMC/Support Cost for UPS batteries for 2 years (4th & 5th years), post initial 3 years warranty period for 204 cells of 2v/357ahFY-24-25 |
228 | AMC/Support Cost for UPS batteries for 2 years (4th & 5th years), post initial 3 years warranty period for 204 cells of 2v/357ahFY-25-26 |
229 | Professional Support Services for one Database and one System Administrators with effect from 1.4.2022FY-22-23 |
230 | Professional Support Services for two Database and two System Administrators with effect from 1.4.2022FY-23-24 |
231 | Professional Support Services for three Database and three System Administrators with effect from 1.4.2022FY-24-25 |
232 | Professional Support Services for three Database and three System Administrators with effect from 1.4.2022FY-25-26 |
233 | Vodafone/other ISP 1000 Mbps ILL for WBSDC for 1 year upto 31.03.2022FY-21-22 |
234 | Vodafone/other ISP 1000 Mbps ILL for WBSDC for 1 year upto 31.03.2023FY-22-23 |
235 | Vodafone/other ISP 1000 Mbps ILL for WBSDC for 1 year upto 31.03.2024FY-23-24 |
236 | Vodafone/other ISP 1000 Mbps ILL for WBSDC for 1 year upto 31.03.2025FY-24-25 |
237 | Vodafone/other ISP 1000 Mbps ILL for WBSDC for 1 year upto 31.03.2026FY-25-26 |
238 | AMC & UPGRADE of old SDC cloud servers (4)FY-22-23 |
239 | AMC & UPGRADE of old SDC cloud servers (4)FY-23-24 |
240 | AMC & UPGRADE (30 to 75TB) of Dell VTL of old SDC cloud system period from 1/4/2022 to 31/3/2023FY-22-23 |
241 | AMC of upgraded Dell VTL of old SDC cloud system period from 1/4/2023 to 31/3/2024FY-23-24 |
242 | AMC & UPGRADE (75 to 100TB) of Dell VTL of old SDC cloud system period from 1/4/2024 to 31/3/2025FY-24-25 |
243 | AMC of upgraded Dell VTL of old SDC cloud system period from 1/4/2025 to 31/3/2026FY-25-26 |
244 | AMC / ATS & UPGRADE (from 40 to 60TB) of Commvault Backup System from 2023FY-23-24 |
245 | AMC / ATS (60TB) of Commvault Backup System from 2023FY-24-25 |
246 | AMC / ATS (60TB) of Commvault Backup System from 2023FY-25-26 |
247 | AMC of WBSDC new cloud (blade) servers - lot oneFY-23-24 |
248 | AMC of WBSDC new cloud (blade) servers - lot oneFY-24-25 |
249 | AMC of WBSDC new cloud (blade) servers - lot oneFY-25-26 |
250 | AMC of Netapp SAN storage (430 TB) for the period from 2023FY-23-24 |
251 | AMC of Netapp SAN storage (430 TB) for the period from 2023FY-24-25 |
252 | AMC of Netapp SAN storage (430 TB) for the period from 2023FY-25-26 |
253 | AMC of WBSDC new network (SDN) infrastructureFY-23-24 |
254 | AMC of WBSDC new network (SDN) infrastructureFY-24-25 |
255 | AMC of WBSDC new network (SDN) infrastructureFY-25-26 |
256 | AMC & UPGRADE of RedhatOpenstack Cloud Software License SA for FY-23-24 |
257 | AMC & UPGRADE of RedhatOpenstack Cloud Software License SA for FY-24-25 |
258 | AMC & UPGRADE of RedhatOpenstack Cloud Software License SA for FY-25-26 |
259 | Renewal of RSA Software Product Licenses with OEM support for 1 yearFY-22-23 |
260 | Renewal of RSA Software Product Licenses with OEM support for 1 yearFY-23-24 |
261 | Renewal of RSA Software Product Licenses with OEM support for 1 yearFY-24-25 |
262 | Renewal of RSA Software Product Licenses with OEM support for 1 yearFY-25-26 |
263 | SOAR (Security Orchestration Automation Response) Software License RenewalFY-24-25 |
264 | SOAR (Security Orchestration Automation Response) Software License RenewalFY-25-26 |
265 | DDOS 10Gbps additional 1 Years subscriptionFY-24-25 |
266 | DDOS 10Gbps additional 1 Years subscriptionFY-25-26 |
267 | DC Augmentation - Installation, Commissioning & System Integration Charges |
268 | Deep Security Enterprise Software License - additional 150 VMs for 2 years during FY-21-22 |
269 | Deep Security Enterprise Software License - additional 50 VMs for 1 years & License renewals for all existing licenses during FY-22-23 |
270 | Deep Security Enterprise Software License - additional 50 VMs for 1 years & License renewals for all existing licenses for yearFY-23-24 |
271 | Deep Security Enterprise Software License - additional 50 VMs for 1 years & License renewals for all existing licenses for yearFY-24-25 |
272 | Deep Security Enterprise Software License - additional 50 VMs for 1 years & License renewals for all existing licenses for yearFY-25-26 |
273 | EDB Postgres Enterprise License CPU Core support renewal / upgrade - Production Support (including Replica DB servers)FY-21-22 |
274 | EDB Postgres Enterprise License CPU Core support renewal / upgrade - Production Support (including Replica DB servers)FY-22-23 |
275 | EDB Postgres Enterprise License CPU Core support renewal / upgrade - Production Support (including Replica DB servers)FY-23-24 |
276 | EDB Postgres Enterprise License CPU Core support renewal / upgrade - Production Support (including Replica DB servers)FY-24-25 |
277 | EDB Postgres Enterprise License CPU Core support renewal / upgrade - Production Support (including Replica DB servers)FY-25-26 |
278 | VMware vCloud Suite Subscriptionper CPU 20 CPUs Commitment Plan - 12 month Prepaid with supportFY-22-23 |
279 | VMware vCloud Suite Subscriptionper CPU 20 CPUs Commitment Plan - 12 month Prepaid with supportFY-23-24 |
280 | VMware vCloud Suite Subscriptionper CPU 20 CPUs Commitment Plan - 12 month Prepaid with supportFY-24-25 |
281 | VMware vCloud Suite Subscriptionper CPU 20 CPUs Commitment Plan - 12 month Prepaid with supportFY-25-26 |
282 | DC-DR LC & ILL ARC for DR SiteFY-22-23 |
283 | DC-DR LC & ILL ARC for DR SiteFY-23-24 |
284 | DC-DR LC & ILL ARC for DR SiteFY-24-25 |
285 | DC-DR LC & ILL ARC for DR SiteFY-25-26 |
286 | Capacitor Bank change of old UPSFY-21-22 |
287 | Capacitor Bank change of old UPSFY-24-25 |
288 | Electrical Earth Pit Repair / ReconstructionFY-22-23 |
289 | DG Repair / Replacement due to aging / obsolescenceFY-22-23 |
290 | DG Repair / Replacement due to aging / obsolescenceFY-24-25 |