Construction C / O Wht 4 Nos Near L / O M Yousuf Mir, Farooz Ah Sofi , M Yousuf Chopan And M Rafiq Mir At Lawnard Halqa Hanjura C / O Wht 4 Nos Near L / O M Yousuf Mir, Farooz Ah Sofi , M Yousuf Chopan And M Rafiq Mir At Lawnard Halqa Hanjura, Hanjura Sursyar Budgam-Jammu And Kashmir
TDR : 30170024
Tender Notice
BOQ
Expired
Hanjura Sursyar Budgam
Jammu And Kashmir
Construction C / O Wht 4 Nos Near L / O M Yousuf Mir, Farooz Ah Sofi , M Yousuf Chopan And M Rafiq Mir At Lawnard Halqa Hanjura C / O Wht 4 Nos Near L / O M Yousuf Mir, Farooz Ah Sofi , M Yousuf Chopan And M Rafiq Mir At Lawnard Halqa Hanjura
Name: Construction of WHT(4No) near land of Mohd Yusuf Mir,Ferooz Ahmad sofi,Mohd Yousuf Chopan and Mohd Rafiq Mir at Lavnad Halqa Hanjura
Sl. No.
Item Description
1
Road
2
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed,all kinds of soils.lead 25 m from cutting edge.
3
Providing andlaying of Stone Solling duly hand packedincluding ramming, watering ,complete job.
4
Centering and shuttering including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
5
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
6
12mm Cement plaster of mix in 1 : 4 ( 1 cement : 4 coarse sand)
7
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm lengthand drilling holes upto 10 mm dia. etc. complete.
8
Carriage of cementfor 13Kms average lead from Source to site of work
9
Carriage of Stone Aggregatefor 13 Kms average lead from Source to site of work
10
Carriage of Sand for 20 Kms average lead from Source to site of work
11
Carriage ofBoulders for 13 Kms average lead from Source to site of work
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.