Name of work : Special Repairs to the Government Roads in Arni (H), C&M Sub-DivisionRoad A: Special Repairs to Kalavai - Valapandal Road at Km 21/6 - 23/0Road B: Special Repairs to Kalavai - Valapandal Road at Km 23/2 - 24/8
Sl. No.
Item Description
1
Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces. MORTH No.111,112,501,503,900
2
Road A
3
Road B
4
Bituminous Macadam (Table - 500-10) - (Providing and laying Bituminous Macadam with Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic Paver Finisherto the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per Clause 505 MORT&H Rev-V) - Grading II. MORTH No.111,112,501,505,900
5
Road A
6
Road B
7
Bituminous Concrete (Table500-17) Providing and laying bituminous concrete with Hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II MORTH No. 111, 112, 501, 507, 900
8
Road A
9
Road B
10
Excavation for Roadway and drainageExcavation including removal and satisfactory disposal of all materials necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. Formation of embankment using Carted Earth including compaction by power roller with an average lead of 1 km
11
Road A
12
Road B
13
Calculation of SubTotal, GST and Total Amount carried out by system automatically
14
Basic cost of value put to tender as per estimate
15
Add GST at 12%
16
Total Value put to Tender
17
Quoted value
18
Final Quoted Value
19
Add GST at 12% of Final Quoted Value
20
Total Value of Contract Including 12% of GST
21
Basic cost of value put to tender as per Estimate
22
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.