| 1 | Safe loading & carriage including Loading-unloading & proper stocking of following store materials from Electricity Store CenterTripula to site of work. |
| 2 | S.T. Pole 11 Mtr. Long |
| 3 | 11 KV M.S. Top Channel (100x50x6) 2240 mm |
| 4 | 11 KV M.S. Dropper Channel (100x50x6) 2240 mm |
| 5 | 11 kV Disc Insulator45 KN |
| 6 | 11 kV Discfitting 45 KN |
| 7 | Earthing Complete |
| 8 | 11 kV (3 x 185) sqmm XLPE cable |
| 9 | H.S. Cable jointing kit for 11 KV (3 x 185) sqmm cable Outdoor/Indoor type. |
| 10 | 11 KV (3 x 185) sq mm straight through cable Jointing Kit. |
| 11 | 11 kV Fuse set |
| 12 | 11 KV V type cross arm |
| 13 | H.S. Cable jointing kit for 33 kV (3 x 300)/(3x400) sqmm cable Outdoor/Indoor type |
| 14 | 11 KV Pin insulator |
| 15 | 11 KV GI pin with nut |
| 16 | T off channel (100 x 50 x 6) 1300 mm |
| 17 | M.S. Angle (65 x 65 x 6)for brassing with 04 clamp |
| 18 | T/F Base angle set |
| 19 | ACSR Dog conductor |
| 20 | 33 KV disc insulator B&S type 70 KN |
| 21 | Disc fitting 70 KN |
| 22 | 33 KV Stay set (20 X 1800) mm with stay wire, stay clamp, insulator , nut & bolt etc. |
| 23 | 11 KV Stay set (16 X 1800) mm with stay wire, stay clamp, insulator , nut & bolt etc. |
| 24 | 33 KV (3 x 300)/(3x400) sq mm straight through cable Jointing Kit. |
| 25 | 33 KV M.S. Top Channel (125x65x6) 3200 mm |
| 26 | 33 KV M.S. Dropper Channel (125x65x6) 3000 mm |
| 27 | LT Cable 4x120 sqmm |
| 28 | F Clamp |
| 29 | 11 KV TPMO SET |
| 30 | G.I. wire 8/10/16 SWG |
| 31 | 33 kV (3 x 400) sq mm XLPE cable |
| 32 | guarding angle |
| 33 | LT Cable 3.5x400 sqmm |
| 34 | WORK, Labour & Errection Charges:- |
| 35 | Fabrication, erection & painting ofS.T. Pole11 Mtr long of Single pole on ST pole 11 M long with fixing of necessary clamps and other accessories required for erection. |
| 36 | Fabrication, erection & painting of Double pole cable exposure on S.T. Pole11 Mtr long withfixing ofchannel , angle pin & pin insulator,D.O setand making bus bar complete work with earthing by earth rod 20x2500 mm for 11 KV Lineas per RESSPO drawings. |
| 37 | Grouting & Plinthing of single ST pole as per RESPO Norms (0.268 Cum) |
| 38 | Installation of cable box 11 KV (3 x 185) sq mm Outdoor/Indoor |
| 39 | Installation of cable box 33 KV (3 x 300)/ (3x400) sq mm Outdoor/Indoor |
| 40 | Installation of cable box 11 KV straight through (3 x 300) sq mm |
| 41 | Installation of cable box 33 KV straight through (3 x 300)/ (3x400) sq mm |
| 42 | Laying of 11 KV(3 x 185) sq. mm double circuit XLPECable in HDPE pipe PN-6 PE 200/150 mm dia by horizontal deep with drilling method (All materials arranged by the contractor at his own cost except XLPE cable.) |
| 43 | Laying of 11 KV(3 x 185) sq. mm XLPE Cable by digging of trench 1.2 mtr deep vide as per ISS including providing bricks, sand, stone slab the inter exel spacing bettween to cable shoulde be in beettween 0.25 m to 0.40 m as required at site as per RESPO Norms. |
| 44 | Stringing & sagging of three phase 11 KV line on ACSRDog conductor as per RESSPO Norms. |
| 45 | Nozeling & groutingof 11 KV stay set complete.(All the civil material will be be provided by Contractor) |
| 46 | Nozeling & groutingof 33 KV stay set complete.(All the civil material will be be provided by department.) |
| 47 | Placement of 11/0.4 KV T/Fs on S/S Type D/P&installation, commissioning of 25 KVA to 100 KVA T/Fincluding cost of L-pieces and lugs jumpering with the system with painting as per RESSPO norms.( Alltherequired martial for abovejob shall be provided by contractor except T/Fs) |
| 48 | High Pressure testing of 33 KV & 11 KV XLPE cable. Testing equipment will be arranged by the contractor. |
| 49 | 33 KV cable |
| 50 | 11 KV cable |
| 51 | Dismantling of 11KV line, L.T. lines & distribution boxes and its dump at suitable place on site up to completion of work and its safe loading/unloading/weighing carriage from dump site to je\"s store/ESC Raebareli(Except broken PCC Pole). |
| 52 | ST Pole 11 Mt Long/PCC pole |
| 53 | ACSR mix conductor |
| 54 | Steel scrape |
| 55 | Stringing & sagging of three phase 4 wire LT line on ACSRDog conductor as per RESSPO Norms. |
| 56 | Laying of 33 KV(3 x 300)/ (3x400) sq. mm double circuit XLPECable in HDPE pipe PN-6 PE 200/150 mm dia by horizontal deep with drilling method (All materials arranged by the contractor at his own cost except XLPE cable.) |
| 57 | Laying of LT Cable(3.5 x 400)sq. mm double circuit XLPECable in HDPE pipe PN-6 PE 200/150 mm dia by horizontal deep with drilling method (All materials arranged by the contractor at his own cost except XLPE cable.) |
| 58 | Following Metarials are provided by contractor |
| 59 | Nut and bolt off size |
| 60 | PG clamp |
| 61 | Stone Pad |
| 62 | Number Plate |
| 63 | Danger Board with clamp |
| 64 | G.I. barbed wire |
| 65 | Alumineum Binding wire 6 SWG |
| 66 | Aluminium Paint |
| 67 | Red Oxide paint |
| 68 | G.I. Pipe 8 inch |
| 69 | G.I. Pipe 6 inch |
| 70 | LT Clamp for STP |
| 71 | Earthwire clamp with Nut and bolt |
| 72 | LT Shackle Insulator |
| 73 | Loop Guard complete 3 Phase |
| 74 | Aluminium JointingSleevs for conductor |
| 75 | LT PVC Spacer |
| 76 | LT incomming panel with metering equipment and fixing arrangment |
| 77 | X-arm holding clamp/ LT clamp/Top/Dropper/T Off with bolt & nut for STP |
| 78 | HDPE Pipe 160 mm PN 12.5 (SDR 11) for underground (6 inch dia)( double circuit) |