Supply Supply , 1- Supply, Installation, Earthing, Cable Laying / Termination, Testing & Commissioning Of 80 Bhp Output, 04 Cylinders Diesel Engine 415V, 50 Hz 3 Phase, 4 Wire, 1500 Rpm, 0.8 P.F., Outdoor Type 62.5 / 63 Kva Silent Dg Set Confir
Tender Overview
Project Description
Supply Supply , 1- Supply, Installation, Earthing, Cable Laying / Termination, Testing & Commissioning Of 80 Bhp Output, 04 Cylinders Diesel Engine 415V, 50 Hz 3 Phase, 4 Wire, 1500 Rpm, 0.8 P.F., Outdoor Type 62.5 / 63 Kva Silent Dg Set Confirming To Latest Revision Of Bs 5514 For Engines And Ms 5000 For Alternator ( As Per Specification, On Cement Concrete Foundation With Required No. Of Anti-Vibration Footing To Prevent Transfer Of Vibration To The Foundation & Structure Which Is To Be Made By The Firm ) The Above Shall Comprise Or Mentioned Below Complete With All Accessories Like : ( A ) Fuel Tank ( B ) Battery With Leads ( C ) Control Panel Including Power Board ( D ) Residencial Silencer ( E ) First Fill Of Lube Oil ( F ) Avm Pads ( G ) Accostic Enclosure ( Desined To Meet Stringguard Latest Moef / Cpcb-Ii Norms ) ( H ) Side Canopy ( I ) Inter Connecting Cables ( J ) Fuel / Coolent / Exhaust Pipes ( K ) Anti Vibration Mountings ( L ) Foundation ( M ) Piping And Pumping Work Required For Fuel System Including All Accessories.
BOQ
| Sl. No. | Item Description |
| 1 | 1- Supply, Installation, Earthing, Cable Laying/Termination, testing & commissioning of 80 BHP output, 04 cylinders diesel engine 415V, 50 Hz 3 Phase, 4 wire, 1500 RPM, 0.8 P.F., Outdoor type 62.5/63 KVA silent DG set confirming to latest revision of BS 5514 for Engines and MS 5000 for Alternator (as per specification, on cement concrete foundation with required no. of anti-vibration footing to prevent transfer of vibration to the foundation & structure which is to be made by the firm) the above shall comprise or mentioned below complete with all accessories like :(a) Fuel Tank(b) Battery with leads(c) Control Panel including power board(d) Residencial silencer(e) First Fill of Lube oil(f) AVM Pads(g) Accostic enclosure (desined to meet stringguard latest MOEF/CPCB-II norms)(h) Side Canopy(i) Inter connecting cables(j) Fuel/Coolent/Exhaust Pipes(k) Anti Vibration Mountings(l) Foundation(m) Piping and pumping work required for fuel system including all accessories. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed