Construction C / O Packing And Grading Shed At Kangra, Distt. Kangra H.P. C / O Packing And Grading Shed At Kangra, Distt. Kangra H.P.
Tender Value
14.83 Lakhs
Estimated cost
Bid Submission
16 Dec 2021
0 days left
EMD
29700
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kangra → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction C / O Packing And Grading Shed At Kangra, Distt. Kangra H.P. C / O Packing And Grading Shed At Kangra, Distt. Kangra H.P.
BOQ
| Sl. No. | Item Description |
| 1 | Excavationin foundation trenches etc. in earth work in all heights anddepth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chisellingand wedging out of rock (where blasting is prohibited) andtheir intermediate classificationof soilsincluding, dewatering wherever required, settingout to required lines,levels as shown on the drawing and directed by the Engineer -in-Charge at site. according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and un- useful material and transportation of the un -useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site (to be arranged by the contractor) satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour ,machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required ). |
| 2 | Providing and laying cement concrete 1:4:8 (One cement: Four sand :Eight graded cursed/broken stone aggregate 40mm) (forty millimeters nominal size) mechanically mixed and curing complete, excluding cost of form work in foundation and plinth including carriage of materials through all modes of transportion with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. |
| 3 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters) thick,welded with angle iron in frame30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete workin foundation, footing, basis of column etcetra . and massconcrete complete as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 4 | Providing steel workwelded in built up sections/hollow section intrusses and framed work, including cutting,hoisting , fixing in positionand applying a priming coat of red lead paint complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.a) In Single stanchions composed of rolled steel joists or channels with caps, bases splices, angles brackets etc. |
| 5 | Providing steel work of TATA, SAIL or RASHTRIYA ISPAT welded in built up sections/hollow section intrusses and framed work, including cutting,hoisting , fixing in positionand applying a priming coat of red lead paint complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. a) In trusses and trussed purlings in buildings |
| 6 | Providing and fixing 0.60mm thick prepainted steel sheet of TATA Durashine in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia metre with prepainted limpet and rubber washers complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 7 | Providing and fixing ridges or hips 60 cm overall with 0.60mm thick prepainted steel sheets of TATA Durashine in roofing with hot dipped metalic zinc coated sheets with top coat of regular modified polyster organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts & nuts 6mm dia & prepainted G.I. limpet and bitumen washerscomplete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 8 | Stone fillingunder floor dry hand packed with hard stone of approved quality consolidated properly with hand or mechanical hammer to required level as perHP.PWD specification 1990 Volume-1 including carriage of materials, labour tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 9 | Providing and laying mirror polished Kota stone slab flooring 25 mm (twenty fivemilimeter) (table rubbed and polished)of size 550x550mm(five hundred fifty into five hundred fifty milimeter) (average) thick base of cement mortor 1:4 (one cement :foursand) laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab. including rubbing and polishing complete.treling the surface with bee wazas per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. |
| 10 | Providing 15 mm cement plaster in single coat on fair side of brick/concrete walls for internal /external plastering in all floor level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80 mm in girth and finished even and smooth. Cement mortar 1:6 (One cement : Six sand) including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. |
| 11 | Painting two costs (excluding priming cost on new steel and other metal surfaces with enamel paint other than white brushing to give an even shade including cleaning the surface of all dirt,dust and other foregin matter paint complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 12 | Finishing wallwith weather proof exterior gradeemulsion of approved design (Apexultima) of Asian paints/Nerolac paints or its equarlied brand and manufacture ofapproved shadeon undecorated concrete / stone / plastered wall surfaces with two coats to give an even shade andfinal finish afterthoroughly cleaning / brushing the surfaces free from alldirt, dustmortar dropping and other foreign matter and sand papered smooth including applyingof puttyas required for making the surfaces upto all floor levelcompleteas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the govt. |
| 13 | Providing Tor steel reinforcement of TATA Tiscon/SAIL/Rashtria Ispat incluiding cost of binding wire for R.C.C. work including cutting, bending, binding and placing in position complete in all floor levels inall heights including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge. |
| 14 | Providing and laying mechanically mixed and vibtated cement concrete1:1.5:3 (1cement :1.5 sand :3 graded stone aggregate 20mm. nominal size) and curing complete excluding cost of form work and inforcement for reinforced concrete work including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge. Foundation footings bases of columns and the like and mass concrete |
AI Tender Summary
Tender Timeline
Dec 02, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedDec 16, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 18, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender