South Eastern Coalfields Limited-SECL has published Assistance In Major Shutdown / Preventive / Breakdown Mechanical Maintenance Works At Various Locations Of Surface Conveyors, 20, 000 Te. Bunker And Trs Sections Of New Chp For A Period Of 365 Days On As And When Required Basis At Kocp. Assistance In Ma. Submission Date for this Tender is 18-12-2021. Mechanical engineering Service Tenders in CHP KUSMUNDA PROJECT Chhattisgarh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Scope/Nature of Work:-1. The work will be taken up as and when required basis on a very short notice subjected to availability and shutdown of circuits.2. The Welding electrode, industrial gas, other consumables will be provided by the department. 3. The working site may be dusty & mucky.4. For installation of drive units/other sub-assembling, desired preparation should be done.5. Work should be carried out as per existing design. 6. The repairing/maintenance work carried out on site will be as per instruction of Engineer I/C.7. All tools, tackles & safety standards to engaged personnel will be provided by the Contractor. |
2 | Dismantling/disassembling/handling job in major shutdown/ preventive/ breakdown mechanical maintenance works:- Dismantling/ lowering of counter weights, dismounting of idlers and idler frames, pulling of damaged/ existing steel cord belt/ Nylon-Nylon belt, dismantling and disassembly of damaged assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take up units etc. and other allied works at various locations of surface conveyors, bunker & TLS sections of New CHP. |
3 | Assembling/ Installation/handling job in major shutdown/ preventive/ breakdown mechanical maintenance work:- Handling of counter weights, mounting of idlers and idler frames, laying/ placing/ positioning of new steel cord/ Nylon-Nylon belt, re-installation/ re-erection, setting of new/ repaired assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take up units etc. & other allied works at various locations of surface conveyors, bunker & TLS sections at New CHP. |
4 | Total impact of GST for the purpose of CTC |