Bids Are Invited For Fuel Oil Centrifuge No 1 Fuel Oil Centrifugemake; Alfa Lavalmodel; Mopx 207 Nc1 Capacity; 7400 Ltr/Hr - (A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Fuel Oil Centrifuge No 1 A - Inlet-Goa

Department of Defence Production has published Bids Are Invited For Fuel Oil Centrifuge No 1 Fuel Oil Centrifugemake; Alfa Lavalmodel; Mopx 207 Nc1 Capacity; 7400 Ltr/Hr - (A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Fuel Oil Centrifuge No 1 A - Inlet. Submission Date for this Tender is 09-02-2022. Footwears Tenders in Goa. Bidders can get complete Tender details and download the document.




Tender Notice

30104669
Corrigendum : Bids Are Invited For Fuel Oil Centrifuge No 1 Fuel Oil Centrifugemake; Alfa Lavalmodel; Mopx 207 Nc1 Capacity; 7400 Ltr/Hr - (A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Fuel Oil Centrifuge No 1 A - Inlet
Open Tender
Indian
Goa
09-02-2022

Tender Details

Bids Are Invited For Fuel Oil Centrifuge No 1 Fuel Oil Centrifugemake; Alfa Lavalmodel; Mopx 207 Nc1 Capacity; 7400 Ltr/Hr - (A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Fuel Oil Centrifuge No 1 A - Inlet Device (B) Replace The Flow Indicator If Clogged. Clean The Sight Glass. (C) Replace The Reducing Valve Cone.(D) Replace The Non-Return Valve Cone. , Fuel Oil Centrifuge No 1 B - Dismantle And Examine Separator Bowl Assembly Throughly. Clean All Components And Check Following:-(E) Check Disc Stack Pressure.(F) Check For Corrosion, Erosion And Cracks.(G) Galling Of Guide Surface.(H) Renew Oil In Gear Housing. (J) Replace Worm Wheel And Worm.(K)Check Height Position For Pairing Disc. Renew Frame Feet Rubber Cushions/Vibration Dampers.(L)Clean And Check Spring And Brake Shoe. Renew Friction Pad/ Brake Plug.(M) Clean And Check Friction Coupling. Renew Friction Pads And Lipseal Ring , Fuel Oil Centrifuge No 1 C - Horizontal Drive(N)Check Axial Play Of Coupling Disc.(P)Renew Bearings Of Worn Wheel Shaft. , Fuel Oil Centrifuge No 1 D - Vertical Drive (Q)Clean And Check Bowl Spindle And Nave For Impact. , Fuel Oil Centrifuge No 1 E - (R)Check Radial Wobble Of Bowl Spindle. , Fuel Oil Centrifuge No 1 F - (S) Replace Buffer And Ball Bearing Housing. , Fuel Oil Centrifuge No 1 G - (T)Renew Ball Bearings And Top Bearing Springs. , Fuel Oil Centrifuge No 1 H - Pump Unit (U)Dismantle Pump Assembly. , Fuel Oil Centrifuge No 1 I - (V)Replace Bushings, Wear Gaskets, Flexible Coupling, Relief/ Safety Valve And Impeller Shaft. , Fuel Oil Centrifuge No 1 J - (W)Renew Lipseal Ring. , Fuel Oil Centrifuge No 1 K - Centrifuge To Be Proved For Optimum Performance As Per The Rating. Trials To Be Offered To Naval Trial Agencies , Fuel Oil Centrifuge No 2 A - (A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Fuel Oil Centrifuge No 2 B - Inlet Device(B) Replace The Flow Indicator If Clogged. Clean The Sight Glass. (C) Replace The Reducing Valve Cone.(D) Replace The Non-Return Valve Cone. , Fuel Oil Centrifuge No 2 C - (E) Check Disc Stack Pressure (F) Check For Corrosion, Erosion And Cracks(G) Galling Of Guide Surface(H) Renew Oil In Gear Housing. (J) Replace Worm Wheel And Worm.(K)Check Height Position For Pairing Disc. Renew Frame Feet Rubber Cushions/Vibration Dampers.(L)Clean And Check Spring And Brake Shoe. Renew Friction Pad/ Brake Plug.(M) Clean And Check Friction Coupling. Renew Friction Pads And Lipseal Ring , Fuel Oil Centrifuge No 2 D - Horizontal Drive(N)Check Axial Play Of Coupling Disc.(P)Renew Bearings Of Worn Wheel Shaft. , Fuel Oil Centrifuge No 2 E - Vertical Drive (Q)Clean And Check Bowl Spindle And Nave For Impact. , Fuel Oil Centrifuge No 2 F - (R)Check Radial Wobble Of Bowl Spindle. , Fuel Oil Centrifuge No 2 G - (S) Replace Buffer And Ball Bearing Housing. , Fuel Oil Centrifuge No 2 H - (T)Renew Ball Bearings And Top Bearing Springs. , Fuel Oil Centrifuge No 2 I - Pump Unit (U)Dismantle Pump Assembly. , Fuel Oil Centrifuge No 2 J - (V)Replace Bushings, Wear Gaskets, Flexible Coupling, Relief/ Safety Valve And Impeller Shaft. , Fuel Oil Centrifuge No 2 K - (W)Renew Lipseal Ring. , Fuel Oil Centrifuge No 2 L - Centrifuge To Be Proved For Optimum Performance As Per The Rating. Trials To Be Offered To Naval Trial Agencies , Lo Centrifugemake; Alfa Lavalmodel; Mab-103Gmcapacity; 1300 Ltr/Hr Lub Oil Centrifuge No 1 - Carry Out Following Works(A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Lub Oil Centrifuge No 1 I - Inlet Device(B) Replace The Flow Indicator If Clogged. Clean The Sight Glass. (C) Replace The Reducing Valve Cone.(D) Replace The Non-Return Valve Cone. , Lub Oil Centrifuge No 1 Ii - Dismantle And Examine Separator Bowl Assembly Throughly. Clean All Components And Check Following:- (E) Check Disc Stack Pressure.(F) Check For Corrosion, Erosion And Cracks.(G) Galling Of Guide Surface.(H) Renew Oil In Gear Housing. (J) Replace Worm Wheel And Worm.(K)Check Height Position For Pairing Disc. Renew Frame Feet Rubber Cushions/Vibration Dampers.(L)Clean And Check Spring And Brake Shoe. Renew Friction Pad/ Brake Plug.(M) Clean And Check Friction Coupling. Renew Friction Pads And Lipseal Ring , Lub Oil Centrifuge No 1 Iii - Horizontal Drive(N)Check Axial Play Of Coupling Disc.(P)Renew Bearings Of Worn Wheel Shaft. , Lub Oil Centrifuge No 1 Iv - Vertical Drive(Q)Clean And Check Bowl Spindle And Nave For Impact. , Lub Oil Centrifuge No 1 V - (R)Check Radial Wobble Of Bowl Spindle. , Lub Oil Centrifuge No 1 Vi - (S) Replace Buffer And Ball Bearing Housing. , Lub Oil Centrifuge No 1 Vii - (T)Renew Ball Bearings And Top Bearing Springs. , Lub Oil Centrifuge No 1 Viii - Pump Unit (U)Dismantle Pump Assembly. , Lub Oil Centrifuge No 1 Ix - (V)Replace Bushings, Wear Gaskets, Flexible Coupling, Relief/ Safety Valve And Impeller Shaft. , Lub Oil Centrifuge No 1 X - (W)Renew Lipseal Ring. , Lub Oil Centrifuge No 1Xi - Centrifuge To Be Proved For Optimum Performance As Per The Rating. Trials To Be Offered To Naval Trial Agencies , Lub Oil Centrifuge No 2 I - (A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Lub Oil Centrifuge No 2 Ii - Inlet Device(B) Replace The Flow Indicator If Clogged. Clean The Sight Glass. (C) Replace The Reducing Valve Cone.(D) Replace The Non-Return Valve Cone. , Lub Oil Centrifuge No 2 Iii - Dismantle And Examine Separator Bowl Assembly Throughly. Clean All Components And Check Following:- (E) Check Disc Stack Pressure.(F) Check For Corrosion, Erosion And Cracks.(G) Galling Of Guide Surface.(H) Renew Oil In Gear Housing. (J) Replace Worm Wheel And Worm.(K)Check Height Position For Pairing Disc. Renew Frame Feet Rubber Cushions/Vibration Dampers.(L)Clean And Check Spring And Brake Shoe. Renew Friction Pad/ Brake Plug.(M) Clean And Check Friction Coupling. Renew Friction Pads And Lipseal Ring , Lub Oil Centrifuge No 2 Iv - Horizontal Drive(N)Check Axial Play Of Coupling Disc.(P)Renew Bearings Of Worn Wheel Shaft. , Lub Oil Centrifuge No 2 V - Vertical Drive(Q)Clean And Check Bowl Spindle And Nave For Impact. , Lub Oil Centrifuge No 2 Vi - (R)Check Radial Wobble Of Bowl Spindle. , Lub Oil Centrifuge No 2 Vii - (S) Replace Buffer And Ball Bearing Housing. , Lub Oil Centrifuge No 2 Viii - (T)Renew Ball Bearings And Top Bearing Springs. , Lub Oil Centrifuge No 2 Ix - Pump Unit (U)Dismantle Pump Assembly. , Lub Oil Centrifuge No 2 X - (V)Replace Bushings, Wear Gaskets, Flexible Coupling, Relief/ Safety Valve And Impeller Shaft. , Lub Oil Centrifuge No 2 Xi - (W)Renew Lipseal Ring. , Lub Oil Centrifuge No 2 Xii - Centrifuge To Be Proved For Optimum Performance As Per The Rating. Trials To Be Offered To Naval Trial Agencies , Lub Oil Centrifuge No 3 I - (A) Check Treads Of Inlet Pipe And Of Oil Pairing Disc For Damage And Wear. Renew If Required , Lub Oil Centrifuge No 3 Ii - Inlet Device(B) Replace The Flow Indicator If Clogged. Clean The Sight Glass. (C) Replace The Reducing Valve Cone.(D) Replace The Non-Return Valve Cone. , Lub Oil Centrifuge No 3 Iii - Dismantle And Examine Separator Bowl Assembly Throughly. Clean All Components And Check Following:- (E) Check Disc Stack Pressure(F) Check For Corrosion, Erosion And Cracks(G) Galling Of Guide Surface.(H) Renew Oil In Gear Housing. (J) Replace Worm Wheel And Worm.(K)Check Height Position For Pairing Disc. Renew Frame Feet Rubber Cushions/Vibration Dampers.(L)Clean And Check Spring And Brake Shoe. Renew Friction Pad/ Brake Plug.(M) Clean And Check Friction Coupling. Renew Friction Pads And Lipseal Ring , Lub Oil Centrifuge No 3 Iv - Horizontal Drive(N)Check Axial Play Of Coupling Disc.(P)Renew Bearings Of Worn Wheel Shaft. , Lub Oil Centrifuge No 3 V - Vertical Drive (Q)Clean And Check Bowl Spindle And Nave For Impact. , Lub Oil Centrifuge No 3 Vi - (R)Check Radial Wobble Of Bowl Spindle. , Lub Oil Centrifuge No 3 Vii - (S) Replace Buffer And Ball Bearing Housing. , Lub Oil Centrifuge No 3 Viii - (T)Renew Ball Bearings And Top Bearing Springs. , Lub Oil Centrifuge No 3 Ix - Pump Unit(U)Dismantle Pump Assembly. , Lub Oil Centrifuge No 3 X - (V)Replace Bushings, Wear Gaskets, Flexible Coupling, Relief/ Safety Valve And Impeller Shaft. , Lub Oil Centrifuge No 3 Xi - (W)Renew Lipseal Ring. , Lub Oil Centrifuge No 3 Xii - Centrifuge To Be Proved For Optimum Performance As Per The Rating. Trials To Be Offered To Naval Trial Agencies , Air Reservoir(Hp Air Bottles)Air System - Remove, Clean And Pressure Test All The H.P Air Reservoirs To 1.5 Times Of Working Pressure. (A) Capacity - 550 Ltr, Qty - 02, Test Pressure - 45 Bar, Location - Aer Annex,Capacity - 250 Ltr, Qty - 03, Test Pressure - 45 Bar, Location - Aer Annex, Capacity - 25 Ltr, Qty - 02, Test Pressure - 11 Bar, Location - Mer (Pme And Sme Lcp Control Air), Capacity - 50 Ltr, Qty - 02, Test Pressure - 11 Bar, Location - Mer (Pme And Sme Above Lcp), Capacity - 100 Ltr, Qty - 02, Test Pressure - 13 Bar, Location - Mer (Port And Stbd Local Clutch Station),Capacity - 25 Ltr, Qty - 02, Test Pressure - 45 Bar, Location - Mer (Port And Stbd Overspeed Air), Capacity - 750 Ltr, Qty - 01, Test Pressure - 12 Bar, Location - Avcat Lobby (Hydrophore Tank) , Md Air Compressormake - M/S Elgimodel - Hp 20-300 - To Be Replaced With New Compressorfirm Scope Of Work Is As Follows:- , Md Air Compressor A - (A) Degutting Of Associated System Pipe Lines , Md Air Compressor B - (B) Degutting Of Old Compressor , Md Air Compressor C - (C) Removal Of Old Compressor And Associated Components Including Foundations Out Of Ship And Shipment Of New Compressor At Designated Location. Job Invloves Hotwork/ Deck Cutting , Md Air Compressor D - (E) Supply, Laying And Termination Of Power/ Control/ Instrumentation Cabling. , Md Air Compressor E - (F) Supply Of The Foundation/ Seating/ Ship Deck Stiffening Stool For Erecting The Base Frame Of The Compressor. Foot Print For Manufacturing Of Foundation To Be Obtained From Oem. , Md Air Compressor F - (G) Painting Of New Foundation As Per Standard Paint Scheme , Md Air Compressor G - (H) Erection Of New Foundation As Per Oem Recommendation Including. Job Would Involve Hot Work/ Welding , Md Air Compressor Specifications - Akcc-120 Rfpl Avm - Hp10 H - (H) Replacement Of Sv Mounts As Per Ser Sow 8 , Md Air Compressor I - (K) Installation And Stw Of New Compressor , Md Air Compressor J - (L)Fitment Of Associated System Pipe Lines , Md Air Compressor K - (M) Vibration And Capacity Trials Of New Compressor To Be Undertaken Post Fitment In Presence Of Naval Trial Agencies , Dd Air Compressormake - M/S Elgimodel - Hp 10-301 L - To Be Replaced With New Compressorfirm Scope Of Work Is As Follows:- , Dd Air Compressor M - (A) Degutting Of Associated System Pipe Lines , Dd Air Compressor N - (B) Degutting Of Old Compressor , Dd Air Compressor O - (C) Removal Of Old Compressor And Associated Components Including Foundations Out Of Ship And Shipment Of New Compressor At Designated Location. Job Invloves Hotwork/ Deck Cutting , Dd Air Compressor P - (E) Supply, Laying And Termination Of Power/ Control/ Instrumentation Cabling. , Dd Air Compressor Q - (F) Supply Of The Foundation/ Seating/ Ship Deck Stiffening Stool For Erecting The Base Frame Of The Chiller Plant. Foot Print For Manufacturing Of Foundation To Be Obtained From Oem. , Dd Air Compressor R - (G) Painting Of New Foundation As Per Standard Pain Scheme , Dd Air Compressor S - (H) Erection Of New Foundation As Per Oem Recommendation Including. Job Would Involve Hot Work/ Welding , Dd Air Compressor Specifications - Akcc-120 Rfpl Avm - Hp10 T - (H) Replacement Of Sv Mounts As Per Ser Sow 8 , Dd Air Compressor U - (K) Installation And Stw Of New Compressor , Dd Air Compressor V - (L)Fitment Of Associated System Pipe Lines , Dd Air Compressor W - (M) Vibration And Capacity Trials Of New Compressor To Be Undertaken Post Fitment In Presence Of Naval Trial Agencies , Co2 Fixed Fire Fightingmake; Vijay Industries And Projects Ltdco2 Sysytem - (A) Remove Allco2 Bottles And Carry Out Survey And Proof Testing. Recharge All Cylinders And Weigh The Co2 Cylinders Using Beam Scale Followed By Fitment And Integration With Associated System Components Including Ipms , Co2 Sysytem I - (B) Replace All Nozzles And Prove The System By Admitting Lp Air Into Ring Main And Checking The System For Leaks. , Co2 Sysytem Ii - (C) Renew All Pressure Gauges Fitted In The System (0-280 Bar) , Co2 Sysytem Iii - (F) Replace All Flexible Hoses , Co2 Sysytem Iv - (G) Replace Non-Return Valves And Safety Stop Valves , Co2 Sysytem V - (H) Remove And Inspect Cylinder Operating Heads Prove Their Functioning. , Co2 Sysytem Vi - (J) Replace Defetcive Cylinder Operating Heads , Co2 Sysytem Vii - (K) Renew Bursting Discs Fitted In Pipe System , Co2 Sysytem Viii - (L) Calibrate All Pressure Switches Fitted In The System. , Co2 Sysytem Ix - (M) Remove And Pressure Test All Pilot Nitrogen Bottles To Test Pressure (225 Bar) Followed By Charging With Dry Nitrogen Upto 150 Bar. , Co2 Sysytem X - (P) Renew All Audio And Visual Alarm , Co2 Sysytem Xi - (N) Replace All Nrv Nozzles Fitted In Common Manifold Discharge Line , Co2 Sysytem Xii - (P) Replace Electronic Hooter Fitted In Aer, Mer & Aer Annex , Co2 Sysytem Xiii - (Q) Overhaul Directional Valves Fitted In Discharge Manifold. Size - 80 Mm , Co2 Sysytem Xiv - (T)Co2 Evacuation Alarm For Mer And Aer Located In Jr Sailors Bathroom Lobby And Aer Annex Respectivelynon-Operational. Same Is To Be Made Operational And Integrated To Mcr & Ipms. Scope Of Work As Follows:-(I)Replace Push Button Panel For Evacuation Alarm(Ii) Replace Cabling From Evacuation Alarm Panel To Mcr Indiacation Panel. Approx Length - 200 Mtrs(Iii)Connectorisation Of Cable, Continuity And Ground Fault Checks(Iv)Functionality Checks Of Evacuation Alarm For Indication In Mcr Control Panel And Ipms In Presence Of Shipsstaff , Co2 Sysytem Xv - Prove The Functionality Of System By Carrying Out , Co2 System Xvi - Provision Of Over Pressure Relief Valve And Manifold Vent Valve For Co2 Major Fire Fighting System To Be Made As Per Scope Of Work Mentioned In The Board Proceedings. , Co2 Control Panel - Complete Overhauling Of Control Panel Including Painting. , Co2 Control Panel I - Procure Replace Power Supply Unit , Co2 Control Panel Ii - Procure And Replace 10 Defective Fuses, 05 Contactors, And Connectors , Co2 Control Panel Iii - Carry Out Performance Checks In The Presence Of Ship Staff And Prove System , Rhibrhib Engine Make; Volvo Penta Model; D4 240Capacity; 240 Hp - Undetake Following On Lca Engines(A)Renew Oil In The Servo Pump (On The Engine). (B)Renew Oil From The Trim Unit.(C)Renew Oil In The Reverse Gear.(D)Replace Oil Filter And Fuel Filter.(E)Calibrate The Injectors.(F) Replace All Sacrificial Anodes.(G)Replace The Guide Bushing And Seal In The Cover.(H)Check For Play In The Holes For The Drive Mounting Journals In The Drive.(J) Lubricate The Guide Bearings In The Guide Fork.(K)Replace Control Cables, Coupling, Bushing And Controls.(L) Replace Electrical Circuit For Grounding.(M) Replace The Servo Cylinder Hoses . (N)Replace The The Control Cables.(P)Replace The Propeller Shaft .(Q)Replace The Gear Mechanism . (R)Replace The Non Return Valve In Exhaust System. (S) Check That There Is No Abnormal Play In The Steering.(T)Drain And Flush The Cooling System. (U) Clean And Touch Up Paint.(V) Replace The Universal Joint And Exhaust Bellows Between The Engines Exhaust Bend And The Covers Exhaust Pipe. , Rhibi - (W)Replace Wiring For Bilge Pump , Rhibii - (X)Fresh Water Cooler To Be Chemically Cleaned And Pressure Tested As Per Ser Sow 7. Test Pr - 6 Kgf/Cm2 , Rhib Iii - (Y)Wiring And Faulty Relays For Trim Operation To Be Renewed , Rhib Iv - (Z)Engine Safety Circuit Checks To Be Carried Out For 02 Ribs As Per Oem Manual. Defects If Any To Be Rectified. , Rhib V - (Aa)Throttle Control Mechanism For 04 In Nos Lcas, Each With 02 In Nos Engines, Gets Stuck Occasionally. Mechanism To Be Overhauled And Control Cables To Be Checked For Serviceability And Renewed For Beyond Reliable Repairs. , Rhib Vi - (Ab)Renew Impellers On Engine Driven Sea Water Pumps. Mat - Hard Rubber , Rhib Vii - (Ac)Renew Fuse Control Box. , Rib Instrumentation I - Calibrate Following Instrumentation Of Lca As Per Sow 10.(A)Tachometer (0 - 4500 ) , Rib Instrumentation Ii - (B)Fuel Tank Level Indicator , Rib Instrumentation Iii - (C)Water Temp Gauge (0 To 1200C) , Rib Instrumentation Iv - (D)Lub Oil Pressure Sensor (0 - 12 Kgf/Cm2) , Rib Instrumentation V - (E)Trim Gauge (0 To 32 Mm) , Rib Instrumentation Vi - (F)Volt Meter (12V) , Rib Trials - Trials:Sea Trial Of One Hour Each To Be Conducted On Both Port And Stbd Ribs Post Liquidation Of All Defect List Serials (H, E, L). Engine And Steering Gear To Be Proved For Optimum Performance To Reach A Max Speed Of 20 Knots. All Defects During Trials Including Fuel, Lub Oil, Coolant Leakages To Be Liquidated By Firm. , Oily Water Separator Oily Water Separatormake - M/S Suyash Enterprisemodel - Sd 5 - Installation, Setting To Work Of New Oily Water Separator With All End Connection Of Piping / Electrical. (Job Involves Removal Of Old Ows, Renewal Of Foundation And Sv Mounts For New Ows)Firm To Do Commisioning And Capacity Trials. , Owssludge Tank I - Provision Of Fixed Pumping Out Arrangement Of Ows Sludge Tank Located In Mer Upto Weather Deck. Job Involves Following: (A) Provision And Installation Of New Sludge Oil Transfer Pump With Starter Panel Along With Suction And Discharge Pressure Gauges And Suction And Discharge Valves (65 Nb, Sdnr).Manufacture And Fitment Of New Discharge Line From Mer To Weather Deck With Deck Gland And Goose Neck With Open Flange.Proving Of Apt Of Affected Compartments. , Owssludge Tank Ii - Rod Gearings To Be Replaced As Per Sample. Location Of Rod Gearings As Per Appendix F. Scope Of Work Is As Follows:-Degutting/ Removal Of Existing Rod Gearing And Deck Opearting Point. Job Includes Hot Work/ Deck Cutting.Manufacture Of New Rod Gearing As Per Sample Including Securing Brackets In Bulkhead.Gearbox To Be Replaced. Firm To Quote For Supply Of Gearbox For Rod Gearings.Universal Coupling To Replaced. Firm To Quote For Supply. Deck Operating Points To Be Replaced As Per Sample. Job Involves Deck Cutting.Deck Covers To Be Manufactured For Covering Of Deck Points As Per Sample. Mat - Brass.Fitment Of New Rod Gearings Along With Associated Components Such As Gearbox, Universal Coupling And Securing Bracket.Trials Of Rod Gearing Post Fitment In Presence Of Ship Staff , Lca Engines Lca Engine Make; Volvo Pentamodel; D6 330 Capacity; 330 Hp Lca Engines - Undetake Following On Lca Engines(A)Renew Oil In The Servo Pump (On The Engine). , Lca Engines I - (B)Renew Oil From The Trim Unit. , Lca Engines Ii - (C)Renew Oil In The Reverse Gear. , Lca Engines Iii - (D)Replace Oil Filter And Fuel Filter. , Lca Engines Iv - (E)Calibrate The Injectors. , Lca Engines V - (F) Replace All Sacrificial Anodes , Lca Engines Vi - (G)Replace The Guide Bushing And Seal In The Cover. , Lca Engines Vii - (H)Check For Play In The Holes For The Drive Mounting Journals In The Drive. , Lca Engines Viii - (J) Lubricate The Guide Bearings In The Guide Fork. , Lca Engines Ix - (K)Replace Control Cables, Coupling, Bushing And Controls. , Lca Engines X - (L) Replace Electrical Circuit For Grounding. , Lca Engines Xi - (M) Replace The Servo Cylinder Hoses . , Lca Engines Xii - (N)Replace The The Control Cables. , Lca Engines Xiv - (P)Replace The Propeller Shaft . , Lca Engines Xv - (Q)Replace The Gear Mechanism . , Lca Engines Xvi - (R)Replace The Non Return Valve In Exhaust System. , Lca Engines Xvii - (S) Check That There Is No Abnormal Play In The Steering. , Lca Engines Xviii - (T)Drain And Flush The Cooling System. , Lca Engines Xix - (U) Clean And Touch Up Paint. , Lca Engines Xx - (V) Replace The Universal Joint And Exhaust Bellows Between The Engines Exhaust Bend And The Covers Exhaust Pipe. , Lca Engines Xxi - (W)Replace Wiring For Bilge Pump , Lca Engines Xxii - (X)Fresh Water Cooler To Be Chemically Cleaned And Pressure Tested As Per Ser Sow 7. Test Pr - 6 Kgf/Cm2 , Lca Engines Xxiii - (Y)Wiring And Faulty Relays For Trim Operation To Be Renewed , Lca Engines Xxiv - (Z)Engine Safety Circuit Checks To Be Carried Out For 04 In Nos Lcas. Defects If Any To Be Rectified. , Lca Engines Xxv - (Aa)Throttle Control Mechanism For 04 In Nos Lcas, Each With 02 In Nos Engines, Gets Stuck Occasionally. Mechanism To Be Overhauled And Control Cables To Be Checked For Serviceability And Renewed For Beyond Reliable Repairs. , Lca Engines Xxvi - (Ab)Renew Impellers On Engine Driven Sea Water Pumps. Mat - Hard Rubber , Lca Instrumentation I - Calibrate Following Gauges Of Lca As Per Sow 10.(A)Rpm Gauges (0 - 4600 ) , Lca Instrumentation Ii - (B)Lub Oil Pr Gauge (0 To 12 Kgf/Cm2) , Lca Instrumentation Iii - (C)Fuel Pr Gauge (0 To 12 Kgf/Cm2) , Lca Instrumentation Iv - (D)Pressure Gauge (For Turbine) , Lca Instrumentation V - (E)Trim Gauge (0 To 32 Mm) , Lca Instrumentation Vi - (F)Temperature Gauge (0 To 1200C) , Lca Instrumentation Vii - Calibrate Following Sensors Of Lca As Per Sow 10. (A)Temperature Sensor (0 To 1200C) , Lca Instrumentation Viii - (B)Pressure Sensor (0 - 4 Kgf/Cm2) , Lca Trials - Trials: Sea Trial Of One Hour Each To Be Conducted On Four Lcas Post Liquidation Of All Defect List Serials (H, E, L). Engine And Steering Gear To Be Proved For Optimum Performance To Reach A Max Speed Of 30 Knots. All Defects During Trials Including Fuel, Lub Oil, Coolant Leakages To Be Liquidated By Firm. , I (Mandotary Spares) Co2 Control Panels - Fuses , Ii (Mandotary Spares) Co2 Control Panels - Contactors , Iii (Mandotary Spares) Co2 Control Panels - 15 Connectors Total Quantity : 1

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-Dec-2021 27-12-2021
2 22-Dec-2021 29-12-2021
3 24-Dec-2021 31-12-2021
4 28-Dec-2021 07-01-2022
5 10-Jan-2022 17-01-2022
6 17-Jan-2022 20-01-2022
7 20-Jan-2022 28-01-2022
8 29-Jan-2022 01-02-2022
9 07-Feb-2022 09-02-2022

Key Value

Document Fees
Refer document
EMD
INR 377500.0 /-
Tender Value
Refer document

BOQ Items

Sl. No. Item TitleItem Description
1Fuel Oil Centrifuge No 1 FUEL OIL CENTRIFUGE Make; ALFA LAVAL Model; MOPX 207 NC1 Capacity; 7400 Ltr/Hr(a) Check treads of inlet pipe and of oil pairing disc for damage and wear. Renew if required
2Fuel Oil Centrifuge No 1 aInlet Device (b) Replace the flow indicator if clogged. Clean the sight glass. (c) Replace the reducing valve cone.(d) Replace the non-return valve cone.
3Fuel Oil Centrifuge No 1 bDismantle and examine separator bowl assembly throughly. Clean all components and check following:-(e) Check Disc Stack Pressure.(f) Check for corrosion, erosion and cracks.(g) Galling of guide surface.(h) Renew oil in gear housing. (j) Replace worm wheel and worm.(k)Check height position for pairing disc. Renew frame feet rubber cushions/vibration dampers.(l)Clean and check spring and brake shoe. Renew friction pad/ brake plug.(m) Clean and check friction coupling. Renew friction pads and lipseal ring
4Fuel Oil Centrifuge No 1 cHorizontal Drive(n)Check axial play of coupling disc.(p)Renew bearings of worn wheel shaft.
5Fuel Oil Centrifuge No 1 dVertical Drive (q)Clean and check bowl spindle and nave for impact.
6Fuel Oil Centrifuge No 1 e(r)Check radial wobble of bowl spindle.
7Fuel Oil Centrifuge No 1 f(s) Replace buffer and ball bearing housing.
8Fuel Oil Centrifuge No 1 g(t)Renew ball bearings and top bearing springs.
9Fuel Oil Centrifuge No 1 hPump unit (u)Dismantle pump assembly.
10Fuel Oil Centrifuge No 1 i(v)Replace bushings, wear gaskets, flexible coupling, relief/ safety valve and impeller shaft.
11Fuel Oil Centrifuge No 1 j(w)Renew lipseal ring.
12Fuel Oil Centrifuge No 1 kCentrifuge to be proved for optimum performance as per the rating. Trials to be offered to Naval Trial Agencies
13Fuel Oil Centrifuge No 2 a(a) Check treads of inlet pipe and of oil pairing disc for damage and wear. Renew if required
14Fuel Oil Centrifuge No 2 bInlet Device(b) Replace the flow indicator if clogged. Clean the sight glass. (c) Replace the reducing valve cone.(d) Replace the non-return valve cone.
15Fuel Oil Centrifuge No 2 c(e) Check Disc Stack Pressure (f) Check for corrosion, erosion and cracks(g) Galling of guide surface(h) Renew oil in gear housing. (j) Replace worm wheel and worm.(k)Check height position for pairing disc. Renew frame feet rubber cushions/vibration dampers.(l)Clean and check spring and brake shoe. Renew friction pad/ brake plug.(m) Clean and check friction coupling. Renew friction pads and lipseal ring
16Fuel Oil Centrifuge No 2 dHorizontal Drive(n)Check axial play of coupling disc.(p)Renew bearings of worn wheel shaft.
17Fuel Oil Centrifuge No 2 eVertical Drive (q)Clean and check bowl spindle and nave for impact.
18Fuel Oil Centrifuge No 2 f(r)Check radial wobble of bowl spindle.
19Fuel Oil Centrifuge No 2 g(s) Replace buffer and ball bearing housing.
20Fuel Oil Centrifuge No 2 h(t)Renew ball bearings and top bearing springs.
21Fuel Oil Centrifuge No 2 iPump unit (u)Dismantle pump assembly.
22Fuel Oil Centrifuge No 2 j(v)Replace bushings, wear gaskets, flexible coupling, relief/ safety valve and impeller shaft.
23Fuel Oil Centrifuge No 2 k(w)Renew lipseal ring.
24Fuel Oil Centrifuge No 2 lCentrifuge to be proved for optimum performance as per the rating. Trials to be offered to Naval Trial Agencies
25LO Centrifuge Make; ALFA LAVAL Model; MAB-103GM Capacity; 1300 Ltr/Hr Lub Oil Centrifuge No 1Carry Out following works(a) Check treads of inlet pipe and of oil pairing disc for damage and wear. Renew if required
26Lub Oil Centrifuge No 1 iInlet Device(b) Replace the flow indicator if clogged. Clean the sight glass. (c) Replace the reducing valve cone.(d) Replace the non-return valve cone.
27Lub Oil Centrifuge No 1 iiDismantle and examine separator bowl assembly throughly. Clean all components and check following:- (e) Check Disc Stack Pressure.(f) Check for corrosion, erosion and cracks.(g) Galling of guide surface.(h) Renew oil in gear housing. (j) Replace worm wheel and worm.(k)Check height position for pairing disc. Renew frame feet rubber cushions/vibration dampers.(l)Clean and check spring and brake shoe. Renew friction pad/ brake plug.(m) Clean and check friction coupling. Renew friction pads and lipseal ring
28Lub Oil Centrifuge No 1 iiiHorizontal Drive(n)Check axial play of coupling disc.(p)Renew bearings of worn wheel shaft.
29Lub Oil Centrifuge No 1 ivVertical Drive(q)Clean and check bowl spindle and nave for impact.
30Lub Oil Centrifuge No 1 v(r)Check radial wobble of bowl spindle.
31Lub Oil Centrifuge No 1 vi(s) Replace buffer and ball bearing housing.
32Lub Oil Centrifuge No 1 vii(t)Renew ball bearings and top bearing springs.
33Lub Oil Centrifuge No 1 viiiPump unit (u)Dismantle pump assembly.
34Lub Oil Centrifuge No 1 ix(v)Replace bushings, wear gaskets, flexible coupling, relief/ safety valve and impeller shaft.
35Lub Oil Centrifuge No 1 x(w)Renew lipseal ring.
36Lub Oil Centrifuge No 1xiCentrifuge to be proved for optimum performance as per the rating. Trials to be offered to Naval Trial Agencies
37Lub Oil Centrifuge No 2 i(a) Check treads of inlet pipe and of oil pairing disc for damage and wear. Renew if required
38Lub Oil Centrifuge No 2 iiInlet Device(b) Replace the flow indicator if clogged. Clean the sight glass. (c) Replace the reducing valve cone.(d) Replace the non-return valve cone.
39Lub Oil Centrifuge No 2 iiiDismantle and examine separator bowl assembly throughly. Clean all components and check following:- (e) Check Disc Stack Pressure.(f) Check for corrosion, erosion and cracks.(g) Galling of guide surface.(h) Renew oil in gear housing. (j) Replace worm wheel and worm.(k)Check height position for pairing disc. Renew frame feet rubber cushions/vibration dampers.(l)Clean and check spring and brake shoe. Renew friction pad/ brake plug.(m) Clean and check friction coupling. Renew friction pads and lipseal ring
40Lub Oil Centrifuge No 2 ivHorizontal Drive(n)Check axial play of coupling disc.(p)Renew bearings of worn wheel shaft.
41Lub Oil Centrifuge No 2 vVertical Drive(q)Clean and check bowl spindle and nave for impact.
42Lub Oil Centrifuge No 2 vi(r)Check radial wobble of bowl spindle.
43Lub Oil Centrifuge No 2 vii(s) Replace buffer and ball bearing housing.
44Lub Oil Centrifuge No 2 viii(t)Renew ball bearings and top bearing springs.
45Lub Oil Centrifuge No 2 ixPump unit (u)Dismantle pump assembly.
46Lub Oil Centrifuge No 2 x(v)Replace bushings, wear gaskets, flexible coupling, relief/ safety valve and impeller shaft.
47Lub Oil Centrifuge No 2 xi(w)Renew lipseal ring.
48Lub Oil Centrifuge No 2 xiiCentrifuge to be proved for optimum performance as per the rating. Trials to be offered to Naval Trial Agencies
49Lub Oil Centrifuge No 3 i(a) Check treads of inlet pipe and of oil pairing disc for damage and wear. Renew if required
50Lub Oil Centrifuge No 3 iiInlet Device(b) Replace the flow indicator if clogged. Clean the sight glass. (c) Replace the reducing valve cone.(d) Replace the non-return valve cone.
51Lub Oil Centrifuge No 3 iiiDismantle and examine separator bowl assembly throughly. Clean all components and check following:- (e) Check Disc Stack Pressure(f) Check for corrosion, erosion and cracks(g) Galling of guide surface.(h) Renew oil in gear housing. (j) Replace worm wheel and worm.(k)Check height position for pairing disc. Renew frame feet rubber cushions/vibration dampers.(l)Clean and check spring and brake shoe. Renew friction pad/ brake plug.(m) Clean and check friction coupling. Renew friction pads and lipseal ring
52Lub Oil Centrifuge No 3 ivHorizontal Drive(n)Check axial play of coupling disc.(p)Renew bearings of worn wheel shaft.
53Lub Oil Centrifuge No 3 vVertical Drive (q)Clean and check bowl spindle and nave for impact.
54Lub Oil Centrifuge No 3 vi(r)Check radial wobble of bowl spindle.
55Lub Oil Centrifuge No 3 vii(s) Replace buffer and ball bearing housing.
56Lub Oil Centrifuge No 3 viii(t)Renew ball bearings and top bearing springs.
57Lub Oil Centrifuge No 3 ixPump unit(u)Dismantle pump assembly.
58Lub Oil Centrifuge No 3 x(v)Replace bushings, wear gaskets, flexible coupling, relief/ safety valve and impeller shaft.
59Lub Oil Centrifuge No 3 xi(w)Renew lipseal ring.
60Lub Oil Centrifuge No 3 xiiCentrifuge to be proved for optimum performance as per the rating. Trials to be offered to Naval Trial Agencies
61Air Reservoir (HP Air Bottles) AIR SYSTEMRemove, clean and pressure test all the H.P air reservoirs to 1.5 times of working pressure. (a) Capacity - 550 Ltr, Qty - 02, Test Pressure - 45 Bar, Location - AER Annex ,Capacity - 250 Ltr, Qty - 03, Test Pressure - 45 Bar, Location - AER Annex , Capacity - 25 Ltr, Qty - 02, Test Pressure - 11 Bar, Location - MER (PME and SME LCP Control Air) , Capacity - 50 Ltr, Qty - 02, Test Pressure - 11 Bar, Location - MER (PME and SME above LCP) , Capacity - 100 Ltr, Qty - 02, Test Pressure - 13 Bar, Location - MER (Port and Stbd Local Clutch Station) ,Capacity - 25 Ltr, Qty - 02, Test Pressure - 45 Bar, Location - MER (Port and Stbd Overspeed Air) , Capacity - 750 Ltr, Qty - 01, Test Pressure - 12 Bar, Location - AVCAT Lobby (Hydrophore Tank)
62MD Air Compressor Make - M/s ELGI Model - HP 20-300To be replaced with new compressor Firm scope of work is as follows:-
63MD Air Compressor a(a) Degutting of associated system pipe lines
64MD Air Compressor b(b) Degutting of old compressor
65MD Air Compressor c(c) Removal of old compressor and associated components including foundations out of Ship and shipment of new compressor at designated location. Job invloves hotwork/ deck cutting
66MD Air Compressor d(e) Supply, laying and termination of power/ control/ instrumentation cabling.
67MD Air Compressor e(f) Supply of the foundation/ seating/ ship deck stiffening stool for erecting the base frame of the Compressor. Foot print for manufacturing of foundation to be obtained from OEM.
68MD Air Compressor f(g) Painting of new foundation as per standard paint scheme
69MD Air Compressor g(h) Erection of new foundation as per OEM recommendation including. Job would involve hot work/ welding
70MD Air Compressor Specifications - AKCC-120 RFPL AVM - HP10 h(h) Replacement of SV mounts as per ser SOW 8
71MD Air Compressor i(k) Installation and STW of new compressor
72MD Air Compressor j(l)Fitment of associated system pipe lines
73MD Air Compressor k(m) Vibration and capacity trials of new compressor to be undertaken post fitment in presence of Naval Trial agencies
74DD Air Compressor Make - M/s ELGI Model - HP 10-301 lTo be replaced with new compressor Firm scope of work is as follows:-
75DD Air Compressor m(a) Degutting of associated system pipe lines
76DD Air Compressor n(b) Degutting of old compressor
77DD Air Compressor o(c) Removal of old compressor and associated components including foundations out of Ship and shipment of new compressor at designated location. Job invloves hotwork/ deck cutting
78DD Air Compressor p(e) Supply, laying and termination of power/ control/ instrumentation cabling.
79DD Air Compressor q(f) Supply of the foundation/ seating/ ship deck stiffening stool for erecting the base frame of the Chiller plant. Foot print for manufacturing of foundation to be obtained from OEM.
80DD Air Compressor r(g) Painting of new foundation as per standard pain scheme
81DD Air Compressor s(h) Erection of new foundation as per OEM recommendation including. Job would involve hot work/ welding
82DD Air Compressor Specifications - AKCC-120 RFPL AVM - HP10 t(h) Replacement of SV mounts as per ser SOW 8
83DD Air Compressor u(k) Installation and STW of new compressor
84DD Air Compressor v(l)Fitment of associated system pipe lines
85DD Air Compressor w(m) Vibration and capacity trials of new compressor to be undertaken post fitment in presence of Naval Trial agencies
86CO2 FIXED FIRE FIGHTING Make; VIJAY INDUSTRIES AND PROJECTS LTDCO2 SYSYTEM(a) Remove allCO2 bottles and carry out Survey and proof testing. Recharge all cylinders and weigh the CO2 cylinders using beam scale followed by fitment and integration with associated system components including IPMS
87CO2 SYSYTEM i(b) Replace all nozzles and prove the system by admitting LP air into ring main and checking the system for leaks.
88CO2 SYSYTEM ii(c) Renew all pressure gauges fitted in the system (0-280 bar)
89CO2 SYSYTEM iii(f) Replace all flexible hoses
90CO2 SYSYTEM iv(g) Replace non-return valves and safety stop valves
91CO2 SYSYTEM v(h) Remove and inspect cylinder operating heads prove their functioning.
92CO2 SYSYTEM vi(j) Replace defetcive cylinder operating heads
93CO2 SYSYTEM vii(k) Renew bursting discs fitted in pipe system
94CO2 SYSYTEM viii(l) Calibrate all pressure switches fitted in the system.
95CO2 SYSYTEM ix(m) Remove and pressure test all Pilot nitrogen bottles to test pressure (225 bar) followed by charging with dry Nitrogen upto 150 bar.
96CO2 SYSYTEM x(p) Renew all audio and visual alarm
97CO2 SYSYTEM xi(n) Replace all NRV Nozzles fitted in common manifold discharge line
98CO2 SYSYTEM xii(p) Replace electronic hooter fitted in AER, MER & AER Annex
99CO2 SYSYTEM xiii(q) Overhaul directional valves fitted in discharge manifold. Size - 80 mm
100CO2 SYSYTEM xiv(t)CO2 evacuation alarm for MER and AER located in Jr Sailors Bathroom Lobby and AER Annex respectivelynon-operational. Same is to be made operational and integrated to MCR & IPMS. Scope of work as follows:- (i)Replace push button panel for evacuation alarm (ii) Replace cabling from evacuation alarm panel to MCR indiacation Panel. Approx Length - 200 mtrs (iii)Connectorisation of cable, continuity and ground fault checks (iv)Functionality checks of evacuation alarm for indication in MCR Control Panel and IPMS in presence of Ship"sStaff
101CO2 SYSYTEM xvProve the functionality of system by carrying out
102CO2 System xviProvision of over pressure relief valve and manifold vent valve for CO2 major Fire Fighting system to be made as per scope of work mentioned in the Board Proceedings.
103CO2 Control PanelComplete overhauling of control panel including painting.
104CO2 Control Panel iProcure replace power supply unit
105CO2 Control Panel iiProcure and replace 10 defective fuses, 05 contactors, and connectors
106CO2 Control Panel iiiCarry out performance checks in the presence of ship staff and prove system
107RHIBRHIB Engine Make; VOLVO PENTA Model; D4 240 Capacity; 240 HPUndetake following on LCA Engines(a)Renew oil in the servo pump (on the engine). (b)Renew oil from the trim unit.(c)Renew oil in the reverse gear.(d)Replace oil filter and fuel filter.(e)Calibrate the injectors.(f) Replace all sacrificial anodes.(g)Replace the guide bushing and seal in the cover.(h)Check for play in the holes for the drive mounting journals in the drive.(j) Lubricate the guide bearings in the guide fork.(k)Replace control cables, coupling, bushing and controls.(l) Replace electrical circuit for grounding.(m) Replace the servo cylinder hoses . (n)Replace the the control cables.(p)Replace the propeller shaft .(q)Replace the gear mechanism . (r)Replace the "non return valve" in exhaust system. (s) Check that there is no abnormal play in the steering.(t)Drain and flush the cooling system. (u) Clean and touch up paint.(v) Replace the universal joint and exhaust bellows between the engine"s exhaust bend and the cover"s exhaust pipe.
108RHIBi(w)Replace wiring for bilge pump
109RHIBii(x)Fresh water cooler to be chemically cleaned and pressure tested as per ser SOW 7. Test Pr - 6 Kgf/cm2
110RHIB iii(y)Wiring and faulty relays for trim operation to be renewed
111RHIB iv(z)Engine Safety circuit checks to be carried out for 02 RIBs as per OEM Manual. Defects if any to be rectified.
112RHIB v(aa)Throttle control mechanism for 04 in nos LCAs, each with 02 in nos engines, gets stuck occasionally. Mechanism to be overhauled and control cables to be checked for serviceability and renewed for beyond reliable repairs.
113RHIB vi(ab)Renew impellers on engine driven sea water pumps. Mat - Hard rubber
114RHIB vii(ac)Renew fuse control box.
115RIB Instrumentation iCalibrate following instrumentation of LCA as per SOW 10.(a)Tachometer (0 - 4500 )
116RIB Instrumentation ii(b)Fuel Tank Level Indicator
117RIB Instrumentation iii(c)Water temp gauge (0 to 1200C)
118RIB Instrumentation iv(d)Lub oil Pressure sensor (0 - 12 Kgf/cm2)
119RIB Instrumentation v(e)Trim Gauge (0 to 32 MM)
120RIB Instrumentation vi(f)Volt meter (12V)
121RIB TRIALSTrials: Sea trial of one hour each to be conducted on both port and stbd ribs post liquidation of all defect list serials (H, E, L). Engine and steering gear to be proved for optimum performance to reach a max speed of 20 Knots. All defects during trials including fuel, Lub oil, coolant leakages to be liquidated by Firm.
122Oily Water Separator Oily Water Separator Make - M/s Suyash Enterprise Model - SD 5Installation, Setting to work of new Oily Water Separator with all end connection of piping / electrical. (Job involves removal of old OWS, renewal of foundation and SV mounts for New OWS) Firm to do commisioning and capacity trials.
123OWS Sludge Tank iProvision of fixed pumping out arrangement of OWS Sludge tank located in MER upto Weather Deck. Job involves following: (a) Provision and installation of new Sludge oil transfer pump with starter panel along with suction and discharge pressure gauges and suction and discharge valves (65 NB, SDNR).Manufacture and fitment of new discharge line from MER to Weather Deck with deck gland and goose neck with Open flange.Proving of APT of affected compartments.
124OWS Sludge Tank iiRod gearings to be replaced as per sample. Location of rod gearings as per Appendix F. Scope of work is as follows:-Degutting/ Removal of existing rod gearing and deck opearting point. Job includes hot work/ deck cutting.Manufacture of new rod gearing as per sample including securing brackets in bulkhead.Gearbox to be replaced. Firm to quote for supply of gearbox for rod gearings.Universal coupling to replaced. Firm to quote for supply. Deck operating points to be replaced as per sample. Job involves deck cutting.Deck covers to be manufactured for covering of deck points as per sample. Mat - Brass.Fitment of new rod gearings along with associated components such as gearbox, universal coupling and securing bracket.Trials of rod gearing post fitment in presence of Ship Staff
125LCA Engines LCA Engine Make; VOLVO PENTA Model; D6 330 Capacity; 330 HP LCA EnginesUndetake following on LCA Engines(a)Renew oil in the servo pump (on the engine).
126LCA Engines i(b)Renew oil from the trim unit.
127LCA Engines ii(c)Renew oil in the reverse gear.
128LCA Engines iii(d)Replace oil filter and fuel filter.
129LCA Engines iv(e)Calibrate the injectors.
130LCA Engines v(f) Replace all sacrificial anodes
131LCA Engines vi(g)Replace the guide bushing and seal in the cover.
132LCA Engines vii(h)Check for play in the holes for the drive mounting journals in the drive.
133LCA Engines viii(j) Lubricate the guide bearings in the guide fork.
134LCA Engines ix(k)Replace control cables, coupling, bushing and controls.
135LCA Engines x(l) Replace electrical circuit for grounding.
136LCA Engines xi(m) Replace the servo cylinder hoses .
137LCA Engines xii(n)Replace the the control cables.
138LCA Engines xiv(p)Replace the propeller shaft .
139LCA Engines xv(q)Replace the gear mechanism .
140LCA Engines xvi(r)Replace the "non return valve" in exhaust system.
141LCA Engines xvii(s) Check that there is no abnormal play in the steering.
142LCA Engines xviii(t)Drain and flush the cooling system.
143LCA Engines xix(u) Clean and touch up paint.
144LCA Engines xx(v) Replace the universal joint and exhaust bellows between the engine"s exhaust bend and the cover"s exhaust pipe.
145LCA Engines xxi(w)Replace wiring for bilge pump
146LCA Engines xxii(x)Fresh water cooler to be chemically cleaned and pressure tested as per ser SOW 7. Test Pr - 6 Kgf/cm2
147LCA Engines xxiii(y)Wiring and faulty relays for trim operation to be renewed
148LCA Engines xxiv(z)Engine Safety circuit checks to be carried out for 04 in nos LCAs. Defects if any to be rectified.
149LCA Engines xxv(aa)Throttle control mechanism for 04 in nos LCAs, each with 02 in nos engines, gets stuck occasionally. Mechanism to be overhauled and control cables to be checked for serviceability and renewed for beyond reliable repairs.
150LCA Engines xxvi(ab)Renew impellers on engine driven sea water pumps. Mat - Hard rubber
151LCA Instrumentation iCalibrate following gauges of LCA as per SOW 10.(a)RPM gauges (0 - 4600 )
152LCA Instrumentation ii(b)Lub oil pr gauge (0 to 12 Kgf/cm2)
153LCA Instrumentation iii(c)Fuel Pr Gauge (0 to 12 Kgf/cm2)
154LCA Instrumentation iv(d)Pressure gauge (for turbine)
155LCA Instrumentation v(e)Trim Gauge (0 to 32 MM)
156LCA Instrumentation vi(f)Temperature Gauge (0 to 1200C)
157LCA Instrumentation viiCalibrate following sensors of LCA as per SOW 10. (a)Temperature Sensor (0 to 1200C)
158LCA Instrumentation viii(b)Pressure sensor (0 - 4 Kgf/cm2)
159LCA TRIALSTrials: Sea trial of one hour each to be conducted on four LCAs post liquidation of all defect list serials (H, E, L). Engine and steering gear to be proved for optimum performance to reach a max speed of 30 Knots. All defects during trials including fuel, Lub oil, coolant leakages to be liquidated by Firm.
160i (MANDOTARY SPARES) CO2 CONTROL PANELSFUSES
161ii (MANDOTARY SPARES) CO2 CONTROL PANELSCONTACTORS
162iii (MANDOTARY SPARES) CO2 CONTROL PANELS15 CONNECTORS
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail