| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.(As per SOR Ch-4, Sno.-2, Ref:-2.2(b)(i)) |
| 2 | Construction of sub-grade and earthen shoulderswith approved material obtained from borrow pits with all lifts and leads, upto 1 Km transporting to site, spreading, grading to required slope and compacting to meet requirement of 97% of Proctor density.(As per SOR Ch-, SNo.-10, Ref:- MoRT&H 305 (3.18)) |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement ofof 95% of Proctor density.(As per SOR Ch-, SNo.-9, Ref:- MoRT&H 305 (3.18)) |
| 4 | Cement Concrete with 40 mm gauge approved Stone ballast ,approved Coarse sand and cement in the proportion of 4:2:1 including supply of materials , labour , T&P etc. required for proper completion of works.(As per SOR Ch-5, Sno.-6, Ref: 279) |
| 5 | M-150 sub class (A) Brick work in 1:3 Cement and coarse sand mortar in foundation and plinth including supply of all materials , labour , T&P etc. required for proper completion of works.(As per SOR Ch-6, Sno.-1, Ref: 306, PWD Sp. No. 6.2.1) |
| 6 | 12 mm thick plaster with cement mortar in proportion of 1:3 cement and sand of 1.25 F.M. over brick work including supply of all materials , labour , T&P etc. required for proper completion of works.(As per SOR Ch-13, Sno.-5, Ref: 582) |
| 7 | M-150 Brick on Edge (BoE) laid dry , joints filled including preparation of base to proper slope and its ramming including supply of all materials , labour , T&P etc. required for proper completion of works.(As per SOR Ch-14, Sno.-5, Ref: 615, PWD Sp. No. 14.2.1) |
| 8 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (Using Brick Ballast).(As per MoRTH ref no. 2504, Sl. No. 16.5) |
| 9 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.(As per MoRT&H Sno.- 16.4 Ref:- 2504) |
| 10 | Add GST @ 12% on Item No. 1 to 9 |