Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Maintenance Of Scada System And Various Summer Cooling Appliances At Ins Vajrakosh Site E Under Ge Sb Karwar Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Mainten, CWE (NAVY) VASCO-Goa

Military Engineer Services-MES has published Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Maintenance Of Scada System And Various Summer Cooling Appliances At Ins Vajrakosh Site E Under Ge Sb Karwar Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Mainten. Submission Date for this Tender is 27-12-2021. Air Conditioner Tenders in CWE (NAVY) VASCO Goa. Bidders can get complete Tender details and download the document.




Tender Notice

30085433
Corrigendum : Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Maintenance Of Scada System And Various Summer Cooling Appliances At Ins Vajrakosh Site E Under Ge Sb Karwar Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Mainten
Open Tender
Indian
Goa
CWE (NAVY) VASCO
27-12-2021

Tender Details

Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Maintenance Of Scada System And Various Summer Cooling Appliances At Ins Vajrakosh Site E Under Ge Sb Karwar Manning And Operation Of Ac Plant 1300 Tr Capacity Including Routine Maintenance Of Scada System And Various Summer Cooling Appliances At Ins Vajrakosh Site E Under Ge Sb Karwar

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 13-Dec-2021 DATECORRI Date 27-12-2021

Key Value

Document Fees
INR 1000 /-
EMD
INR 159955.0 /-
Tender Value
INR 89.97 Lakhs /-

BOQ Items

NAME OF WORK :- MANNING AND OPERATION OF AC PLANT 1300 TRCAPACITY INCLUDING ROUTINE MAINTENANCE OF SCADA SYSTEM AND VARIOUS SUMMER COOLING APPLIANCES AT INS VAJRAKOSH SITE "E" UNDER GE(SB) KARWAR
Sl. No. Item Description
1SCHEDULE "A" - PART I (M&O OF AC PLANT)
2Manning & operation of central AC plant of total 1300 TR capacity installed at MTP areawith package chillercondensing unit for LR-SAM magazines of 900 TR capacity of approved make and BROHMAS magazines of 400 TR capacity of approved make completeincluding SCADA system of Make : HoneywellwithAHU & other accessories each for 24 hrs3 shifts around the clock run daily
3a) Air cooled package chiller unit of approved make-03Nos , for LR-SAM magazines. b) Air cooled package chiller unit of approved make- 02Nos , for BROHMAS magazines. c) Compressor of approved make - 6 Nos for LR-SAM d) Compressor of approved make - 4 Nos for BROHMAS e) Condensor fan motor of capacity 3 HP/2.2 KW - 48 Nos for LR-SAM f) Condensor fan motor of capacity 1.5 KW - 32 Nos for BROHMAS g) Primary water pump motorof capacity 15 KW of approved make -03Nosfor LR-SAM h) Primary water pump motor of capacity 11 KW of approved make-02Nosfor BROHMAS i) Primary water pumpof approved make-03Nosfor LR-SAM j) Primary water pumpof approved make -02Nosfor BROHMAS
4k) Secondary water pump motor ,capacity 37 KW of approved make-03Nosfor LR-SAM l) Secondary water pump motor ,capacity 37 KW/50 HP of approved make-02Nosfor BROHMAS m) Secondary water pumpof approved make -03Nosfor LR-SAM n) Secondary water pumpof approved make -02Nosfor BROHMAS o) Air handlingunit model ZDHRW-250 of capacity 25000 cmhwith blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -19 Nos of approved make for LR-SAM p) Air handlingunit model ZDS-80 of capacity 8000 cmhwith blower motor, cooling coil, heater bank, humidity and temperature controller, electric panel complete -10 Nos of approved make for BROHMAS q) Hot water generator 2 steps 415 volts of capacity- 12 Nos of 30 KW of approved make for LR-SAM r) Hot water generator 3 steps 415 volts of capacity- 10 Nos of 15 KW of approved make for BROHMAS s) SCADA system of approved make with connected accessories
5NOTES:- (a) Contractor has to employ minimum following staff for Manning and operation of the Main receiving Substation at Vajrakosh in all 3 shifts 8 hours each. (i) One No MCM / Supervisor having minimum qualification Diploma inRefrigeration & Air Conditioning Engineering from recognized institute with adequate experience in one shift of 8 hrs (Total - 01 No per day) (ii) One No operator having minimum ITI qualification in Ref Mech trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of AC plants in each shift of 8 hrs (. The operator must be competent to caryout the routine maintenance &check of AC plant including maintenance/check/inspection of electrical panel board.. (Total 03 Nos Per day) (iii) One No Electrician highly skilled / operator having minimumqualification of Diploma in Electrical Engineeringfrom Govt recognized institute with adequate experience in each shift of 08 hours (Total 03 Nos Per day) (b) Contractor will maintain proper records of all kinds of daily, weekly , monthly, quarterly, half yearly, yearly or whatsoever maintenance is carried out during contract period in a binded book/register and will obtain the signature of Engineer-in-Charge
6(c ) The operator will ensure general cleanliness and upkeep of the installation on daily basis. (d) Contractor shall maintain log sheet of installations,lodging of complaints if found defects in plants,monitoring of PLC including taking care of chiller plants,monitoring of make up water tanks , pilferage theft or damages etc. (e ) Defective parts of plants will be replaced and measured under respective item of this schedule. (f) Power supply for operating the installations will be made availiable by department free of cost. (g) If the Contractor fails of provide required man power for any of the shift, a panelrecovery at the double of the quoted rate per shift shall be recovered from amount due to Contractor. (h)The Contractor shall not employ same tradesman continuously for more than 11 months
7(J) The rates quoted shall be inclusive of all taxes ,cess, levies etc as applicable including GST (K) The prevailing rate,wage,contribution etc shall be as applicable as on the bid submission end date. (l) In view of COVID-19 alerts various restrictive instructions issued concerned authorities from time to time. Hence additional precautions essential for the work shall be taken by the contractor by way of provisioning of masks, hand sanitizers, gloves etc to workmen and all local instructions issued by the Concerned Authorities and Station Authorities shall be complied with all relevant safety precautions covered under Model Rules for the protection of health and sanitary arrangement for workmen (Annexure ‘C’) of IAFW-2249) shall be strictly followed. Nothing extra is admissible on this account (m) The contractor shall also deploy additional man power as relief against weekly off,leave,holidays etc all as per existing Labour Act and shall substitute the operator accordingly for which no extra payment admissible. The unit rate quoted against items in Schedule ‘A’/BOQshall be inclusive of this provision also. (n) The contractor shall pay the wages to the operator through e-payment i.eAadhar linked bank accounts and Credit to their bank account. The wages shall not be less than prevailing minimum wages fixed by state Govt or central Govt whichever is more.
8(o) It is responsibility of contractor to deposit the employees provident fund (EPF) to the concerned authority as per the prevailing scales as laid down by the Ministry of labour for all Electrician/operator/helper (as applicable) and necessary proof to this regard shall be submitted to Engineer-in-Charge for verification and records. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, he shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding. (p) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to GE and as well as officers detailed by labour department.
9SCHEDULE "A" - PART II (ROUTINE MAINTENANCE OF LRSAM & BROHMAS AC PLANTS INCLUDING SCADA SYSTEM )
10M&L for dismantling electric motor of any make, 3 phase 415V of following capacity, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding as per manufacturer design including varnishing & drying and re-assemblingthe motor, connecting with proper alignment and testing complete including transporting to workshop for rewinding complete all as specified and as directed.
11(a) 20 HP
12(b) 50 HP
13(c ) 5 HP
14(d ) 2 to 3 HP
15(e)0.5 to 1 HP
16M & L for Servicing of water pump split casing type set by removing & dismantlingpump andconnected pipes & electric connections etc and replacing of unserviceable parts with new gland packing set Gun metal bushes, bearing, water seal packing complete cleaning of impeller greasing etc reassembling and refixing in original position complete with packing and necessary nut & belt etc including testing for smooth functioning etcof following capacity all as specified and as directed
17(a) 20 HP with discharge of 183.9 cum and head 20 mtrs
18(b) 50 HP with discharge of 183.9 cum and head 54 mtrs
19(c ) 0.62 HP with discharge of 3.1 cum and head 27.4 mtrs
20Supply & charge refrigerant (R - 134A) gas as per requirement all as specified and as directed
21Replacement of compressor oil BSE 170 with new compressor oilall as specified and as directed
22Replacement of compressor oil Grade DB 18 with new compressor oil all as specified and as directed
23S & F in repairof crank case heater 300 W all as specified and as directed
24Labour only for routine maintenance of AHU with control panel including cleaning of blower fan and drain tap,cleaning & servicing of dampers linkages for free operation, adjustment of belt tension/replacement of same,if requiredcleaning of blower, oiling and greasing of blower motor testing functioning of thermostate and sensors of complete AHU, checking functioning of heater strips, cleaning of chilled water coil, replacement of broken/worn out connection cable lugs & connectors, replacement of unserviceable electrical accessories in panel complete all as specified and as directed
25Labour only for routine check up & maintenance of electric power panel,of 1300 TR plant by tightening all incoming/outgoing connections including replacement of blown off electric fuses, defective contactors, indicating neon lamps assembly , indicating meters, checking earthing of panelmaking fresh connections, settings of overload relays and furnishing the report all as specified and as directed
26Labour only for routine check of electronic protection module and control panel for compressor, tighening of all loosened electrical connections testing functioning of thermostats,time delay setting and furnishing test report of thesame in format approved all as specified and as directed
27Supply laying and testing in cable PVC insulated screened PVC bedded galvanised steel strip or wire armoured electric power cable (heavy duty) with copper conductor 1100 volts grade cross sectional area 50 Sqmm 3.5 core laid on wall/ ceiling / duct all as directed including taking down old cable all as specified and as directed
28All as per Item No. 11here in before but 35 sq mm 3.5 core all as specified and as directed
29S&Fin repairs analogue type voltmeter of 0 to 500 V range AC
30S&Fin repairs digital type ammeter of 0 to 200Amperes,CT operated
31S&F in repairs Water Flow Switchall as specified and as directed
32S&Fpressure gauge 0-150 PSI all as specified and as directed
33S&Fpressure gauge 0-300 PSI all as specified and as directed
34S&Fin rep Filter drier core for 200 / 300 TR Central AC Plant all as specified and as directed
35S&FV fan beltfor AHU of any size all as specified and as directed
36Labour only for Non Comprehensive Routine maintenance checkup of SCADA systemwhich includes inspection of controls & control panels , operational test of controls & control panels , full function tests of equipmentincluding checkingof Sensors, actuators,temperature/ humidity duct sensor, immerson temperature sensors,differential pressure switches, room humidity sensors,electrical wiring ,connectionsfor free operation, adjustment of relays ,sensors /replacement of same , checking functioning of sensors,actuators, cleaning of sensors, actuators , replacement of broken/worn out connection cable lugs & connectors, replacement of unserviceable electrical accessories in panel complete by authorised service engineer of OEM and furnish the report to Engineer-in-charge.
37S&F in repairs duct temperature sensor of approved make all as specified and as directed
38S&F in repairs Air differential pressure switch sensor of approved make all as specified and as directed
39S&F in repairs Combined Room Humidity / Temperature sensor of approved make all as specified and as directed
40S&Fin repairs DDC controllerof approved make all as specified and as directed
41S&Fin repairs chilled water actuator of size 50 mm complete all as specified and as directed
42All as per Item No.25 here in before but of size 100 mm
43S&Fin repairs hot water actuator of size 40 mm complete all as specified and as directed
44S&Fin repair discharge pressure translators of existing make complete all as specified and as directed.
45S&Fin repair suction pressure translators of existing make complete all as specified and as directed.
46S&Fin repair chilled water temperature sensor of existing make complete all as specified and as directed.
47S&Fin repair discharge temperature sensor of existing make complete all as specified and as directed.
48S&Fin repair loadunload solenoid coil of existing make complete all as specified and as directed.
49S&Fin repair controller keypad of existing make complete all as specified and as directed.
50S&Fin repairs MCCB 250 Amps,3 pole,breaking capacity 55 KA, 415 V , all as specied and as directed.
51M & L in repair of Thermostatic Expansion valve TGEN type suitable for 200/300 TRunit havingrefrigerant gas R134acomplete all as specified and as directed
52S & F in repair of Electronic expansion valves ETS 250 suitable for 200/300 TR unit having refrigerant gas R134a complete all as specified and as directed
53S&F in repair Power contactor 2NO + 2 NC , 3TF54 of make siemens of 250 Amps current rating all as specified and as directed
54Supply & Fix in repair Power contactor 2 NO + 2 NC , 3TS50 3 pole 440 volt ,105 Amps suitable for 55 KW motor all as specified and as directed
55M&L for dismantling electric motor of any make, 3 phase 415V of capacity 200 TR, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding as per manufacturer design including varnishing & drying and re-assemblingthe motor, connecting with proper alignment and testing complete including transporting to workshop for rewinding complete all as specified and as directed.
56Pumping down the plant to preserve the existing refrigent gas & leak testing of 200/300 TR chiller package unit by charging of Nitregon gas in to entire plant & monitoring for 24 Hrs to find the leakages, rectification of leak by brazing and replacement of necessary gasket packing as when required including copper tubes of suitable size vacumizing of the plant by vaccum pump to the plant & topping of refrigent if required to maintain the standard pressure and testingthe plant for smooth functioning complete all as specified and as directed.
57S&F in repairs UPS of capacity 1000VA/600Watts having back up of 45 minutes suitable for 230 Volts of approved make all as specified and as directed.
58S&Fin repairs UPS of capacity 700VA/420Watts having back up of 6-90 minutes suitable for 230 Volts of approved make all as specified and as directed.
59Removing old unserviceable insulation of chilled water pipe line and cleaning the surface & applying one coat of TPRA coat & M & L for wrapping on MS Chilled water pipe line with 50/40 mm thick fiber glass wool moulded to shape the thermal insulation in selection of 50 mm crown wrapped with chicken mesh wire netting 20 SWG and 20mm mesh & aluminium cladding with 24 SWG aluminum sheet on 150/100 mm dia MS chilled water pipe line complete all as specified and as directed.
60S&F in repairNitrile insulation layers of size 25 mm thickness sticking on the chiller surface by using approved adhesive and ceiling joint by weather proof tape after removing unserviceable nitrile insulation from the chiller & cleaning all as specified and as directed.
61M&L for applying one coat of synthetic enamel paint as per colour code with spray machine on surfaces of 3X300+ 2x200 TRcentral AC plant comprising of chiller, compressor motor, Pump, water pipe lines etc by filling cavities if any with filler including preparation of surfaces & indication markings all as specified and as directed.
62S&F in repair step controller display for hot water generator complete all as specified and as directed
63S&F in repair power supply 12 V for water generator complete all as specified and as directed
64S&F in repair step controller card for hot water generator complete all as specified and as directed
65S&F in repair sensor wire for watergenerator complete all as specified and as directed
66S&F in repair mini float switch for watergenerator complete all as specified and as directed
67S&F in repair adapter for hot watergenerator complete all as specified and as directed
68S&F in repair MNX 22 contactor for hot watergenerator complete all as specified and as directed
69S&F in repair thermostat forhot watergenerator complete all as specified and as directed
70S&F in repair heater cap 5 KW for hot watergenerator complete all as specified and as directed
71S&F in repair auto manual switch for hot watergenerator complete all as specified and as directed
72S&F in repair contactor BMS with no point forhot watergenerator complete all as specified and as directed
73M&L for PCC foundation ,antivibration pad and modification of pump foundation / pipe line by cutting,welding for existing pipe line of suitable size and shape for chiller unit complete all as specified and as directed Notes:- (i) Size of PCC foundation as per site conditions and as per manufacturer"s instructions. (ii) Sound engineering practice shall be employed for cosntruction of foundation
74Taking down old unserviceable CI butterfly valve of any make and size and supply,fixing, testing and commissioning of butterfly valve (manual) with CI body SS disc,Nitrile rubber seal & O -ring PN 1.6 pressure rating for chilled water circulation in the chilled water plumbing duly insulated to the same specifications as the connected piping and adequately complete all as specified and as directed
75(a) For size 300mm
76(b) For size 200mm
77(c ) For size 150mm
78(d ) For size 125mm
79M&Lin repair for insulation of MS pipe with PUF slab 40 mm thick width and including applying bituminous compound and GI cladding with 26 gauge GI sheet complete of sizes as shown as per specifications and as required complete all as specified and as directed
80(a) 200mm
81(b) 150mm
82Supply,fixing,testing and commisiioning in repair of balancing valve with built in measuring facility with CI body flanged construction with EPDM coated disc with long pitch with protected out pipe insulation & PN 16 pressure rating for chilled water circulation in the chilled / hot water plumbing duly insulated to the same specifications as the connected piping and adequately supported as per specifications complete all as specified and as directed
83(a) 200mm
84(b) 150mm
85SCHEDULE "A" - PART III (ROUTINE MAINTENANCE OF VARIOUS SUMMER COOLING APPLIANCES)
86Taking out split type ACs, of any capacity and make installed at various locations, checking the defects including replacement of defective/unserviceable parts except compressor and fan condenser motor/blower motor including refixing in its position/new position and making the equipment functional complete all as specified and as directed.
87M&L for periodical maintainance of splitAC of 1.5 / 2 Ton capacity including cleaning of overhead ceiling supported indoor unit complete, blower, outdoor unit, wiring system, cool air vent, cleaing including oiling / greasing of movable parts of indoor unit such as motor bearing etc, fresh electrical connections, checking insulation of wiring etc complete, all as specified and as directed.
88S&F in repairs reciprocating / rotary compressor single phase 230 V, 1.5 / 2 Ton capacity for split AC of exisiting makesuitable for splitAC factory tested including taking out old compressor, pumping down refrigerant, bracing and flaring, topping up of refrigerant (labour only) connecting, testing and commissioning the compressor all as specified and as directed.
89S&F in repairs,fan motor single phase 240 Voltsfor in door unit of any capacity forsplitAC suitable for 1.5 ton existing make ,RPM & setting with remote unitall as specified and as directed.
90S&F in repair overload relay for 1.5 / 2 Ton compressor of Split ACcomplete all as specified and as directed.
91S&F in repairs capacitor of 1.5-2 mfd,suitable for indoor unit of split AC plastic body complete all as specified and as directed.
92Supply and fixing /lay PVC pipe of size20 mm dia pipe fixing complete to wallfor drain out condensing water of split AC including cutting of floor /opening of hole in wall and making good surface after laying/fixing pipe etc to matching existing surface all as specified and as directed.
93S&F in repairs PVC air filter for split AC of any capacity all as specified and as directed.
94M&L for gas charging with R-22 referigerant gas of required quantity including all allied work such as vaccumising the complete system, pressure test for detecting any leakage, replacement of flux, flare, nut, dead plug, dead cap, brazing etc including necessary welding work, testing and commissioning upto satisfactory performance for the following all as specified and as directed.
95S&Fin repairs fan blade for split AC of any capacity all as specified and as directed.
96S&Fin repairs capacitor 45 mfd 230 Volt single phase all as specified and as directed.
97S&F in repairs coil sensor of split AC or package type AC of any capacity all as specified and as directed.
98S&Fin repairs remote control assembly and PC circuit for split type AC of any capacity all as specified and as directed.
99S&Fin repairs Voltage stablizer of 4 KVA suitable for 1.5 / 2.00 Ton split AC all as specified and as directed.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail