| 1 | Earthworkinexcavationoffoundationinallkindsofsoil includingmoorum,stonyearthmixedwithboulders(except sheet rocks and boulders requiring blasting) with all leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if requiredfortheworksetc.completeasdirectedbythe Engineer-in-charge. |
| 2 | Filling in foundation and plinth with fine course sand free from organic and materials, well watered and rammed including all cost conveyance, royality taxes and all labour T&P articles required for the work etc. complete as per the specification and direction of Engineer-in-charge. |
| 3 | Cement concrete (1:3:6) using 4 cm. and downgraded size crusher broken granite metal of approved quality quarried free from weathered skin quarry debris and foreign materials including lifting the materials hoisting, lowering and laying the concrete to required level ramming finishing including curing for the required time etc. complete in all respect to proper slope and level including cost, conveyance, royalty and other taxes of all materials etc. complete in all respect as directed by the Engineer in charge. |
| 4 | R.R. stone masonry in Cement mortar (1:6) with hard broken granite stone of 30 cm. and above size in all direction (weighing 160 lbs/cft. & above) quarried free from weathered skin of approved quality in foundation plinth and superstructures with splays cutting and circular molding where necessary including cost, conveyance, royalty and other taxes of all materials including watering curing for the required time with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer in charge. (Mortar consumption is to be 0.34 cum. per One cum. of masonry). |
| 5 | R.C.C.work ofM-20 in column base and footing and column stem upto plinth level having aminimum comprresive strength (in work test) 150 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS 516 using 12mm size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance, royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.(a) R.C.C. Plinth bend |
| 6 | (b) Roof Slab |
| 7 | Supplying, fittingandplacinguncoatedHYSDbar reinforcement complete as per drawing and technical specification including cost, conveyance and excluding GST of allmaterialswithlabour, cessand T&Petc. requiredforthe work complete. |
| 8 | Fly ash brick work in cement mortar (1:6) after immersing brick for six hours in water before use in superstructure with good quality of brick 23cm x 11 cm x 8 cm size having crushing strength not less than 75Kg. Per Sqm. Including splays cutting circular molding and similar such type of work with necessary projections, chamfering and corbelling watering and curing etc. complete including cost conveyance and Royalty, Cess of all materials with all taxes and all labour with T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-charge. |
| 9 | 20mm thick cement plaster in Cement mortar (1:6) over stone work with curing and cost conveyance, royality of all materials and all labour T&P etc. complete as per specification and direction of the Engineer-in-charge. |
| 10 | 12mm thick cement plaster in Cement mortar (1:4) to brick work including cement puning and two coat bitumen painting with curing and cost conveyance, royality of all materials and all labour T&P etc. complete as per specification and direction of the Engineer in charge |
| 11 | Supplying, fitting and fixing of Vitrified tile in floors of size 600mm x 600mm of approved make conforming to IS 13755 laid on 20mm thick cement mortar (1:4) (1 cement : 4 course sand)and filling joints with white cement of approved quality including cost of all materials, labour, T&P etc. required for the work all completeas per direction of the Engineer-in-charge (For New work only). |
| 12 | Sal wood work in files trussed purlins and frame of roof structure excluding cost of wood comp( Labour only) |
| 13 | Seased Sal plankswith 32 mm thick for wall frame including cost of all fitting & fixing excluding cost of wood. (Labour only) |
| 14 | Seased teak planksfor wood panelling with 32 mm thick over the sal planks including all fitting and fixing excluding cost of wood etc comp .( Labour only) |
| 15 | 25 mm thick piasal wood or teak wood ledged,braced and planked 25 mm thick ledged and braced and 25 mm planked shutter completed with iron fittings.wooden hinged cleates etc fixed in position including all labour charges but excluding the cost of iron fittings (Labour Only) |
| 16 | 2.5 cm thick Artifical Stone Flooring with cement concrete (1:2:4) including punning using 12mm size crusher broken granite chipsas per direction of Engineer-in-charge. |
| 17 | Providing Supplying fitting & fixing of Ply wood board for ceilling including cost of all materils etc. complete. |
| 18 | Painting two coatover a coat of Priming with any approved paint to doors, windows iron works including all labour T&P articles required for the work etc complete as per the specification and direction of the E.I.C. |
| 19 | Finishing wall Surface with weather coat with all cost, covneyance etc. complete. |
| 20 | Painting two coats over coat of priming including primer with all cost, covneyance taxes etc. complete. |
| 21 | French polishing to wood work two coat with any approved paint on new wood work including all cost of materials etc comp. |
| 22 | Wood oilingtwo coat with any approved paint on new wood work including all cost of materials etc comp. |