|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrockrequiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 2 | Road |
| 3 | Conveyance and Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification.For 1M3 |
| 4 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. |
| 5 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. |
| 6 | Providing and laying Prime Coat overWBM/ WMM surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminious construction over it, including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete |
| 7 | Providing and laying Tack Coat over WBM/ WMM surface (treated with printer) using 2.50kg of Bitumen Emulsion (RSI) per 10 sqm for preparatory to another bituminous construction over it including cost of material, Labour charges rentals for machinery, fuel and all other incidental charges etc., complete |
| 8 | Providing and laying 50 mm compacted thick dense bituminous macadamusing 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70bitumenfor premixing per 10 sqm including cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. |
| 9 | Providing and laying Bituminous concreteto 30mm thickusing 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with45.27 kgs of 60/70bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) andfor premixing per 10 sqmincluding cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm/ 30mm with mechanical paver to the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. |